D RAFT S TANDARD P ROTOCOLS February 1, 2011 Regional Technical Forum Presented by: Michael Baker.

Slides:



Advertisements
Similar presentations
OMKAR Solutions Inc. EMM – Error Message Manager Version 1.0.
Advertisements

Roadmap for Sourcing Decision Review Board (DRB)
Project Proposal: Multifamily Weatherization UES Scoping Study Regional Technical Forum June 1 st, 2011.
UPDATE ON GROCERSMART 4.0 RESEARCH PLAN Regional Technical Forum May 3, 2011.
New Construction Calibration Research Results and Request for Decision Regional Technical Forum March 18, 2014.
D EEMED M EASURE R EVIEW P ROJECT Final Report December 7, 2010 Regional Technical Forum Presented by: Michael Baker.
The Saga Continues: Measure Interactions for Residential HVAC and Wx measures Regional Technical Forum April 23, 2014.
Review Tabled Agenda Item: Additional M&V Data on Ag Pump VFD Projects Determination of M&V requirements and/or deemed savings Regional Technical Forum.
RTF 2012 Workplan Statements of Work January,
Industrial Pump Motor VFDs: Provisional Standard Protocol Christian Douglass Regional Technical Forum 5/12/2015.
Fan VFD Calculator Development Staff Request for Authorization of Funding from the Regional Technical Forum 28 June 2011.
INDUSTRIAL, AGRICULTURAL AND LARGE COMMERCIAL (IALC) ROADMAP CUSTOM IMPACT EVALUATION WEBINAR TO PRESENT RESEARCH PLAN Presentation July 28, 2014.
CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) November 2013.
Project Risk Management. The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
Post 2012 Energy Efficiency Planning Schedule: Options and Implications February 16, am - 5 pm CPUC Auditorium.
Spreadsheet tool for the Small Air Compressor Market Presented by: Paul Warila – Cascade Energy Tom Osborn - BPA.
Agenda Teams Responsibilities Timeline Homework and next steps.
Residential Weatherization and Ventilation Subcommittee: Infiltration Impact Research Plan Presentation to the Regional Technical Forum February 14, 2012.
Guidelines for the Development and Maintenance of RTF- Approved Measure Savings Estimates December 7, 2010 Regional Technical Forum Presented by: Michael.
Overview of the Regional Technical Forum Guidelines January 22, 2013.
RTF 2015 Mid-Year Progress Report and 2016 Work Plan Jennifer Anziano Regional Technical Forum July 21, 2015.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
Refrigerator Decommissioning: Measure Status Update Regional Technical Forum October 16, 2013.
RTF Staff, Subcommittee and Work Updates November 1, 2011.
By Matt Baker Eric Sprauve Stephen Cauterucio. The Problem Advisors create a sign-up sheet to be posted on the door of their office. These sign-up sheets.
RTU Measure Preparation for Review as Standard Protocol Staff Request for Authorization of RFP Funding from the Regional Technical Forum 28 June 2011.
RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015.
RTF Custom Protocols: Background, Issues and Critical Elements February 8, 2012 Regional Technical Forum Subcommittee on Impact Evaluation and Custom Protocol.
Schools Lighting Hours of Use Data Regional Technical Forum May 13, 2014.
2011 RTF Projects RTF Input on SOW Outlines: - Deemed Measure Reviews - Measure Life Guidelines -Measure Cost Guidelines Regional Technical Forum April.
Standard Protocol Development for Advanced RTU Control Retrofit August 15, 2013 Presentation to: Regional Technical Forum RTUG Subcommittee Sponsored by:
Integration Issues for RTF Guidelines: Savings, Lifetimes and Cost/Benefit October 24, 2012 Regional Technical Forum Presented by: Michael Baker, SBW.
RTF Staff, Subcommittee and Work Updates October 4, 2011.
Northwest Power and Conservation Council New Commercial Building Program Quest Presentation, Discussion and Decision of Proposed Approach to Estimating.
Regional Technical Forum Automated Conservation Voltage Reduction Protocol.
Proposal to Allocate Remaining 2010 Funding RTF November 2, 2010.
RTF Management Update Jennifer Anziano Regional Technical Forum February 18, 2015.
Proposed Rooftop HVAC Standardized Field Measurement Protocol and Annual Savings Calculator RTUG REVIEW January 31, 2012.
Project Risk Management Planning Stage
CRAC March 4, Windows Update Regional Technical Forum March 4, 2003.
RTF Small Saver Review Process Proposal June 19, 2012.
Comparison of CA Evaluation Protocols, CA Framework, IPMVP and CPUC Policy Manual* A preface to group discussion *In terms of how they define.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Presented by: Todd Amundson, BPA Jane Peters, research into action Ryan Fedie, BPA Update.
Unit Syllabus Definition Importance Types of Feasibility study Technical Operational Resource Legal/Ethical Economical.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Information-Technology RTF Sub-Committee July 2, 2013 Mira Vowles, P.E., CEM Emerging.
BPA Impact Evaluation Policies QSSI. 2 Drivers: Industry Best practice, Power Act, RTF Guidelines, confidence savings.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Developed by Navigant Research Team Final: 11/22/15 Agricultural Programs’ Logic Model.
RTF Staff, Subcommittee and Work Updates June 19, 2012.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Information-Technology RTF Sub-Committee May 7, 2013 Mira Vowles, P.E., CEM Emerging.
Structure and Integration of RTF Guidelines: Savings, Lifetimes and Cost/Benefit July 17, 2012 Regional Technical Forum Presented by: Michael Baker, SBW.
RTF Delivery Verification Guidance Batch 2 Jennifer Anziano Regional Technical Forum September 22, 2015.
How The Regional Technical Forum Supports PNW Energy Efficiency Programs January 5, 2010.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump Sub-Committee Road-Mapping Session BPA Energy Efficiency.
Research and Evaluation Subcommitee – 2014 Plans Regional Technical Forum January 22, 2014.
Guidelines Overview Michael Baker January 20, 2016.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N What’s New with the BPA Commercial & Industrial Lighting Program? …. Lots! John Wilson Non-Residential.
G UIDELINE R EVISIONS – R ELEASE February 1, 2011 Regional Technical Forum Presented by: Michael Baker.
RTF Staff, Subcommittee and Work Updates February 14, 2012 IRTF.
RTF Management Updates Jennifer Light Regional Technical Forum February 17, 2016.
Northwest Power and Conservation Council Perspective Program for Commercial New Construction CNC Small Office RTF July 2007.
UES MEASURE REVIEW PROJECT Final Report March 14, 2012 Regional Technical Forum Presented by: Jeff Romberger.
Agenda Leads work – Track Status Admin / Upcoming / Next Steps – RFP Document review – Vendor Question Review – GL Preparation – Orals – Harris.
A Calculator for Reliably Measuring the Savings from Advanced RTU Control Retrofits August 27, 2015 Presentation to: RTF Commercial Rooftop Unit Working.
1 RTUG Project Management Contract Expansion And RTF 2010 Work Plan Budget Adjustments RTF March 2, 2010.
Writing and Submitting Student Learning Objectives
Operations an exploration of basic manufacturing operations, forecasting, budgeting and control.
EMREX – Risk Matrix v1 - draft
Background for Lab 5.
Presentation transcript:

D RAFT S TANDARD P ROTOCOLS February 1, 2011 Regional Technical Forum Presented by: Michael Baker

Development of Draft Protocols Measure Selection  Master measure list developed and grouped into deemed, standard and custom  Ranked standard based on availability of calculators, likelihood of method consensus, number of utility requests and sub-committee rating  Work started on RTU but then put aside as redundant to other research  Selected and prioritized seven measures (see Summary spreadsheet) and decided to proceed first with Fan VFD 2/1/2010

Regional and National Search Found other protocols/calculators but..  Not sufficiently specific and prescriptive  Intended to support audits/design not M&V  Measurements not viewed as cost-effective Protracted search for best practice data sets  Found two useful to fan VFD protocol  Received many others, but none had sufficient pre and post measurement to act as a gold standard. 2/1/2010

Fan Protocol and Template Built calculator that could estimate savings by a number of different method. Used it to explore impact of various simplifications. Simplifications did not work well for pre/post test case, but it seemed an atypical case. Developed template based on our best judgment on appropriate simplifications for Fan VFD 2/1/2010

Development of Protocols for Other Measures Continued search for best practice data but this was ultimately put on hold due to budget and schedule  Not common in impact evaluations  For programs, often in the hands of vendors if available at all. Many programs minimize measurements to control costs. Proceeded to apply template to other six, based on our team’s best judgment for each measure. 2/1/2010

Seven Draft Protocols See Standard Protocol Summary.xlsx 2/1/2010

Calculator Issues Handling Trend Log Data. Do we leave a lot of the data preparation burden on the users? ProCost needs an 8,760 version. May be some larger issues related to using ProCost in a number of different environments Heat/Cool Interaction Factors needed for Lighting Protocol, but also needed for many other commercial measures deemed and standard. 2/1/2010