Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee March 27, 2013 Mira Vowles, P.E., CEM Emerging.

Slides:



Advertisements
Similar presentations
Trane Voyager™ rooftop units
Advertisements

HEALTHCARE BUILDING AUTOMATION
Controller Programming
Heating, Ventilating, and Air-Conditioning
Portable Classroom Controls Project Chuck Collins RCM Meeting April 27, 2007.
Foundations of Real Estate Management TM BOMA International ® Module 3: Building Operations I Heating, Ventilating, and Cooling the Building.
1 LIGHTING. 2 LIGHTING 30% better-than-code is incredibly easy for lighting – the standards are lagging the industry revolution.
KE2 Evaporator Efficiency
Components of HVAC System
Partnership Gwinnett + Southeast Green Series- Debunking Energy Efficiency Myths: Why your bottom line depends on Energy Efficiency Property of VIS VIVA.
The Value of DOD Installation Energy Management Control Systems (EMCS) and Command Centers for Improved Operations and Increased Energy Efficiency Moderator:
Emerging Technology Field Test 1 February 5, 2015 Brown Bag Mira Vowles, BPA Wesley Saway, BPA.
T OPPORTUNITIES FOR ENERGY EFFICIENCY AT TRIBAL GAMING FACILITIES.
Ductless Heat Pumps in Residential Applications Proposed Research Plan.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee September 28, 2011 Mira Vowles, P.E., CEM.
C oncerns Ltd ool Energy Efficient Refrigeration Jane Gartshore, Cool Concerns Ltd.
ASHRAE Presentation: VRF Overview Mitsubishi Electric Presenter: Phone number ©2011 Mitsubishi Electric& Electronics USA, Inc.
RETScreen® Energy Efficiency Projects
VRF for the Seventh Plan Preliminary Approach and Data for a Variable Refrigerant Flow Measure for the Seventh Plan Regional Technical Forum January 21,
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
Industrial Pump Motor VFDs: Provisional Standard Protocol Christian Douglass Regional Technical Forum 5/12/2015.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
1 Proposed Changes to the RTF’s Heat Pump Specifications Impact on Estimated Deemed Savings and C&R Discount Program Credits.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee April 25, 2012 Mira Vowles, P.E., CEM Emerging.
Premium Rooftop Unit (RTU) Retrofit Overview August 20, 2012 RTF RTU Working Group Mira Vowles, BPA 1.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Emerging Technology Update Presented To Conservation Resources Advisory Committee June 4, 2014.
An intelligent VAV zoning system
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee November 16, 2011 Mira Vowles, P.E., CEM.
EvergreenEcon.com Heat Pump Water Heater Model Validation, Market Progress Assessment, and Process Evaluation RTF HPWH Sub-Committee Meeting October 15,
Perfect solution for large building
Prioritization of VC HP Measures Variable Capacity Heat Pump Measure RTF Sub-Committee June 22, 2011 meeting.
Air conditioning – Refreshes your life Mini-Chiller Applied Systems Sales1 EWA(Y)Q-AAV3P Residential Mini-Chiller Heating EWAQ - AA3VP EWYQ - AAV3P Cooling.
Hawke’s Bay Refrigeration
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
Phoenix Convention Center Phoenix, Arizona Targeted E4 Re-Tuning at GSA Facilities Integrated Energy Low/No Cost Solutions through Building Automation.
Regional Technical Forum October 9, ECMs for Compressor Head Cooling Fans  Measure –Retrofit of compressor head cooling fans on low temperature.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum June 16 th, 2015 Mohit Singh-Chhabra.
N O R T H A M E R I C A C O M M E R C I A L TDP
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee February 22, 2012 Mira Vowles, P.E., CEM.
Variable Capacity Heat Pump RTF Sub-Committee
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee June 12, 2014 Mira Vowles, P.E., CEM Emerging.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee February 27, 2013 Mira Vowles, P.E., CEM.
Applied Systems News FWEC*A Rudolf BARET HEISSIG.
Retrocommissioning Program UBS 677 Washington Blvd, Stamford, CT.
GrocerSmart™ 4.0 RTF Approval of Software and Adherence to RTF Guidelines April 5, 2011.
Standard Protocol Development for Advanced RTU Control Retrofit August 15, 2013 Presentation to: Regional Technical Forum RTUG Subcommittee Sponsored by:
Northwest Power and Conservation Council New Commercial Building Program Quest Presentation, Discussion and Decision of Proposed Approach to Estimating.
Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump Sub-Committee Alternative Incentive Approaches BPA Energy.
Using Technology to Manage Energy Bob Schoch-Director of Business Administration Tom Schneider-Supervisor of Operations.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee August 28, 2013 Mira Vowles, P.E., CEM.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee September 25, 2013 Mira Vowles, P.E., CEM.
Roof Top Unit Overview (MAGNUM) Visit us at Revision- 12/17/2015.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee July 24, 2013 Mira Vowles, P.E., CEM Emerging.
Introduction to Energy Management. Week/Lesson 12 Advanced Technology for Effective Facility Control.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Information-Technology RTF Sub-Committee July 2, 2013 Mira Vowles, P.E., CEM Emerging.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Information-Technology RTF Sub-Committee May 7, 2013 Mira Vowles, P.E., CEM Emerging.
Kansas City International Airport Michael Glasker, P.E. George Butler Associates, Inc.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump Sub-Committee Road-Mapping Session BPA Energy Efficiency.
VRF Applications in PNW RTF RTUG Meeting October 26, 2011 Kevin Campbell Reid Hart, PE Technical Research Group.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Performance Tested HVAC Presentation to the RTF January 5, 2010.
Seventh Plan Update RETAC September 23, Final Plan Update Review of Past Program Results Emerging Tech & New Measures Finance, Admin Cost, Line.
GrocerSmart™ 4.0 RTF Approval of Software and Adherence to RTF Guidelines April 5, 2011.
Product/Service Area : HEATING, VENTILATION, AND AIR CONDITIONING VCHP Energy Efficiency Measure Development Roadmap Barriers Action Items Resources TI.
Action Plan for Variable Capacity Heat Pump Technology
. Level 3 Air Conditioning Inspections for Buildings
Lecture Objectives: Answer questions related to HW 4
Chilled Beam Performance:
Maximizing the Use of Ductless Mini-Splits in Existing Homes
Presentation transcript:

Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee March 27, 2013 Mira Vowles, P.E., CEM Emerging Technology Project Manager BPA Energy Efficiency

Slide 2 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Meeting Topics 1.VC HP Overview (Mira) 2.School VRF System Case Study (Mira) 3.School VRF System Best Practices (Mira) 4.Mitsubishi VRF Integration & Training Resources (Mike) Plus if time allows: Other VRF research projects (all) Topic suggestions for future meetings (all)

Slide 3 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pumps (VC HP = VRF + DHP) + Ductless Heat Pumps Variable Refrigerant Flow Heat Pump System

Slide 4 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Refrigerant Flow (VRF) Systems VRF systems, either heat-pump or heat-recovery models, provide heating and air-conditioning, with: 1.Inverter driven outdoor-unit compressors and condenser fans, providing improved part-load and low-ambient performance, 2.Multiple indoor-units with multi-speed fans, electronic expansion valves and integrated thermostats, 3. Refrigerant piping network for heat transfer, 4.Integrated control system, and 5.Ventilation provided by VRF system, natural ventilation or a dedicated outside air system (DOAS).

Slide 5 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N VC HP Sub-Committee 1.Sub-Committee of the Regional Technical Forum (RTF) 2.Purpose: develop and recommend VC HP measures with a)high consensus methodology to estimate and verify electrical savings b)specification for cost effective installations that ensures persistent savings 3.Minutes and presentations are posted at:

Slide 6 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N School VRF System Case Study Baseline: unit heaters with electric heat and no cooling VRF & DOAS systems installed in 2010 Electricity savings 20% estimated 9% actual

Slide 7 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N School VRF System Findings No setback temperatures programmed No holiday schedules programmed No system integration No ventilation system heat-recovery Insufficient staff training No remote service software, central control or alarms programmed

Slide 8 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N School VRF System Best Practices 1.System design and integration 2.How simple is the user interface? 3.Commissioning and training 4.System operation

Slide 9 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N System Design and Integration 1)Are VRF and ventilation systems integrated with other systems? 1)What needs to be centrally controlled (on/off, optimal start, holidays, etc.)? 2)What needs to be centrally monitored (space temperatures, SAT, CO2, etc.)? 2)Is the system cost effective on a life-cycle basis? 1)Is a VRF-HR system cost effective? 3)Is the ventilation system design optimized? 1)Were heat recovery, demand controlled ventilation and economizer considered? 2)Will operation only be during occupied periods?

Slide 10 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N How simple is the user interface? a)Is dedicated staff, ongoing training or a service contract needed? b)How will zones and setpoints be programmed? 1)How will indoor-unit fans operate –auto or continuously on? 2)How will indoor-units operate during defrost, when heat is needed and system is in cooling or when combination ratio is exceeded? c)Are setback temperatures, holidays, optimal start and alarms programmed through the BAS? 1)If programmed through the VRF system, how many holidays can be programmed and how far in advance? d)Does the VRF system clock change automatically for daylight savings?

Slide 11 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Commissioning and Training a)Who will commission the integrated system? b)Who will train on the integrated system? c)What school staff will be involved during commissioning? d)Are critical points alarmed, monitored and trended? e)Is the remote service software installed and up-to-date? f)Are service contracts well understood, including who to call and what is included?

Slide 12 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N System Operation a)Ensure adequate training and have a plan to document changes and to train new personnel. b)Ensure there is a plan to monitor energy use, and to regularly check system operation. c)Ensure there is a plan to back-up the system regularly.

Slide 13 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Mitsubishi VRF Integration & Training Resources 1.What’s needed for BAS scheduling of VRF systems? a)What hardware is needed? b)What programming is needed and how is it backed-up? c)What is a range of costs for integration? d)Who typically commissions the integrated system? e)Give examples of good integrated systems in the PNW. f)How can on-site staff stay current with new software, refresh training and back-up their system? g)Without BAS scheduling, how are holidays programmed, how many unique dates can be programmed and how far in advance? 2.Describe regional training resources (what kind of training, where, when and at what cost).

Slide 14 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Mike Cundiff Regional Commercial Manager Mitsubishi VRF Integration & Training Resources

Slide 15 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Next Meeting: 4/24/13 at 10 am

Slide 16 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Daikin VRF Integration & Training Resources 1.What’s needed for BAS scheduling of VRF systems? a)What hardware is needed? b)What programming is needed and how is it backed-up? c)What is a range of costs for integration? d)Who typically commissions the integrated system? e)Give examples of good integrated systems in the PNW. f)How can on-site staff stay current with new software, refresh training and back-up their system? g)Without BAS scheduling, how are holidays programmed, how many unique dates can be programmed and how far in advance? 2.Describe regional training resources (what kind of training, where, when and at what cost).