ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Winter shutdown 08/09 Summary of HV interventions Barrel Muon Workshop, 02/09 Jesús Puerta-Pelayo, CIEMAT 17-February-2009.
Assembling a Functional Multi-Wire Proportional Counter - Page 1 Work in pairs. One person will take the chamber apart, and the other will reassemble it.
Meeting on status and plans of the LP subsystems for the LP beamtest at DESY 02/25/2008 Franck SENÉE1 LP-TPC: Micromegas Panel and Cosmic Muon Trigger.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
Chamber production status 75% of production (of 1st half of detector) reached in May Currently ~80% is produced 100% (1st half) expected in October. End.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
UPDATE ON CMS RESISTIVE PLATE CHAMBERS CMS RPC Barrel Collaboration GR1, 5 Aprile 2004.
Walls crates cables gas chambers electronics CERN adb.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
January 25, 2003Richard Talaga1 High Voltage Distribution for RPCs Simple Model of Detector & HV Specifications & Requirements Simple HV Distribution Layout.
K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site1 (Selected Items on) Quality Control at Aachen.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
Barrel Maintenance Scenario for LS1 MUON-IB CMS week 11 December 2012 A. Benvenuti (INFN Bologna)
Chamber Construction QC at CIEMAT B. de la Cruz CIEMAT (Madrid) CMS Week June 2002.
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
RPC Cosmic Rays Test in Naples Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino,R. de Asmundis, M. Della Pietra, D. della.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2012 – Dec – 12 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
Shandong University TGC Site Review Review team General impression Material presented Possible improvements Action items Conclusions.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
1 DT critical items status: HVBoards Control and Trigger Boards Assembly in Torino fgasparini june 2004.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
From Bare Chambers to Installable Chambers Muon Barrel Week Bologna April 11 th 2003 Alberto Benvenuti INFN Bologna.
Front End Board (16 channels) Superlayer Cross Section Frontend Enclosure HV cap board HV cap Board Signals from chamber wires go to HV cap board to be.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
8/September/2008Calo Running and Operation Meeting 1 SPD running and operation: progress report and plans Calo running and operation meeting – CERN 8 th.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Cathode Production Status Muon Week April10th 2003 A. Benvenuti INFN Bologna.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Test beam straw prototype production status
ESR for the muon DT Minicrate System
Production ad Quality control of RPCs for the CMS muon barrel system
VELO-installation meeting CERN, January 17, 2006
CMS WEEK Sept. 24 Opening session CMS MUONS: Barrel Drift Tubes
DT & RPC Grounding STATUS
ESR for the muon DT Minicrate System
DT Infrastructure: LV, HV, Gas
RPC Readiness for installation
Presentation transcript:

ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna

Chamber Stacks Layout In I3-I4 Tunnel (part 1) MB1-N1 MB1-N5 MB1-N4 MB1-N6 Stack -1  All chambers under Gas  Chamber stacks rearranged following gluing of RPC pads on MB2s and arrival of CIEMAT table for cosmic ray test  Space for moving chambers between table and Stack -1 MB1-P11 MB1-P12 MB1-P10 MB1-P08 Stack –2 MB3-P08 Under Test MB2-P4 On Alignment bench

Legs must be mounted on chambers to support on iron blocks

Chamber can be moved with simple supports through the alignment passages Cabling and access to front-end much easier/faster

Chamber Stacks Layout In I3-I4 Tunnel (part 2) Chambers under HV HV problems: MB2N11: Phi1 B connector clicking badly MB2N12: Phi1 A short, Phi1 B OVC at 3000V MB2N09: Phi2 B OVC MB2P18: Phi2 A OVC at 3400V MB2P19: Theta B connector clicking badly MB1N03: discharges inside Phi2 B connector MB1N02: Phi1 A layer 0 board e (at acceptance test) Stack 2 MB3-P06 MB3-N12 MB3-P10 Stack 1 MB2-N14 MB2-N13 MB2-N12 MB2-N09 MB2-N11 Stack 3 MB2-P18 MB2-P19 MB2-N16 MB2-N15 MB2-P17 MB1-P7 MB1-N3 MB1-P9 MB1-N02 Stack 4 Work table to solder HV connectors….

