Intermediate Band Materials and Solar Cells for Photovoltaics with High Efficiency and Reduced Cost Kick-off meeting, Madrid 7th February 2007 IBPOWER.

Slides:



Advertisements
Similar presentations
Project reporting in FP6 Guidance notes for Integrated Projects, Networks of Excellence, Specific Targeted Research Projects, Coordination Actions.
Advertisements

Additional information on project management
1 Emerging communities for collective innovation: ICT Operational tool and supporting methodologies for SME Associations 2010 January,
European Commission DG for Fisheries and Maritime Affairs Research & scientific analysis SSP Kick-off meeting The 6 th Framework Programme
Key issues in project reporting Jakub Rutkowski Project Annual meeting , Hannover.
Contracts & Finances Marit Hogendoorn Metten Somers.
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
Not legally binding FP7 Rules for Participation and Grant agreement FP7 Helpdesk 
INGAS General Assembly, Oulu, 25&26 May 2011 INGAS INtegrated GAS Powertrain 1 INGAS 30 months meeting Oulu, 25&26 of May 2011 General Assembly Coordinator.
Training & research for academic newcomers A project of the King Baudouin Foundation © 2013 Gabriella Calderari1.
GENIUS T4 - September 2014 GENIUS T4 Teleconference X. Luri.
EE 235 Presentation 1 Brian Lambson. Single bandgap SC Limiting efficiency 40.7% (Shockley-Queisser model) Intermediate band SC Limiting Efficiency 63.1%
Madrid, 7 th February 2008 Confidential 1 IBPOWER kick-off Meeting “Growth and Fabrication of Intermediate Band Solar Cells designed for concentration”
FINANCIAL REPORTING Rules and Regulations
ACCEPT project Grant Agreement FP7-SSH-2009-A.
Slide 1 PERFORMANCE 2 nd General Assembly, Aix Les Bains, 17 January 2008 IBPOWER Kick-off Meeting, IES-UPM Madrid, 7 February 2008 David Anderson DG Research.
Development of an Operational Plan for Environmental Protection from Industrial Dusts in Russia and other NIS (ENPRODUS) Managerial Issues.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 JERICO PROJECT The contract management Overview By Dominique Guéguen / Ifremer.
TUTORIAL Grant Preparation & Project Management. Grant preparation What are the procedures during the grant preparations?  The coordinator - on behalf.
STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 WP 7 Scientific coordination First phase (M1-M6) QIUPING CHEN POLITECNICO DI TORINO STABLE.
Research Infrastructures Seminar for I3 and CA Project Co-ordinators 12 November 2004, 1 Management and Implementation of I3 and CA Contracts Seminar for.
Reporting requirements (2)
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
APRE Agency for the Promotion of European Research Lifecycle of an FP 7 project Caterina Buonocore Riga, 13th September, 2007.
NOV-3733-SL-9715 Carbones KOM - May 10-11, 2010 – Toulouse, France 1 KICK-OFF MEETING May 10-11, 2010.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
General Assembly 2 - JERICO - 1 Patrick Farcy I Ifremer I Financial Management WP11 Jerico GA I Oslo I Norway.
Reporting during the lifetime of the project Moldova – Research Horizon 30 January 2013 Kristin Kraav.
FLAVIUS kick-off meeting Paris Information Society and Media DG Unit E1 Language Technologies, Machine Translation Luxembourg FLAVIUS Kick-Off.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
EPOCA – 11. June EPOCAConsortiumOrganisation.
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
Supported by the European Commission, grant agreement pending EUROSUPPORT V “Improving sexual and reproductive health of PLWH” Kick-off meeting, May 6-7,
SeaDataNet Pan-European infrastructure for Ocean & Marine Data management An Integrated research Infrastructure Initiative (I3) Kick-off Meeting June 8-10.
Volvox Finance 2 How we will manage the Finance Angela Pettit – Contracts Officer.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Work Package 4 Practicalities Kick-off meeting Judith Freita Ramos Project Deputy for Detectors at ESS.
ACP S&T Programme - Stakeholder conference October Implemented by the ACP Secretariat Funded by the European Union EDULINK - ACP Science and.
“Reporting Procedure for I3” Seadatanet kick-off Heraklion, June 8-9, 2006 Lorenza Saracco, European Commission DG Research.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
EPOCA – 11. June EPOCA Project Management (WP1): Deliverables and reporting 11. June 2008.
Administrative matters Katherine Loens. The periodic activity report: Section 1 – Project objectives and major achievements during the reporting period:
STRUCTURE SCIENTIFIC REPORT / MANAGEMENT REPORT −Progress / objectives (WP and project level) −Progress / milestones (WP and project level) −Progress /
EGEE is a project funded by the European Union Overview of contract and FP6 procedures Fotis Karayannis EGEE SEE Fed. Representative in PMB, GRNET Zoi.
WP1- Management EuroVO-DCA 1 st PCT Meeting – 3&4 May 2007 Mathias DEPRETZ – EuroVO-DCA Project Manager 1 st PCT meeting 3&4 May 2007 Strasbourg EuroVO.
INCO 3739 Integrating Multiple Demands on Coastal Zones with Emphasis on Aquatic Ecosystems and Fisheries Third Annual and Final Reporting 4th Project.
EUROPEAN RESEARCH AND INNOVATION OFFICE 4 th FLUTCORE Progress Meeting September 23 rd 2015 – London WP9 - Project Management Amelie Guisseau UCL European.
CAST: Financial and administrative issues Project funded by the European Commission, Directorate-General Energy & Transport, under the 6th RTD Framework.
Advanced Remote Tower 1 13 Nov 2007Malmö/Sturup1 Advanced Remote Tower Administrative processes (WP0.1, WP4.3) Malmö/Sturup 13 Nov 2007.
NANO SCIENCE IN SOLAR ENERGY
April, 10th – 11th 2014, Savona WP6 – Project Management.
Coordinators' day on FP7 Project Negotiation Description Of Work Annex I Griet Van Caenegem DG CNECT R5 Programme Operations May 28, 2013.
Ismar Financial report procedures. Ismar Financial reporting For each reporting period of activity Each partner shall produce a “Periodic Management Report”
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
1 FP6 – Financial Management and Reporting 1 April 2006 Sofia, Bulgaria.
WP8 Project management Milan Gocić University of Niš
WP3 - Evaluation and proposal selection
UNISEC Universal Influenza Vaccines Secured
Third PMC meeting University of Priština, Kosovska Mitrovica
Work package 3: Materials for energy
4th. Plenary Meeting, Edinburgh, May 2010
EC project periodic and continuous reporting
EMI Project Processes and Tools
Annual Report Instructions
Growth & Characterization of GaSb
FP7 SCIENTIFIC NEGOTIATIONS
COGAIN Kick-Off 5-6 September, 2004 FINANCIAL GUIDELINES
Presentation transcript:

