The Tevatron Collider: A Thirty Year Campaign Fermilab Colloquium March 10, 2010 John Peoples 1.

Slides:



Advertisements
Similar presentations
ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
Advertisements

Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
Muon Coalescing 101 Chuck Ankenbrandt Chandra Bhat Milorad Popovic Fermilab NFMCC IIT March 14, 2006.
1 Methods of Experimental Particle Physics Alexei Safonov Lecture #8.
Note: most of the slides shown here are picked from CERN accelerator workshops. Please refer to those workshop for further understanding of the accelerator.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Run 2 PMG 2/16/06 - McGinnis Run II PMG Stacking Rapid Response Team Report Dave McGinnis February 16, 2006.
Run II Status and Prospects - Spalding1 Run II Status and Prospects Jeff Spalding Fermilab June 14, 2004.
A. Bay Beijing October Accelerators We want to study submicroscopic structure of particles. Spatial resolution of a probe ~de Broglie wavelength.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
Moriond 2003M. Benedikt, S. Hancock Injection and Accumulation in a High Energy Ion Storage Ring Michael Benedikt, Steven Hancock AB Division, CERN.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
SNuMI (>1MW) SNuMI 1 Motivations for SNuMI The neutrino experimental program for the next decade –NOνA (long baseline νμ→νe search) –MINERνA (Main Injector.
Eric Prebys, FNAL. USPAS, Knoxville, TN, January 20-31, 2014 Lecture 20 - Cooling 2 Anti-protons are created by hitting a target with an energetic proton.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
F Project X Overview Dave McGinnis October 12, 2007.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
F 1 MW Proton Beam for Neutrinos Dave McGinnis AAC Meeting May 10, 2006.
Celebrating the Tevatron: The Machine(s) Steve Holmes DPF2011 August 13, 2011.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
Paul Derwent 14 Dec 00 1 Stochastic Cooling Paul Derwent 14 Dec 00
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
S. Pordes - to part of CD 09/10/031 Introduction to some Beams Division jargon in some order…see how far we get:
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
Accumulator Stacktail Cooling Paul Derwent December 18, 2015.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
Fermilab Run 2 Accelerator Status and Upgrades
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
 A model of beam line built with G4Beamline (scripting tool for GEANT4)  Simulated performance downstream of the AC Dipole for core of beam using  x.
Anatomy of Accelerators Marty Peters Summer 2006.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
F Record luminosities at the Tevatron & Future potentiality Steve Werkema Fermi National Accelerator Laboratory Batavia, Illinois USA Asian Particle Accelerator.
F Possible Proton Capabilities at Fermilab Dave McGinnis April 16, 2007.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
F HCP 2007 Performance and Future of the Tevatron Ron Moore Fermilab - Tevatron Dept. Tevatron overview and performance Antiproton source + Recycler overview.
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
Pbar Production Status & Plans to get to 25mA/hr Keith Gollwitzer Antiproton Source August 31, 2006.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Overview of Project X ICD and RD&D Plans David Neuffer material from Paul Derwent & Sergei Nagaitsev (AAC Meeting, February 3, 2009)
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
ELENA RF Manipulations S. Hancock. Apart from debunching before and rebunching after cooling, the principal role of the rf is to decelerate the beam and.
8 GeV Linac (Project X) and mu2e Chuck Ankenbrandt Fermilab Mu2e Collaboration Meeting August 1, 2007 My Preferred title: Linac & Recycler & Accumulator.
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
Considerations on RF systems of SPPC collider and its injector chain
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
LHC (SSC) Byung Yunn CASA.
SLHC-PP kick-off meeting, CERN 9 April 2008
MEIC New Baseline: Luminosity Performance and Upgrade Path
MEIC New Baseline: Part 7
HE-JLEIC: Do We Have a Baseline?
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
JLEIC Ion Beam Formation options for 200 GeV
Presentation transcript:

The Tevatron Collider: A Thirty Year Campaign Fermilab Colloquium March 10, 2010 John Peoples 1

