CLAS12 CalCom Status Update CLAS Collaboration Meeting November 14, 2014.

Slides:



Advertisements
Similar presentations
Thomas Jefferson National Accelerator Facility Page 1 Internal Software Review Jefferson Lab November 6-7, 2014 Hall B:User Software Contributions Gerard.
Advertisements

GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 1 GLAST Large Area Telescope: EM1 Data Analysis and Calibration Summary Report Eduardo.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
1 G4MICE Analysis of KEK Test Beam Aron Fish Malcolm Ellis CM15 10th June 2006.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
CMS Alignment and Calibration Yuriy Pakhotin on behalf of CMS Collaboration.
CLAS12 CalCom Activity: a progress report V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 meeting, February 22 nd 2012.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
CLAS12 CalCom Activity CLAS Collaboration Meeting, March 6 th 2014.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
HPS Online Software Discussion Jeremy McCormick, SLAC Status and Plans.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Thomas Jefferson National Accelerator Facility Page 1 EC / PCAL ENERGY CALIBRATION Cole Smith UVA PCAL EC Outline Why 2 calorimeters? Requirements Using.
Thomas Jefferson National Accelerator Facility Page 1 12 GeV Software and Computing Review Jefferson Lab February 10-11, 2015 Hall B:User Experience and.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
The Commissioning of the CLAS12 Detector V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 workshop, June 21 st 2011.
JANA and Raw Data David Lawrence, JLab Oct. 5, 2012.
Detector Diagnostics Calibration Analysis Ped/LED/Laser RadDam Analysis Detector Optimization Lumi Detector Performance Monitoring DQM On/Offline Prompt.
A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
CMS pixel data quality monitoring Petra Merkel, Purdue University For the CMS Pixel DQM Group Vertex 2008, Sweden.
November 2013 Review Talks Morning Plenary Talk – CLAS12 Software Overview and Progress ( ) Current Status with Emphasis on Past Year’s Progress:
Detector Simulation Presentation # 3 Nafisa Tasneem CHEP,KNU  How to do HEP experiment  What is detector simulation?
Hall-D/GlueX Software Status 12 GeV Software Review III February 11[?], 2015 Mark Ito.
Latifa Elouadrhiri Jefferson Lab Hall B 12 GeV Upgrade Drift Chamber Review Jefferson Lab March 6- 8, 2007 CLAS12 Drift Chambers Simulation and Event Reconstruction.
Thomas Jefferson National Accelerator Facility Page Hall B:User Software Contributions Gerard Gilfoyle University of Richmond 12 GeV Upgrade Software Review.
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
Offline Status Report A. Antonelli Summary presentation for KLOE General Meeting Outline: Reprocessing status DST production Data Quality MC production.
1 Checks on SDD Data Piergiorgio Cerello, Francesco Prino, Melinda Siciliano.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Forward Carriage Commissioning CLAS Collaboration Meeting 6/19/2015CLAS12 CalCom Status Update1 ECAL PCAL FTOF Panel 1A FTOF Panel 1B Detector Status PMT.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
CLAS12 CalCom Activity: a progress report V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 meeting, June 14 th 2012.
2014 CalCom Activity Plan based on last year’s work and open discussion: Periodic meetings with detector groups to discuss algorithms, discuss software.
The MEG Offline Project General Architecture Offline Organization Responsibilities Milestones PSI 2/7/2004Corrado Gatto INFN.
Quality assurance for TPC. Quality assurance ● Process: ● Detect the problems ● Define, what is the problem ● What do we expect? ● Defined in the TDR.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
Level 1-2 Trigger Data Base development Current status and overview Myron Campbell, Alexei Varganov, Stephen Miller University of Michigan August 17, 2000.
Calibration algorithm and detector monitoring - TPC Marian Ivanov.
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
EC Software Suite 1 EcMon: Monitors raw, calibrated and reconstructed data in real-time with detector map navigation, strip- charts, histograms. Single-event,
Simulation and reconstruction of CLAS12 Electromagnetic Calorimeter in GSIM12 S. Stepanyan (JLAB), N. Dashyan (YerPhI) CLAS12 Detector workshop, February.
Thomas Jefferson National Accelerator Facility Page 1 CLAS12 Workshop Jefferson Lab February 23, 2016 Time-of-Flight Software Status Jerry Gilfoyle, Evgeny.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Custom Classes DetectorShapeView2D: Detector mouseover callbacks (default is mouse click). EventControl:
Feb C.Smith UVA EC energy calibration – g13 pass0 For pass0 data were cooked with CALDB calibration constants reset to nominal 10 channels / MeV.
Online Monitoring : Detector and Performance check
CMS High Level Trigger Configuration Management
CALGO: Software Tasks cal software:
CLAS12 DAQ, Trigger and Online Computing Requirements
CLAS12 First Experiment Workshop Summary
CLAS12 Commissioning with Cosmincs
CLAS12 software workshop
CLAS12 Calibration and Commissioning (CALCOM)
Stress tests for CLAS12 software
Commissioning of the ALICE HLT, TPC and PHOS systems
PCAL Cosmic Ray Tests Progress Report C. Smith μ U V W MODULE 2
Overview of CLAS12 Calibration
FORWARD CARRIAGE UPDATE – March-July 2015
CLAS12 First Experiment Workshop Report
Preparation of the CLAS12 First Experiment Status and Time-Line
CLAS12 Timing Calibration
Analyzing CLAS12 Data David Payette.
Presentation transcript:

CLAS12 CalCom Status Update CLAS Collaboration Meeting November 14, 2014

Outline Commissioning-with-beam plan: – new document and review Calibration tools development: – Calibration development guidelines – Development status – Timeline CLAS12 Software Review, 11/7/2014Calibration Software Development and Status2

CLAS12 Commissioning Plan CLAS12 Software Review, 11/7/2014Calibration Software Development and Status3 New version released in June 2014

CLAS12 Commissioning- with-beam Plan CLAS12 Software Review, 11/7/2014Calibration Software Development and Status4  Five phases: – Functionality test – Luminosity scans – Special runs for detector alignment – Energy and magnetic field scans – Detector calibration and performance studies  Timeline  Specific procedure for each CLAS12 sub-detectors  es/e/ee/Commissioning-with- beam_ pdf  New document presenting the commissioning-with-beam plan available

Commissioning Plan Review  Review of the commissioning-with-beam plan scheduled for January 15, 2015  Review panel: -Elton Smith – Hall D (chair) -Glenn Young - JLab -Lars Schmitt - PANDA -Stepan Stepanyan – Hall B  Review Charge: -Is the commissioning with beam plan for CLAS12 sufficiently developed in order to ensure that upon completion the detector system will be ready for production beam running? -Is the commissioning with beam plan timeline, both in terms of durations of each study and order of operations, reasonable and optimized? -Are that studies or tests that have not been specifically included in the commissioning with beam plan that should be added? -… CLAS12 Software Review, 11/7/2014Calibration Software Development and Status5

Calibration Development Guidelines Algorithms: – import existing algorithms developed for CLAS and adapt/evolve them to CLAS12 – develop new algorithms for new detectors Software: – develop software suites with the help/supervision of the software group – use common software tools for data I/O, CCDB I/O, GUIs, Geometry, histogramming – use developed suites as templates for other detector systems – shares suites among similar detectors systems (time of flight, Cerenkov counters, MicroMegas trackers) Test and Validation: – test software on old CLAS data, new commissioning data (pulser, cosmic, …) or simulations – compare new software with old CLAS software results CLAS12 Software Review, 11/7/2014Calibration Software Development and Status6

Development Status  EC-PCAL: update of existing CLAS algorithms to include new PCAL detector using CLAS legacy code adapted for online running  FTOF: new calibration suite under development based on existing CLAS algorithms being tested on commissioning data and old CLAS data and validated against legacy code  DC: new calibration suite will be developed based on CLAS algorithms and software; work planned for 2015  HTCC-LTCC: development of joint calibration suite based on CLAS Cerenkov tools  FT:algorithms under development, FT-Cal cosmic ray calibration tool being developed using software common tools  SVT: new calibration suite under development based on expert’s input and being used for detector commissioning  MM:algorithms based on detector group experience with similar detector; software implementation in 2015  CTOF: will be integrated with FTOF in a “time-of-flight” calibration suite  CND: algorithms in place; will be integrated together with FTOF and CTOF in a “time-of-flight” calibration suite CLAS12 Software Review, 11/7/2014Calibration Software Development and Status7

