12.12.2008 SuperKEKB 1st open meeting 1 Belle calorimeter upgrade B.Shwartz, on behalf of BELLE calorimeter group.

Slides:



Advertisements
Similar presentations
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
Advertisements

Update on Electronics Activities Jim Pilcher University of Chicago 20-Jan-2006.
The Belle SVD Trigger  Tom Ziegler  Vertex 2002  Kailua-Kona, Hawaii, 4-8 th nov The Belle SVD Trigger Tom Ziegler on behalf of the Belle SVD.
1/9/2003 UTA-GEM Simulation Report Venkatesh Kaushik 1 Simulation Study of Digital Hadron Calorimeter Using GEM Venkatesh Kaushik* University of Texas.
Preliminary Design of Calorimeter Electronics Shudi Gu June 2002.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
SuperKEKB to search for new sources of flavor mixing and CP violation - Introduction - Introduction - Motivation for L= Motivation for L=
INSTR-08, BINP, Novosibirsk 1 Belle calorimeter upgrade B.Shwartz, Budker Institute of Nuclear Physics Novosibirsk on behalf of BELLE calorimeter.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
The Design of Barrel Electromagnetic Calorimeter (BEMC) October Lu Jun-guang.
Hadron Calorimeter Readout Electronics Calibration, Hadron Calorimeter Scintillator Upgrade, and Missing Transverse Momentum Resolution due to Pileup Zishuo.
Status of scintillator KLM study P. Pakhlov (ITEP)
Evaluation of Silicon Photomultiplier Arrays for the GlueX Barrel Calorimeter Carl Zorn Radiation Detector & Medical Imaging Group Jefferson Laboratory,
Recent status of dark matter search with ULE-HPGe detector Tsinghua University Qian Yue nd Korea-China Joint Seminar on Dark Matter Search.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Performance of the AMT-3 Based TDC System at Belle S.Y.Suzuki, T.Higuchi, Y.Arai, K.Tauchi, M.Nakao, R.Itoh (KEK) H.Nakayama (University of Tokyo)
A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.
T. Sugitate / Hiroshima / PHX031 / Nov.01 The Photon Spectrometer for RHIC and beyond PbWO 4 Crystal Density 8.29 g/cm 3 Radiation length 0.89 cm Moliere.
Calibration of the CMS Electromagnetic Calorimeter with first LHC data
ECL trigger for Super Belle B.G. Cheon (Hanyang U)‏ KEK 1 st open meeting of the Super KEKB Collaboration.
Lead Fluoride Calorimeter for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory October 31 st 2008.
Status of shaper prototype production B.G. Cheon (Hanyang U)‏ Dec. KEK 1 st open meeting of the Super KEKB Collaboration.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
Vertex 2005, Nikko Manfred Pernicka, HEPHY Vienna 1.
Mar. 18, 2009 HAPD ASIC Status Super KEKB Meeting 1 S.Nishida (KEK) S. Nishida HAPD ASIC Status Super KEKB Meeting Mar. 18, 2009 KEK.
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
B.G.Cheon Mini-Trigger/DAQ workshop,OCU ECL Trigger overview ByungGu Cheon (SKKU) Outline  ECL calorimeter  ECL trigger scheme & performance.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
R&D for Muon Trigger Upgrade Naohito Saito (Kyoto/RIKEN/RBRC)
FPGAs in ATLAS Front-End Electronics Henrik Åkerstedt, Steffen Muschter and Christian Bohm Stockholm University.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
Digitization in EMC simulation Dmytro Melnychuk, Soltan Institute for Nuclear Studies, Warsaw, Poland.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
BESIII EMC Simulation & Reconstruction He Miao
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
Status of E14 G.Y.Lim IPNS, KEK. E14 Experiment Step-by-step approach to precise measurement of Br( K L    ) KEK-PS E391a J-PARC E14 (Step-1) J-PARC.
Pisa - Apr. 28th, The Trigger System Marco Grassi INFN - Pisa.
Test Beam Results on the ATLAS Electromagnetic Calorimeters Lucia Di Ciaccio – LAPP Annecy (on behalf of the ATLAS LAr Group) OUTLINE Description of the.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
Preliminary Design of Trigger System for BES III Zhen’an LIU Inst of High Energy Physics,Beijing Oct
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
Vladimir Zhulanov for BelleII ECL group Budker INP, Novosibirsk INSTR2014, Novosibirsk 2014/02/28 1.
CALIFA - USC R&D activities: Designing and prototyping CALIFA a next generation calorimeter for R3B/FAIR Huelva July 07.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
 13 Readout Electronics A First Look 28-Jan-2004.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
Recent progress of PureCsI+APD readout
Mini-Trigger/DAQ workshop,OCU
Status of 100Mo based DBD experiment
Panagiotis Kokkas Univ. of Ioannina
CMS Preshower: Startup procedures: Reconstruction & calibration
EMC Electronics and Trigger Review and Trigger Plan
A First Look J. Pilcher 12-Mar-2004
CMS ECAL Calibration and Test Beam Results
Belle calorimeter upgrade on behalf of sBELLE calorimeter group
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
BESIII EMC electronics
Trigger session report
Commissioning of the ALICE-PHOS trigger
3rd Open Meeting of the Belle II Collaboration
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
Calorimeter Backgrounds
The Trigger System Marco Grassi INFN - Pisa
Conceptual design and R&D Progress of STCF ECAL
The CMS Tracking Readout and Front End Driver Testing
Presentation transcript:

SuperKEKB 1st open meeting 1 Belle calorimeter upgrade B.Shwartz, on behalf of BELLE calorimeter group

SuperKEKB 1st open meeting 2 Role of the electromagnetic calorimeter Measurement of  Energy/angle of photon (20MeV~8GeV)  Electron identification  K L detection together with KLM  Redundant trigger  Neutral trigger Measurement of the luminosity  Online/offline luminosity

SuperKEKB 1st open meeting 3 BELLE Electromagnetic Calorimeter for KEKB energy asymmetric B-factory 3 m Number of crystal: 8736 Total weight is ~43ton L cr = 30 cm = 16.2X 0 Light output ph.el./MeV electronics noise σ~200 keV

SuperKEKB 1st open meeting 4 BELLE calorimeter performance e + e    Test beam The Belle calorimeter has been exploited from 1999 up to now. It demonstrates high resolution and good performance.

SuperKEKB 1st open meeting 5 Calorimeter performance in a view of the luminosity increase. At L  cm -2 s -1 and  Ldt  700fb -1 Small increase of the dark current in the barrel Essential increase of the dark current in endcaps Caused by neutron flux (   cm -2 ) Radiation damage of the crystals In the most loaded part the light output degradation is about 10% Basically – no problem. Results in  d  MeV, still not the most annoying problem. Increase of the PD dark current

SuperKEKB 1st open meeting 6 Fake clusters (E>20 MeV) 6 fake clusters, 3 in barrel 3 in endcaps background Pile-up noise Pile up effect  , MeV

SuperKEKB 1st open meeting 7 The obvious solution is to replace CsI(Tl) crystals by the other scintillators with L  L CsI(Tl),    CsI(Tl) /10 and zero afterglowing. Lu 2 SiO 5 (Ce), LuAlO 5 (Ce), LaBr 3 (Ce) ……. ? Problems - cost and mass production We needed in a reasonable compromise…  To keep existing CsI(Tl) crystals in the barrel part.  To replace CsI(Tl) to pure CsI crystals in the end caps.  To modify all readout electronics.  To keep the present mechanical structure.

SuperKEKB 1st open meeting 8 Modification of the electronics.  Pipe-line readout with waveform analysis:  16 points within the signal are fitted by the signal function F(t): F(t) = H  f(t-t 0 )  Both amplitude (H) and time (t 0 ) are obtained by the on-line shape fit:

SuperKEKB 1st open meeting 9 Expected improvement Time information allows to suppress the fake clusters by 7 times for the barrel by rejecting wrong time clusters. For endcaps the suppression factor is about 7  30 = 200 due to the shorter decay time of the pure CsI The pileup noise will be reduced by factor  1.5 for barrel and factor  5 for endcaps:

SuperKEKB 1st open meeting 10 New and new+ ECL electronics New electronics Very New electronics

SuperKEKB 1st open meeting 11 Readout scheme for summer and autumn tests 8 Shaper digitizer were connected to ECL B3 sector (120 channels) Copper module installed in the crate near FB rack The Copper is readout by EFC PC roefc01 ECL BE 1/8 (120 ch) Obtained at the summer tests with cosmic rays Incoherent noises : 5.7 channels(330keV) (outer layers) 7.1 channels(410keV) (inner layers) 10% higher than expected Coherent noises : 1.2 channels(70 keV) for 16 channels (1 module) 0.6 channels(30keV) for 120 modules The time resolution per counter is 17/  2=12ns as expected for 35 MeV energy deposition

SuperKEKB 1st open meeting 12 A test of the new ECL electronics in the experiment Since beginning of this experiment (exp.67) up to Oct.23, morning, ECL was running with 120 channels (1/8 of the BE) connected to 8 new shaper-digitizer boards, read out by the copper module. Other ECL channels were in the usual status. In this configuration we collected about 965 pb -1 of the statistics. From this data 4 runs with 26 pb -1 was recorded without injection veto. On Oct.23, during the maintenance time, we replaced the new electronics with the old one. Nakamura-san analized the data from the local run performed after replacement and confirmed that all changed channels are alive.

