ISE6 Test Case: Pump 1/29/2008. Demo Test Data (Documents) - Notional FOT System Tech Manual System Diagram 3D Drawing VFI Photo FOT Subsystem VFI Product.

Slides:



Advertisements
Similar presentations
24/7 Systems Mission Integrate, communicate, and analyze PLANT RELIABILITY INFORMATION From multiple plant condition, repair, overhaul, installation, and.
Advertisements

Sensor Scientific, inc.. Sensor Scientific, Inc. Temperature Sensing Solutions Sensor Scientific, inc.
27 Apr ‘06 1 STEP translator for distribution systems for ShipConstructor ISE-2 & ISE-3 follow-up CATIA V4 to ShipConstructor piping demo ShipConstructor.
ISE 6 Phase 2 Demo Scenario Nov 20, Stakeholders ISEA –NSWC PHD (Combat Systems) –NSWCCD SSES (HM&E) Program Offices –PMS 500, etc. –IWS 1 (Combat.
Interfacing with the General Ledger Richard Byrom Oracle Applications Consultant 13 th Cheque Payroll Seminar 12 th December 2001.
Draw the context and level 0 DFD
Confidential 1 1 SUBARU Service Web Customer Service Section.
Appendix: Variations in Purchasing – A/P
OO Process Steps  Define requirements Allocate and Derive requirements Map requirements to use cases Map requirements to classes  Define use cases Draw.
NNK R Attachment C.2 Specs and Drawings Listing Supplemental Guide 2/20/15.
Hydraulic Motors. Objectives 1. Explain the difference in a motor and a pump. 2.Explain the difference in a fixed displacement and a variable displacement.
Engineering Documentation
Spectrum 50 & 100 FIC Systems Up to 64 Dispense Points Up to 64 Dispense Points 1 to 4 Fluids 1 to 4 Fluids Printed Dispense Records Printed Dispense Records.
5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 1 NFPA 58, LP-Gas Code, sets out the minimum valve and fitting requirements for propane.
Rye City School District  Using Google Docs allows you to create documents, presentations, spreadsheets, forms and drawings to share, collaborate.
Forest River, Inc – Dealer Central. Available Dealer Options.
HARDWARE PARTITIONING Module 3 UNIT II RCM PROCESS " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
USER GUIDE TO OPEN OFFICE BY MARTIN ROCHE 11K. CONTENTS.
1 Fuel Pumps. 2 Pumps 1.All oil burners for residential heating have pumps A. They are connected to a motor through a coupling 2.Description A. An oil.
Prime Factors. What are they? All composite numbers can be written as the product of prime numbers. This product is known as the prime factorisation of.
Tango Asset Management Capabilities Presentation 1.Desktop & Web Architecture 2.Equipment Management 3.Condition Management 4.Data Mining 5.Parameter Trending.
2 Apr ‘08 1 DDG 1000 Logistics Data and Structure DDG 1000 Design Data and Structure Link between design and logistic data Current Logistics data import.
Reuse and Data Module Code Naming Considerations Mike Olson, Northrop Grumman IT Ted Briggs, Intergraph Integrated Shipbuilding Environment (ISE) ISE-6.
OASIS DEX workshop “Reference data” 3 February Oslo Trine Hansen - DNV.
© SAP 2007 / Page 1 Presented by Kathryn Duval SAP Business One Training Design Team TB1000 Train the Trainer SAP Business One Release 8.8 Logistics Course.
From Research Prototype to Production
7-8 SCHEDULED MAINTENANCE AND REPAIRS OBJECTIVES: 1. TO FIND THE COST OF SCHEDULED CAR MAINTENANCE 2. TO FIND THE COST FOR CAR REPAIRS Example 1 p 280.
Integrated Shipbuilding Environment
July Vehicle Selection – BMW 3 series (E46) 318i, 87kW, 1998 – 2001.
Manuals, Instructions, and Guides (oh my!) The Different Documents  Instructions  Help reader perform a specific task  Process Instructions  Narrative.
2 Apr ‘08 1 DDG 1000 Logistics Data and Structure DDG 1000 Design Data and Structure Link between design and logistic data Current Logistics data import.
Given a P&ID, demonstrate an understanding of naming conventions by deciphering drawing numbers with 90% accuracy – Given a list of drawing numbers, identify.
Design Flow 1 Mission Req (ASSET) Initial design by space Detailed Design (Equip by Comp) Zone model Compartmention Model List of comp + req Compartmentation.
Copyright © 2005, SAS Institute Inc. All rights reserved. Introducing the SAS Web OLAP Viewer for.NET Sean Alexandre Systems Developer OLAP Client Technologies.
 SAP AG 2003 Goods Receipts and Goods Issues Stock Transfers Physical Inventory Warehouse Reporting Contents: Inventory Transactions.
ISE6 Demo 1/9/2008 Virginia Beach Meeting Discussion.
Use Case diagram for the gas pump system
7.02Classify the activities of physical distribution.
Navy Configuration & Logistics DEX The storey so far (i.e. W.I.P)
ISE4 Alternate Demo Scenario Incorporates suggestions B. Kassel, S. Gordon, & B. Gischner with input from: T. Briggs and S. Moore May 23, 2005.
ISE4 Integrated Demo Ver 2 May 11, ISE4 Integrated Demo2 Revised Arrangements Demo Scenario Design agent –Export AP 216 hull form Navy –Import hull.
7 Aug Integrated Shipbuilding Environment (ISE) ISE-6 Phase 2 DDG 1000 TDWG Collaboration Data Module Code (DMC) Naming Overview.
Prof Awad S. Hanna Equipment Costs and Sources of E QUIPMENT C OST.
How does drawing a picture help us solve multi-digit multiplication? 368 x 7 =
ISE6 Context Schema Overview
Tutorial Ch 1 Ch 2 Ch 3 Ch 4.
ISE 6 Phase 2 Demo Scenario Sept 11, 2008 NSWC CD.
ISE6 Demo Scenario From 8/30/2007 Telecon. 8/30/2007 ISE6 Demo Scenario 2 Demonstration Core idea: –Use of PLCS enables: Maintaining the right configuration.
ISE6 Demo 11/14/2007 Ft Lauderdale Meeting Discussion.
March 24, ISE-6 Phase 2 Demo March 24, 2009.
1 IMPLEMENTATION OF OIL AND GAS UPSTREAM PROJECT IN MAXIMO.
Lesson 15: Cache Transfers Processing Cache to Cache Transfers.
Project is funded by the European Union Space for the Logo of your organisation TITLE OF YOUR PRESENTATION YOUR NAME AND YOUR ORGANISATION Presentation.
Laserfiche Solutions for Mid-Sized Medical Device Manufacturer I.S. Coordinator Course Number I.S. Manager Michael EklundJohn Klinkenborg RMS Company.
Project is funded by the European Union Space for the Logo of your organisation TITLE OF YOUR PRESENTATION YOUR NAME AND YOUR ORGANISATION Presentation.
Do you Have a Problem For- For-. Techiezoncall.com Techiezoncall.com Offers Online Technical Support To Global Customers, Just
Chicago Pneumatic Compressors Company Presentation
Reduce the line space; we would like to see minimum 2 line of products
Aeronautical PUBLICATIONS
Troubleshooting Hydraulic Pumps
Equipment Costs and Sources of EQUIPMENT COST
LaGov Project TENTATIVE Blueprint Schedule
DRM Installation Guide (1)
.., - I ':\ ' !' #
MISUMI University Program Cheat Sheet
Project Work Breakdown Structure
08 Detail & Images & Resources
RMA User Guide.
FIS NEW FUNCTIONALITY Teresa Fisher.
Global Aircraft Pumps Market
Presentation transcript:

ISE6 Test Case: Pump 1/29/2008

Demo Test Data (Documents) - Notional FOT System Tech Manual System Diagram 3D Drawing VFI Photo FOT Subsystem VFI Product Sheet Pump VFI Quote AP 214 File Logistics Reports Ship Info Book Ship Drawing #, rev TMINS number Or ESWBS TMINS number Catalog part number RIC

HSC Breakdown SCHB (HSC = ) EFD = F/O TRANSFER PUMP SCHB (HSC = ) EFD = XXXX SCHB (HSC = ) EFD = XXX SCHB (HSC = ) EFD = XX SCHB (HSC = 54121) EFD = PUMPS, FUEL TRANSFER, NON-COMPSG & COMPSG SYS SCHB (HSC = 5412) EFD = PUMPS & PURIFIERS, FUEL XFR, NON-COMP/COMP SYS SCHB (HSC = ) EFD = F/O TRANSFER PUMP MOTOR SCHB (HSC = ) EFD = F/O TRANSFER PUMP STRTR MTR SCHB (HSC = 541) EFD = SHIP FUEL AND FUEL COMPENSATING SYSTEM SCHB (HSC = 540) EFD = FUELS AND LUBRICANTS, HANDLING AND STORAGE

Pump Objects CPC Design Part (CAGE = ?? P/N = ?? Design Occurrence (GUID = ?? ) Ship_Class HSC Breakdown (HSC = ) EFD = F/O TRANSFER PUMP ESD = FUEL XFR PUMPS MCC = 1 MEC = V CEI = H SAC = 0BBZH SAC_NOMEN = FUEL OIL SYSTEM- TRANSFER PUMP Installed Item (Component Id = A0223) RIN = A0223 EIN = HJ-193D EIC = TD05000 PRID = 261-E1 LOC = E Repairable Part (RIC = ) NOMEN = PUMP RTY PWR 10.00GPM 17PSI 1200RPM MD Ship (UIC = 40822) VFI Product Sheet VFI Quote AP 214 File Logistics Reports OEM Catalog Part (CAGE = P/N = HJ-193D) Company = Viking Pump Inc. Need CPC Part Number for pump from a shipyard See document attributes spreadsheet for more details Ship Info Book

Fuel Oil System Objects SCHB (HSC = 541) EFD = SHIP FUEL AND FUEL COMPENSATING SYSTEM Tech Manual System Diagram 3D Drawing See document attributes spreadsheet for more details