EC-PCAL Energy Calibrations CLAS12 Software Review, 11/7/2014Calibration Software Development and Status8 MIP Calibration ONLINE Cosmic muons Dalitz / multiplicity software filter Complete calibration in hours OFFLINE Physics data (pions p > 0.5 GeV/c) Monitor PMT gains using E/p Use to cross-check muon calibration Trigger Requirements Energy / cluster reconstruction in frontend trigger for e- Uniform spatial trigger response for well defined e- energy threshold Calibration Requirements Determination of PMT gain, pedestal and attenuation constants EC/PCAL relative geometry for precise energy cluster matching Software Requirements Data filtering necessary to isolate suitable events for calibration (pixel cuts) Interface to calib. / geom. databases and hardware controls (HV, thresholds, trigger firmware) Monitoring of time drift of calibration constants and correlation with luminosity Diagnostic output (histograms, 2D plots, single event displays, strip-charts)

EC-PCAL Calibration Status CLAS12 Software Review, 11/7/2014Calibration Software Development and Status9  Level 3 data servers run in each front-end ROC / sector. Used to pre-filter raw data for more efficient analysis.  Legacy calibration kumacs used since Most Fortran code has been moved to Level 3 C code. guipcal.cc fcsed. c fcSED.kumac  Standalone utility programs and scripts used to identify elements of detector operation that can affect calibration: occupancy, mis-cabling, noisy channels, geometrical alignment.  Global plots show overall response of detector: timing, pulse-shape, pulse- height, spatial distribution of light response.

EC-PCAL Calibration Performance Gain matching and attenuation corrections crucial to trigger functionality and performance of calorimeters. For CLAS12, matching of EC and PCAL energy response demands consistency of approach. Algorithms tuned from nearly 20 years experience with EC. CLAS12 Software Review, 11/7/2014Calibration Software Development and Status10

EC-PCAL Calibration Future CLAS12 Software Review, 11/7/2014Calibration Software Development and Status11 CLAS 12 Online Calibration Histogram Service Calibration Service HV Service CALDB Service Online Monitor Service Archive Service Archive Service PCAL FTOF CTOF EC LTCC HTCC ET Service Data Filter Event Builder Service Cosmic triggers Physics triggers Migration from expert scripts to user-friendly GUIs will evolve as online DAQ framework is defined (CLARA / JAVA or C/C++) -GUIs derived from FTOF, SVT, or CED -JAVA services not currently used in Hall B online monitoring - this may change Work to validate EC+PCAL joint calibration will continue -Effect of dead spaces between modules and different photoelectron yields on resolution -Cosmic muon simulated response

Cerenkov Calibration CLAS12 Software Review, 11/7/2014Calibration Software Development and Status12 CLAS Calibrations:  HV Matching  Pedestals  SPE calibration  CALDB I/O  ROOT Output CLAS12 Calibrations  HTCC and LTCC  HV Matching  SPE analysis  CCDB I/O  CAEN SY4527 HV I/O  ROOT Output Status GUI started Can talk with CCDB Working on CAEN I/O Starting actual FADC acquisition, HTCC and LTCC calibrations

FT Calibration FT-Cal cosmic ray calibration What: first step of FT-Cal calibration and commissioning Why: determine charge-to- energy conversion factors and initial energy calibration of the 332 PbWO crystals When: after completion of the FT-Cal assembly in Spring 2015 Now: develop software tool and test in simulated data CLAS12 Software Review, 11/7/2014Calibration Software Development and Status13 GEMC visualization of a muon going through the calorimeter

FT Calibration Use EVIO-Root interface to read evio banks from simulated event file Select events with muons crossing a “column” of crystals to reduce angular spread For each crystal build ADC spectrum Fit with Landau + Exponential function to determine the MIPs peak position Build text file for loading into CCDB CLAS12 Software Review, 11/7/2014Calibration Software Development and Status14 Top-Right quadrant of FT PbWO calorimeter X Y

Calibration Development Timeline CLAS12 Software Review, 11/7/2014Calibration Software Development and Status15 Algorithm SoftwareTest

Summary CLAS12 calibration software is being developed under the supervision of the CalCom and Software groups Software development is based on: – Exploitation of pre-existing algorithms – Optimization of resources by calibration suite sharing – Use of common software tools – Test using CLAS, simulation, and commissioning data with comparison to old CLAS calibration results Software development was started in 2014 and is planned to be completed within 2015 – Improve standardization of calibration suites, for better exploitation of resources and simpler use – Develop detailed documentation for suite maintenance and usage – Define benchmark data set to exercise calibration suites and develop tutorials to train users – Define quality controls on calibration results CLAS12 Software Review, 11/7/2014Calibration Software Development and Status16