SuperKEKB 1st open meeting 13 First results 6 4 Shaded area – new electronics old over 1/8 of backward endcap new lg(E(MeV)) Energy deposited in one crystal

SuperKEKB 1st open meeting 14 Timing and background One channel time distribution

SuperKEKB 1st open meeting 15 Injection study HER LER all HER all events FE.and.BE bad inj.time old new 150  s

Current Status A schematic design had been based on TKO version. Some modifications were performed after the discussion with Y.Usov. Purchase of all the parts was done in Oct. Board layout (9U-size, 6-layers) was finished in Nov. Schedule of the 1 st prototype board production/test PCB production : done in Nov. Soldering : done in this week. Basic test : 2 weeks (power line and analog part w/ pulse gen.)‏ Shipping to KEK : End of December (if no mistake is found)‏ Detail test : from KEK Revision of the board (production of the 2 nd prototype) will take much short term because we already have all parts and much less effort is necessary. B.G. Cheon (Hanyang U)‏

New VME Shaper board Preamp Input shaper FADC analog processor & sum communication

SuperKEKB 1st open meeting 18 Pure CsI in the end caps , g/cm 3 X 0, cm em, nm N( em, nm ) N ph /MeVT, ns dL/dT, %/  C Pure CsI / CsI(Tl) Properties of pure CsI and CsI(Tl) scintillation crystals To use pure CsI crystals in the end caps we had to answer several important questions: To find proper photodetector with a gain, large area and low capacity; To prove the radiation resistance of the crystals; To demonstrate the possibility to obtain the desirable characteristics.

SuperKEKB 1st open meeting 19 Photodetector 2” UV sensitive photopentods (PP), Hamamatsu Photonics C  10 pF. PP gain factor (we need > 30 in mag.eld) The gain factor drops down 3.5 times for B=15 kGs About % improvement for angle 

SuperKEKB 1st open meeting 20 Radiation hardness test with photons Radiation hardness of 4 pure CsI crystals (Kharkov) and one counter (pure CsI Crystal + photopentode) were tested with gamma irradiation. For 15 krad dose the degradation of the lightoutput for 3 crystals and counter was less than 10%, but one counter lightoutput reduction was about 60% (  all crystals should be tested before assembling). Bremsstrahlung photons, E = 0  1.4 MeV from ELV-6, BINP Absorbed doses 0.250, 1, 4, 10, 30 krad Neutron irradiation up to cm -2 did not reveal a degradation within 5%

SuperKEKB 1st open meeting 21 Counters design and properties Electronics for pure CsI crystals are developed under the same general scheme as for the barrel part but: shaping time is shorten to 30 ns; clock frequency increases from 2 MHz to 43 MHz The prototype of the shaper-digitizer module are developed, produced and demonstrated a good performance.

SuperKEKB 1st open meeting 22 Are there alternatives for light readout and fast crystals? P.P. x3 APD x2 Nara W’s Uni group Ken Jery, FU JEN CATHOLIC UNIVERSITY Nara W’s Uni group

SuperKEKB 1st open meeting 23 Summary  To keep good performance of the calorimeter at high background conditions we need to upgrade the electronics for the barrel and to replace both crystals and electronics in the endcaps.  The work for barrel electronics upgrade is in progress. The working version of the electronics has been developed.  At the next step we need in a detail test of the electronics integrated to DAQ of the Belle detector during the continuous run.  The prototype of the endcap calorimeter based on pure CsI counters with modified electronics was tested with a beam and provided the expected pile-up suppression.  More people are highly needed!  We are waiting for a decision and budget to start the crystal and electronics production.

SuperKEKB 1st open meeting 24 back up

SuperKEKB 1st open meeting 25 Electronics modication (barrel) Contains boards (FINESSE) where the signal is processed Present status: for both, shaper-digitizer and COPPER (with FINNESE), prototypes have been tested and the expected parameters have been obtained. COmmon Pipelined Platform for Electronics Redout, Front-end INstrumentation Entity for Sub-detector Specific Electronics

SuperKEKB 1st open meeting 26 Parameters determination FPGA are located at FINNESE module The algorithm of energy and time reconstruction was implemented. The online software allows: To set preliminary sparsification threshold (before FPGA processing); To set output sparsification threshold (after FPGA processing), before recording to COPPER buffer; To record amplitude, time and quality, reconstructed at FPGA; To save raw sample informatin (amplitudes of 16 points) for each or some fraction of events. According to simulation the algorithm works upto 50 kHz with occupancy < 1=3.

SuperKEKB 1st open meeting 27 Beam test at BINP

SuperKEKB 1st open meeting 28 Energy and time resolution results. The distributions are fit by convolution of the Compton spectrum and logarithmic- Gaussian. -round points pure CsI -solid line MC -rectangles CsI(Tl) beam test

SuperKEKB 1st open meeting 29 Electronics modication(endcap) Present status: modules were developed and first prototypes have been tested

SuperKEKB 1st open meeting 30 Summary of the new electronics tests and plans  System works and allows to record data from COPPER  The data evaluated by FINNESSE are consistent with that taken by the old electronics  The recorded data shows parameters close to expected.  Data quality vs. injection time are studied. A decrease of veto gate looks to be possible. Plans:  Further study pile-up noise suppression  To analyse data with sampling storage to get information about time noise correlation, as well as fit procedure and hardware reliability.  To analyse run without injection veto.  Implementation of the data from the new electronics to the standard data processing procedures: cluster reconstruction, Bhabha calibration etc.