TL250-Internet Communicator
Compatibility
Specifications VDC current draw 12 VDC input voltage Size: 3.25” × 5.25” (8.3 × 13.3)cm Operating Temperature: 32°- 122°F (0°-49°C) Output Protocols: UDP/IP 10/100 BaseT half duplex Input Protocols: PC-Link (SIA format) Connectors: 4-pin header for the PC-Link and RJ-45 for Ethernet Network: Ethernet LAN/WAN 10 BaseT, 10/100 BaseT or 100 BaseT Downloading Support for PC4020 V3.3+/PC5020/PC1616/PC1832/PC1864 Control Panel: using DLS2002 and/or DLS2002 System Administrator software 4 digital inputs (can be increased to 12 using the PC5108) Capable of sending alarm messages to 2 addresses
Board Overview PC Link Header to Panel Network Connection LED1 = Speed Status (ON = 100Mbps Connection OFF = 10Mbps Connection) LED2 = Activity Status (Displays Network Traffic RX/TX ) LED3 = Link Status (ON = Ethernet Present OFF = Ethernet Absent) Zone 1 - 4Keybus to PC VDC and GND
Status LED Flashes Per sec. TL250 Status 1/3 Flash-Normal 1 Flash -Network Absent 2 Flash -Invalid Account 3 Flash -Receiver 1 Absent 4 Flash -Panel Absent 5 Flash -Inputs Alarms 6 Flash -FTC 1 7 Flash -PC5108 Absent 8 Flash -PC5108 Tamper 9 Flash -FTC 2 10 Flash -Key switch Arm 11 Flash -Remote Programming 12 Flash -Local Programming 13 Flash -Receiver #2 Absent
Connecting to the panel 12VDC and GND Connect Network Cable Connect PC-Link Cable
Programming Requirements Static IP Address Programming IP address of TL250 IP address of Subnet Mask IP address of DRL3IP IP address of Network Gate Account Number Dynamic IP Address Programming IP address of DRL3IP Account Number Example IP Address
Programming (4020) Press [*] to select System Area Select (00) <> Installer Opt’s Select (04) <> Communicator Scroll over to Comms Toggles and press [*] Select Toggle <> T-Link Enable Y Scroll over to Communicator and press [*] Scroll until you see an option for the T-Link and press [*] to enable the option Select (00) <> System Area Select (01) <> Comms Toggles Enter installer programming by pressing *8 followed by your installers code
Programming continued… Press [#] to Exit Comms Toggles Select (01) <> Comms Toggles Select (06) <> T-Link Module Enter a 3 digit Section number followed by the entry Scroll over to T-Link Module and press [*] Select Entry # Ent _
Select Entry # Ent Enter IP Address Select Entry # Ent Select Entry #1 Enter 00-FF 00 Select Entry # Ent Enter IP Address Select Entry # Ent Enter IP Address Enter the 12 digit IP Address of the TL250 followed by [#]. This should be given to you by your IT department. ENTER ALL ZERO’S FOR DHCP. Enter the 12 digit Subnet Mask followed by [#]. This should be given to you by your IT department. DO NOT PROGRAM FOR DHCP Enter the 6 digit account number for the TL250 followed by [#] of the TL250. This should be given to you by your central station. If you account is only 4 digits, enter then the 4 digit account number Enter the 12 digit IP Address of the DRL3IP followed by [#]. This should be given to you by your central station. Select Entry # Ent Enter IP Address Enter the 12 digit IP Address of the Gateway followed by [#]. This should be given to you by your IT department. DO NOT PROGRAM FOR DHCP Programming continued…
Select Entry # Ent Enter Hex Data Enter the FIRST 16 hexadecimal digits of the Encryption key. This is provided to you by your central station. Select Entry # Ent Enter Hex Data Enter the LAST 16 hexadecimal digits of the Encryption key. This is provided to you by your central station. Select Entry # Ent Enter Hex Data 00 Enter [01] to enable Supervision for Network Supervision. DO NOT PROGRAM FOR UN- SUPERVISED ACCOUNTS Select Entry #1 Enter 00-FF 99 Enter [999] to default the TL250 Enter [55], wait 30 seconds then press [#] all the way out of programming. Select Entry # Ent Optional - If Network Supervision is Required… Optional - If 128 AES Encryption is Required… Programming continued…
4020 Panel Programming Ref# Panel Tel number = CAAA Ref# XX01 Comms Format = SIA FSK Ref# Auto SIA = Y Ref# XX02 Dialer Directions = Alarms Y etc… Ref# DLS Enabled* = Y *if downloading is required
Programming Power Series TL250 Programming: Section 382 opt 5 PC-Link Active= enabled All TL250 programming in section [851] [001] –TL250 IP address, [002] –Subnet Mask, [003] -6 digit account number, [007] –DRL3IP IP address, [008] –Gateway [999], enter a 55 to restart (00 to default)
Power Series Communication Programming: Section 301 Panel Tel number = DCAA Section 350 Comms Format = SIA FSK Section 381 opt 3 Auto SIA = enabled Section 401 opt 1 DLS Enabled* = enabled *if downloading is required Programming Power Series
DLS 2002 Software DLS2002 Programming a panel via TL250 Ensure the DLS2002 TL250 Driver is installed (DLS2002 T-Link II Driver.exe)
Select TCP IP then click OK Programing the panel Via DLS2002 and TL250: Change Modem to TCP/IP DLS 2002 Software
IP address of TL250 DLS2002 Programming a panel via TL250 Enter the TL250’s IP address when an account is created or edited under account properties
DLS2002 Programming a panel via TL250 Upload/download control panel as usual
Questions?
Thank you for your time For future assistance, feel free to contact me at