Fermilab

Prologue to Tevatron I June 1976 to February – 76 and 77 Woods Hole panels recommend PEP and ISABELLE for new construction. (The P5 of the day) – Magnet R&D for Energy Saver/Doubler was a distant 3 rd even though the Doubler team had learned how to build superconducting magnets for the Saver /Doubler. – Bob Wilson resigns, URA accepts his resignation in February and starts the search for a successor – Leon Lederman accepts URA’s offer to Fermilab’s 2 nd Director 3

Prologue to Tevatron I In early 1978 CERN approves the pbar-p colliding beams program in the SPS based on an all stochastic cooling pbar source. The ICE experiment provides the evidence that it can be done. The W and Z will be discovered at CERN in After September 1978: Leon – Makes peace in Washington and DOE – Organizes the Armistice Day Shootout of November 11, 1978 for Colliding Beams 4

The Outcome of the Armistice Day Shootout Fermilab Priorities for the future are set : – The completion of the Energy/Saver Doubler is the top priority. The Doubler Section led by Rich Orr and Helen Edwards reports to Leon. – The Colliding Beams Department in the Research Division is given the responsibility for building the Collider Detector Facility and defining the detector hall and assembly building parameters. – The responsibility for developing the technology and the design for an antiproton source is given to the Accelerator Division. – Colliding beams will be pbar-p in the Doubler. 5

The Tevatron I Project In mid 1979 Leon gets a phone call from Washington. “If Fermilab submits a proposal for colliding beams it is likely that it will be approved.” Fermilab submits a proposal for Tevatron I. Cost $41.5 million without R&D. It appears in the FY81 budget. A Tevatron I Section is set up under Don Young and Fred Mills to design and manage the project and it reports to Leon. 6

Tevatron I Design of June 1981 Pbar production: Main Ring delivers 13 Booster batches with 2.6x GeV protons to the R&D target station near F-25. Batches extracted one batch at a time separated by 0.1 sec intervals. Target: W-Rh target, Pbar Collection at 5.36 GeV/c, Li lens matches the pbar beam to the beam transport. Precooler (Booster length). Four steps of stochastic cooling and deceleration to 400 MeV kinetic energy followed by transfer to the E-cooler. Cycle time 10.5 s. E-cooler (200 m). Electron cooling at 400 MeV kinetic energy. Accumulate pbars and return to Precooler for acceleration to 8 GeV. Accumulation time 13 hrs. Peak collider luminosity estimated to be cm -2 s -1. 7

Director’s Review of TeV I Design in June 1981 The Committee: – The design appears to be adequate to meet the goals for Pbar production and accumulation listed in the design report. However those goals are too modest. – We recommend that the Laboratory re-examine the goals and develop a feasibility design commensurate with the full potential of the Main Ring-Booster combination to produce pbars. The Director (Leon): – Develop an alternate design which rests on the considerations of technical feasibility (& not cost). – Provide a progress report in 40 days. 8

Isabelle and TeV I 9

Tevatron I Complex ( ) 10

Tevatron I Design Parameters 11

TeV I Antiproton Source 12

Pbar Production I Booster batch of 2x GeV protons, 84 bunches, is accelerated to 120 GeV in the Main Ring. Before extraction the bunch time spread is minimized by adiabatic debunching followed by a 90 deg bunch rotation. Beam is delivered to the Pbar target station. Protons strike a slowly rotating 5 cm W-Rh target. The proton beam is focused to ~0.2 mm at the target. Number of protons is limited by the energy/cm -3 that can be deposited in the target in 1.6 µ s. 13

Pbar Collection Pbars are collected at 8.89 GeV/c. The transverse spot size and time spread of the pbar bunches that emerge from the target are the same as the proton bunches that hit the target. A 2cm dia, 15 cm long cylinder of Li just down stream of the target, matches the large angular divergence-small spot size beam into a standard beam transport. Current pulse is ~ 500 KA. ~ 5 x 10 7 pbars are transported to and injected into the Debuncher. Transverse emittances are 20 π mm-mr and the momentum spread is 3%. 14