Chamber Stacks Layout In I3-I4 Tunnel (part 3) Stack 6 MB3-N05 MB3-P04 MB3-N03 MB3-P02 MB3-P14 Stack 5 MB3-P18 MB3-P16 MB3-N11 MB3-P12 MB3-N01 Chambers under HV Gas Problems  One wrong connector glued to gas cover (bad thread) P02 7 gas caps glued to gas cover MB3 N1 (Phi2, 2), P14(Tht,1), P4(Tht,1),N3(1 on each SL) Stack 8 MB2-P06 MB2-P07 MB2-P15 MB2-P05 MB2-P02 Stack 7 MB2-P23 MB2-P22 MB2-P21 MB2-P20 MB2-P24 HV Problems: MB3N11: Theta B clicking badly MB3N03: Phi1 A Layer 0 board e Phi2 B wire short MB2P24:Phi2A Clicking badly MB2P21 Phi2A OVC

Chamber Stacks Layout In I3-I4 Tunnel (part 4) 12 MB1, 23 MB2 +1(SX5), 15 MB3 No space left for additional stacks Move MB minus to other side of tunnel (vacated by ATLAS) Set-up shelves for HV cables and Balance beams MB2-P7 MB2-N10 Stack 9 MB3-N07 Stack 10 HV Problems: MB3N07: Phi1 B OVC and badly clicking Gas distribution pending on the arrival of a valve 375/3 Entry

DT Chamber Status All Chambers are complete with RPC Pads Alignment pins are missing on 1 MB1, 14 MB2, 8 MB3; 3MB2 have shorter pins Alignment pins are NOT standard CERN items they must be sent from production sites Alignment passages are often dirty, with a lot of white dust. They should be cleaned at the sites. Reference blocks should be cleaned of excessive glue All chambers are under gas flow All chambers have gone through the HV acceptance test 25 chambers are under HV: 3 MB1, 7 MB2, 14 MB3 Leak test still in progress for last MB2 Shipment (Gerd, Paolo) Cosmic tests done on ~17 MB2, 2 MB3, 5MB1 Phi, 2MB1 Theta Scaler test on 5 MB1, 4 MB2, 2 MB3 (Chiara)

MB1: N03, N02 MB2: 7 old + 2 new HV boards replaced N09, N11, P18, P19,P21,P24,P04, N12 MB3: N03, N07, N11 3 Dead Boards (Still inside chamber) 10 discharges probably outside cell Improve protection of unused HV pins

Scaler Test 7 Scalers with 32 channels => 224 not sufficient for one full SL (extend to full MB3) Gate opened for 1 second 1000 samples for Noise (16 and 20 mV) 100 samples with pulser SL grounded to HC frame and to external ground HV distribution: one channel/chamber connected to ground on SL Front end cable ground shield connected to SL cover Uniform conditions for all chambers Test can be done with chamber on Stacks

MB1

MB2

MB3

MB2 with problems

MB1 more quiet than MB2 and MB3 only difference is the external ground => Check! Continue Scaler test to all chambers Map Scaler output to standard SL numbering Compare with results from sites but Noisy channels with rate available on travelers only for MB1

MB3N07 Theta SL

MB3N07 Theta SL

MB3N07 Phi1 SL

MB3N07 Phi1 SL

MB3N07 Phi2 SL

MB3N07 Phi2 SL

Theta SL Noise from HV Phi2 SL No noisy Channels

Phi1 SL Noisy channel Noise from HV supply is a recurring problem Will use same supply for all chambers and grounding scheme Compare different Chambers and types Use HV distribution one channel/chamber but with DT specific map NO HV connection to unused pins Use HV junction boxes as soon as prototypes are available

Schedule Kerstin and two technicians from Aachen will come to work on MB1 chambers in week 21 and 22 (May 19 th to 31 st )