Intermediate Band Materials and Solar Cells for Photovoltaics with High Efficiency and Reduced Cost Kick-off meeting, Madrid 7th February 2007 IBPOWER UNott HMI Project Review (Science) IES UPM

IBPOWER IES UPM Agenda

IBPOWER IES UPM Outline Background The work-packages Immediate actions overview

IBPOWER IES UPM Background

IBPOWER IES UPM Background

IBPOWER IES UPM P = I x V I V Background

IBPOWER IES UPM P = I x V I V I V Background

IBPOWER IES UPM P = I x V I V I V Background

IBPOWER IES UPM P = I x V I V I V optimum (~silicon) Background

IBPOWER IES UPM P = I x V I V I V Background

IBPOWER IES UPM P = I x V I V I V Background

IBPOWER IES UPM P = I x V I V I V Background

IBPOWER IES UPM A. Luque, and A. Martí, Physical Review Letters 78, 5014 (1997). A. Luque, and A. Martí, Progress in Photovoltaics: Res. Appl. 9, 73 (2001). n + emitter p + emitter IB material Background

IBPOWER IES UPM A. Luque, and A. Martí, Physical Review Letters 78, 5014 (1997). A. Luque, and A. Martí, Progress in Photovoltaics: Res. Appl. 9, 73 (2001). n + emitter p + emitter IB material Background