Debuncher The ~84 bunches of Pbars are injected into stationary 53 MHz buckets and then undergo a bunch rotation followed by adiabatic debunching. The final momentum spread is reduced from 3% to 0.2%. The beam is stochastically cooled for one MR cycle time in both transverse planes (in Run II it is also cooled in momentum). The final transverse emittances are < 5 π mm- mr. The beam is transferred to the Accumulator and the next batch of pbars is delivered to the Debuncher for cooling and debunching. Cycle time is 2-3 s. A barrier bucket (h=2) creates a gap of ~ 200 ns in the pbar beam in the Debuncher so that it matches the Accumulator circumference. 15

Single batch stochastic cooling An approximate formula for transverse stochastic cooling of a single batch of particles is: ε -1 (dε/dt) = WN -1 (-2g + (M+U)g 2 ) g is the correction/ turn -2g cools and (M+U)g 2 heats ( noise) The cooling time is proportional to the number of particles (N), the mixing (M), the noise to signal ratio (U) and inversely proportional to the bandwidth (W) T = ε(dε/dt) -1 α N(M+U)/W The bandwidths of the Debuncher cooling systems are 2 GHz (2-4 GHZ) and typical initial cooling times are about 0.5 s. 16

Accumulator The pbars from the Debuncher are injected into the Accumulator and then kicked onto the injection orbit by a shuttered kicker in a region of high dispersion (9m). The beam is adiabatically captured by a 53 MHz RF system (h=84), the shutter opens, the beam is decelerated to the top of stack tail and the RF voltage is slowly turned off. The stack tail cooling system stochastically pushes the new beam in to the stack tail and towards the core cooling system. The cycle is repeated until there are enough pbars to send to the Tevatron via the Main Ring. 17

Injection, Stacking and Cooling in the Accumulator 18

Stack Tail Cooling System The stack tail pickups are placed in a region of high dispersion (9 m). A displacement of 10 mm radially inward corresponds to an energy decrease of 10 MeV. The kickers that push the beam towards to core are in a region of 0 dispersion. The gain of the stack tail pickups decreases with the radial distance from the pickups, which is proportional to energy. The overall system gain is designed to decrease exponentially with energy. Bandwidth 1 GHz (1-2 GHz) The beam is cooled slowly where dN/dE is large and quickly where dN/dE is small. An exponential increase in dN/dE will provide a constant flux of pbars into the core momentum cooling system. 19

Evolution of the stack tail and core with time 20

Run Statistics 21

Phase I Upgrade of the Fermilab Accelerator Complex The elements of the phase I upgrade for run I were: Matched low beta insertions for CDF (B0) and D0 Electrostatic separators create helical orbits and reduce the number of beam-crossings from 12 to 2 (CDF and D0) Linac energy upgrade from 200 MeV to 400 MeV Reliability improvements to the pbar target station Incremental improvements to stochastic cooling systems. Improvements to the controls and beam position monitors systems 22

200 MeV Drift Tube Tanks ready to come out 23

400 MeV Linac Upgrade in place 24

Longitudinal Emittance vs. Booster Bunch intensity 25

Transverse Emittance vs. Booster Bunch Intensity 26

Run I Performance Statistics 27

Elements of the Phase II Upgrade Main Injector replaces the Main Ring and does all of its functions much better Recycler provides a third stage cooling ring with both electron and stochastic cooling. A set of injection kickers to enable 36 bunch operation Bandwidths of all pbar source cooling systems doubled Raise the center of mass energy to 2 TeV. Significant improvements to the controls and beam position monitor systems to make transfers faster and more efficient (especially pbars). 28

Main Injector ground breaking 29

Phase II Upgrade for Run II 30

9/15/97

Main Injector Original Purposes – Increase the luminosity by 5 to 5x10 31 cm -2 s -1. – Move the engine of pbar production out of D0 and CDF. The Main Ring went right through D0. – Create the possibility of a 120 GeV fixed target program concurrent with Collider operation The basic concept was conceived during and was first presented at Snowmass First funding in FY1991, commissioned in June Steve Holmes was the Project Manager. 32