IBPOWER IES UPM Sun V=0 R=0 A. Luque, and A. Martí, Physical Review Letters 78, 5014 (1997). A. Luque, and A. Martí, Progress in Photovoltaics: Res. Appl. 9, 73 (2001). Background

IBPOWER IES UPM A. Luque, and A. Martí, Physical Review Letters 78, 5014 (1997). A. Luque, and A. Martí, Progress in Photovoltaics: Res. Appl. 9, 73 (2001). V Sun Background

IBPOWER IES UPM A. Luque, and A. Martí, Physical Review Letters 78, 5014 (1997). A. Luque, and A. Martí, Progress in Photovoltaics: Res. Appl. 9, 73 (2001). V Sun Background

IBPOWER IES UPM A. Luque, and A. Martí, Physical Review Letters 78, 5014 (1997). A. Luque, and A. Martí, Progress in Photovoltaics: Res. Appl. 9, 73 (2001). V Sun eV Background

IBPOWER IES UPM A. Luque, and A. Martí, Physical Review Letters 78, 5014 (1997). A. Luque, and A. Martí, Progress in Photovoltaics: Res. Appl. 9, 73 (2001) % 0.71 eV 1.24 eV 1.95 eV 40.7 % Background

IBPOWER IES UPM tandem of 2 IBSC: 6 gaps only one tunnel junction conventional 6 gaps tandem 5 tunnel junctions E. Antolín, A. Martí, and A. Luque, in Proc. of the 21st European Photovoltaic Energy Conference, 2006, pp Background

IBPOWER IES UPM Background FULLSPECTRUM IBC QD-IBSC TF-IBSC GaInN-IBSC XMetal-IBSC solar cells ! CONFIDENTIAL

IBPOWER IES UPM Outline Background The work-packages Immediate actions overview

IBPOWER IES UPM WP1: QD-IBSC QUANTUM DOT INTERMEDIATE BAND SOLAR CELL A. Martí, L. Cuadra, and A. Luque, in NEXT GENERATION PHOTOVOLTAICS: High Efficiency through Full Spectrum Utilization (Institute of Physics Publishing, Bristol, 2003), pp. 140.

IBPOWER IES UPM A. Martí, L. Cuadra, and A. Luque, in NEXT GENERATION PHOTOVOLTAICS: High Efficiency through Full Spectrum Utilization (Institute of Physics Publishing, Bristol, 2003), pp WP1: QD-IBSC

IBPOWER IES UPM WP1: QD-IBSC current is not increased because dots do not absorb enough light FULLSPECTRUM (first months) IBPOWER will take over voltage recovery requires concentration IBPOWER (concentration devices) CONFIDENTIAL

IBPOWER IES UPM WP2: TF-IBSC CONFIDENTIAL

IBPOWER IES UPM WP3: InGaN-IBSC CONFIDENTIAL Mn in high concentration Also As (arsenic)

IBPOWER IES UPM WP4: Xmetal-IBSC CONFIDENTIAL

IBPOWER IES UPM WP5: Characterisation & Modelling CONFIDENTIAL

IBPOWER IES UPM Objectives 4 intermediate band solar cells 4 objectives To manufacture XMetal-IBSCs To manufacture Thin film-IBSCs To manufacture InGaN-IBSCs To manufacture QD-IBSCs CONFIDENTIAL

IBPOWER IES UPM Outline Background The work-packages Immediate actions overview

IBPOWER IES UPM Inmediate actions Dedicated meetings, if neccesary, to  TF-IBSC (HMI&UPM-IES)  InGaN-IBSC (Unott&UPM-IES&UG)  XMetal-IBSC (Riber&UPM-IES&UG) 6 months (August 1st) year 1 WP1QD-structure grown +processed & characterised WP2TF cell manufactured + characterized WP31st InGaN test structure + characterization WP4MBE assembly well advanced + first test samples WP5complete theoretical studies (mainly InGaN and X-Metal and TF-IBSC) +characterization CONFIDENTIAL

IBPOWER IES UPM Intermediate Band Materials and Solar Cells for Photovoltaics with High Efficiency and Reduced Cost Kick-off meeting, Madrid 7th February 2007 IBPOWER UNott HMI Project Review (Reporting and Administration) IES UPM

IBPOWER IES UPM Logo IBPOWER

IES UPM Gender issues a compulsory topic in the agenda

IBPOWER IES UPM Rules Rule 1: Make the Commission happy

IBPOWER IES UPM Rules Rule 1: Make the Commission happy...by delivering the deliverables on time CONFIDENTIAL

IBPOWER IES UPM Rules Rule 1: Make the Commission happy Rule 2: Make the Commission happier

IBPOWER IES UPM Rules Rule 1: Make the Commission happy Rule 2: Make the Commission happier...by achieving milestones = “scientific excellence” CONFIDENTIAL

IBPOWER IES UPM Rules Rule 1: Make the Commission happy Rule 2: Make the Commission happier Rule 3: Make the Commission happiest...by providing financial reports

IBPOWER IES UPM A few words of dissemination For the general public

IBPOWER IES UPM A few words of dissemination For the general public For the scientific community International Journals

IBPOWER IES UPM A few words of dissemination For the general public For the scientific community Acknowledgment to EC External reviewing Deep thinking Precisse comunication among partners International prestige European Research International Journals

IBPOWER IES UPM Acknowledging This work has been supported by the European Commission through the Project IBPOWER, Grant Agreement

IBPOWER IES UPM Guidance for reporting Will appear published in Following Annex II.4, we preview: 1. The consortium shall submit a periodic report to the Commission for each reporting period within 60 days after the end of each respective period. The reporting shall comprise: a)an overview, including a publishable summary, of the progress of work towards the objectives of the project, including achievements and attainment of any milestones and deliverables identified in Annex I. This report should include the differences between work expected to be carried out in accordance with Annex I and that actually carried out b)an explanation of the use of the resources (we plan to send a template) c)a financial statement, from each beneficiary together with a summary financial report consolidating the claimed Community contribution of all the beneficiaries in an aggregate form, based on the information provided in Form C (Annex VI) by each beneficiary. (Can be downloaded from: Audit certificate on finantial statments (every €) Annex VII Form D (Can be downloaded from Audit certificate on methodology (requested by beneficiary and if Accepted by EC, there is no need to submit Audit Certificate on finantial statments) Annex VII Form E (Can be downloaded from Can we get Word versions for Annex VI and VII?

IBPOWER IES UPM Semester Report Forms (internal forms) Let’s have a look to the form: linklink can be downloaded form serves to track publications serves to collect presentations (mark as “confidential” confidential slides) serves as check list for the meeting reward: if you publish, only the presentation! CONFIDENTIAL

IBPOWER IES UPM Reflection It is a project of Risk but also of oportunities, for example: –Inplementing the IBSC with QDs and X-Metal IBSC application by themselves or in multistack systems. –TF-IBSC. –All InGaN solar cell. CONFIDENTIAL

IBPOWER IES UPM Next meeting We plan to rent a room at some Hotel during the European PV conference: September 1-5th 2008 (

IBPOWER IES UPM Intermediate Band Materials and Solar Cells for Photovoltaics with High Efficiency and Reduced Cost Kick-off meeting, Madrid 7th February 2007 IBPOWER UNott HMI The next six months IES UPM

IBPOWER IES UPM The next six months Main guideline: To progress effectively towards complete solar cell manufacturing Define structures CONFIDENTIAL

IBPOWER IES UPM Concentrator QD-IBSC QD-IBSCreference CONFIDENTIAL (includes figures revised during the kick-off)

IBPOWER IES UPM XMetal-IBSC referenceXMetal-IBSC CONFIDENTIAL (includes figures revised during the kick-off)

IBPOWER IES UPM InGaN-IBSC (Mn) In 0.85? Ga 0.15? N-IBSCreference CONFIDENTIAL (includes figures revised during the kick-off)

IBPOWER IES UPM InGaN-IBSC CONFIDENTIAL C. T. Foxon, I. Harrison, S. V. Novikov, A. J. Winser, R. P. Campion, and T. Li, "The growth and properties of GaN:As layers prepared by plasma-assisted molecular beam epitaxy " Journal of Physics- Condensed Matter vol. 14, pp , 2002.

IBPOWER IES UPM TF-IBSC CONFIDENTIAL

IBPOWER IES UPM Summary next 6 months