Main Injector Main Injector is a 150/120 GeV proton synchrotron with a circumference of 3.3 km. Its functions for colliding beams are: – Accepts 8 GeV protons from the Booster, accelerates them to 120 GeV and delivers them to the Pbar target station for pbar production and subsequent collection in the pbar source. Typically 8x10 12 /batch every 2.4 s. – Accepts 8 GeV pbars from the Recycler and 8 GeV protons from the Booster, accelerates them to 150 GeV as short 53 MHz bunch trains, coalesces them in to 4 bunches for pbars and 2 bunches for protons and then transfers them to the Tevatron. 33

Turning the Main Injector on 34

Transverse Emittance vs. Stack Size 35

Core Momentum Spread vs. Stack Size 36

Stacking Rate vs. Stack Size during Run I 37

Main Injector and Recycler 38

Recycler The Recycler is an 8 GeV storage ring for pbars. It is made mainly of permanent alternating gradient magnets. Pbars are transferred from the Accumulator after stacks of 25 x have been accumulated. The typical time between transfers is 1 hr. The accumulator stacking rate for these small stacks is x /hr. The pbars are cooled and stashed by a 100 mA cold relativistic electron beam (4.3 MeV). The stash size can be up to 500 x and the accumulation rate does not decline with stash size. Typically stashes are mined when the stash is > 400 x The formation of dense bunches in the Main Injector at 150 GeV and subsequent coalescing is very efficient. Typically the transfer efficiency from Recycler to the Tevatron at low β is > 80%. 39

Pbar Source and the Main Injector from Wilson Hall Booster to MI 8 GeV Line 40

Extraction fraction vs. Stack Size 41

Pbar extraction sequence from the Accumulator 1. Beam bunched in the core 2. Beam being pulled through stack tail section 3. Beam in the extraction region 42

STASHING PBARS1 Start Cycle Barrier Buckets on 43

STASHING PBARS2 2.5 MHz RF on and ready for transfer from Accumulator 44

STASHING PBARS3 Parcel Injected and 2.5 MHz RF off 45

STASHING PBARS4 Parcel swept to stash 46

STASHING PBARS5 Regrow Barrier Buckets 47

STASHING PBARS6 Start cycle again 48

Selection of the number of Bunches, B L is proportional to B if N p and N pbar are fixed The bunch spacing is determined by the selected sub-harmonic of the Tevatron 53 MHz RF system (h=3x7x53 = 1113). – h=53 provides a bunch spacing of 396 ns. It is being used in Run II to produce 3 groups of 12 bunches with 400 ns spacing for each beam. – The separation of the groups, about 2 µ s, is used for aborts, injection and cogging. – 36 bunches/beam is standard in Run II. 49

Collider Operation with the Main Injector and Recycler Each beam has 36 bunches and circulates on helical orbits separated by > 5 sigma except at B0 (CDF) and D0 where the beams collide N p is limited to < 30 x /bunch in order to keep the pbar beam-beam tune shift to <.025. When this is exceeded the initial luminosity lifetime decreases < 6 hr quickly 2.7 x protons/bunch are consistently delivered to low β with a bunch coalescing efficiency of 70%. The luminosity lifetime is typically 6 hr. N pbar is generally in the range of 7 to 9 x /bunch. The peak L is between 2.8 to 3.2 x cm -2 s -1 when a full stash of 400 x is available. The record peak L is 3.50 x cm -2 s

Tevatron Performance for Run Ib and Goals for Run II 51

Run II Peak Luminosity as of March 9,

Run II Integrated Luminosity as of March 9,

Epilogue The Tevatron Collider has worked extremely well for 25 years and is still working well. It has enabled CDF and D0 to discover the top quark and observe important features of the standard model for the first time. By the end of FY2011 it will have delivered about 12 fb -1 to both CDF and D0. I hope that there is at least one more important discovery in that data. Its success is a great tribute to the Fermilab staff, all five Directors and DOE. 54

Additional Slides 55

12/20/83

9/25/82

Stacking Sequence ( as beam fills the stacktail) Each trace shown here was taken at ~1 min intervals T= 0 T= 1 T= 2 T= 3 T= 4 T= 5

Old drift tube tanks coming out 63

RECOMMENDATIONS FROM THE JUNE 1976 PAC 64