Cavity Tuner Spec. profile for Plug Compatibility H. Hayano April 22, 2008 ILC-SCRF

Slides:



Advertisements
Similar presentations
of LFD Compensation Study S1 Global Cryomodule
Advertisements

Tuning system requirements
Development of a mover having one nanometer precision and 4mm moving range Y. Morita, S. Yamashita ICEPP, University of Tokyo Y. Higashi, M. Masuzawa,
Capture Cavity 2 Update Tim Koeth April 3 rd Testing at 4.5K.
Cavity Technical Specification IWLC2010 WG3 industrialization session H. Hayano Geneva,Oct.2010.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Cost comparison of tuners H. Hayano, KEK AWLC14
Shuichi Noguchi, KEK6-th ILC School, November Auxiliary Components  Input Power Coupler  HOM Dumping Coupler  Frequency Tuner  He Jacket  Magnetic.
Cavity Integration summary H. Hayano April 25, 2008 ILC-SCRF
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
ILC S0 Strategy Proposal FNAL GDE status 報告会 4月28日: (空胴表面プロセス、空胴システム)
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
Test infrastructure and test programs at KEK-STF Kirk 2013/3/26TTC meeting
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
Carlo Pagani University of Milano & INFN Milano - LASA Blade-Tuner Performance LCWS08 and ILC08 University of Illinois, Chicago, November 2008 Material.
TESLA MEETING May 2003 Frascati LINAC TECHNOLOGY WORKING GROUP Working Group Linac techology introduction Cryomodule design and Assy. Tuner issue.
Shuichi Noguchi,SRF2007,10.71 New Tuners for ILC Cavity Application Shuichi Noguchi KEK.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Lutz Lilje, DESY, TILC08 Tests with the Fast Frequency Tuners in the Saclay-I design Lutz.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Compatibility in the ILC ML. 主なデザインと相違点 BCD ( TTF) STF-BL その他 空洞、シー ル Φ 78 mm ビームパイ プ、アルミヘキサゴ ン Φ 80 mm ビームパイ プ、インジウムヘリ コ LL, Re 入力カプ ラー TTF-III 円筒セラミック窓.
STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
ATF DR Overview Introduction Low emittance history Present status S.Kuroda ( KEK ) GDE Review 3rd Apr.2013.
Plug compatibility Document ILC10 cavity integration session H. Hayano.
SPOKE TUNER STATUS M. Merio, D. Passarelli, L. Ristori.
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
28/Jul/ Test Results of the International S1-Global Cryomodule Kirk.
Beijing ILC Workshop Global Design Effort 1 High-Gradient Module Test Lutz Lilje.
ILC FAST TUNER R&D PROGRAM at FNAL Status Report CC2 Piezo Test Preliminary Results Ruben Carcagno (on behalf of the FNAL FAST TUNER Working Group) 4/5/06.
E. KAKO (KEK) 2009' Dec. 2 5 STF Meeting for S1-G Global Design Effort 1 Cavity string assembly at KEK for S1-Global Eiji Kako (KEK, Japan)
Shuichi NoguchiHayama ILC Lecture, Part III ILC BCD Cavity  Maximum Use of Potential Performance  Maximum Use of each Cavity Performance 
Carlo Pagani University of Milano & INFN Milano - LASA WP8 Tuner Status & Perspective ILC-HiGrade Kick-Off Meeting DESY, Hamburg 29 August 2008 Material.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
Rocco Paparella INFN Milano - LASA WP8 - Tuners Report ILC-HiGrade Scientific and Annual Meeting LAL, Paris, March 6 th 2009 On behalf of LASA team: C.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Definition of Work Area H. Hayano, KEK EDR-KOM-cavity at DESY Issues of Cavity and Cavity Package, Work Package discussion.
ALCPG11 1 Comparison of Tuner Performance in S1-G Cryomodule Rocco Paparella, on behalf of S1-Global team.
Preliminary Results from First Blade Tuner Tests in HTS Yuriy Pischalnikov Warren Schappert Serena Barbannoti Matteo Scorrano.
GDE 4/Mar/20081 Lorentz Detuning Calculation for the transient response of the resonant cavity Introduction “Two modes” model Method of the.
Cavity and Cryomodule Plug-Compatibility To Reach Consensus Akira Yamamoto ILC-08, Chicago, Nov. 17, 2008 Nov. 17, 2008ILC-08 SCRF1.
20 October 2010 – C.Pagani IWLC S1-Global Tuner Performance Study Carlo Pagani, on behalf of INFN Milan team.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
Detail plan of S1-Global H. Hayano (KEK),
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Specification Table 23 Oct 2007 FNAL Lutz Lilje DESY.
Hayama ILC Lecture, , Shuichi Noguchi 1 Part III ILC BCD Cavity  Maximum Use of Potential Performance  Maximum Use of each Cavity Performance.
Tuner, Coupler WP & specification table H. Hayano, KEK GDE Sendai.
Plug compatibility discussion TILC09 cavity integration session H. Hayano.
LCLS II Tuner Mechanics; Accessibility/Replacement E. Borissov, Yu.Pischalnikov SRF cavity Tuner Workshop, FNAL, Oct. 13.
SLIM BLADE TUNER. Modifications & Reliability. Lessons learned from FNAL’s Cryomodule #2 & S1-Global Presented by Yuriy Pischalnikov (FNAL) S1-Global tuners.
SLIM BLADE TUNER. Modifications & Reliability. Lessons learned from FNAL’s Cryomodule #2 & S1-Global Presented by Yuriy Pischalnikov for FNAL Tuner team.
Development of Cryo-Module Test System (CMTS-1) S.B. Jawale Head, Centre for Design and Manufacture BARC, Trombay, Mumbai Cryo-Module Test System.
Tuners for 1.3 GHz Elliptical Cavities Warren Schappert Fermilab TD/I&C Thursday May 29, 2013.
TDR parameter discussion on Cavity, Cavity Integration R. Geng, H. Hayano
Shuichi Noguchi, KEKTTC Meeting at IHEP Beijin, Slide Jack Tuner.
TDR guideline discussion on Cavity Integration
Power Couplers, HOM Couplers and Tuners for the XFEL
R. Paparella, INFN-Milan, LASA Laboratory, Segrate, Italy
SCRF 21-25/Apr/2008 Measurement & Calculation of the Lorentz Detuning for the transient response of the resonant cavity Introduction “Two.
Tuner system Zhenghui MI 2017/01/17
Crab Cavity R&D Plan Kirk 1 6/Dec/2016
S1-G Webex meeting Global Design Effort
Mechanical setups Lorentz Force Detuning System Setup
Tuner system for CEPC MI Zhenghui 2016/09/14
Nick Walker (DESY) EU GDE Meeting Oxford
TTC meeting, Milano Global Design Effort
Presentation transcript:

Cavity Tuner Spec. profile for Plug Compatibility H. Hayano April 22, 2008 ILC-SCRF

Spec. Profile Table (Slow GDE meeting/Sendai

Spec. Profile Table (Fast GDE meeting/Sendai

Major spec. items not yet determined Slow tuner: Motor Location Fast tuner: actuator Location

Slow Tuner TTF STF Saclay -1BladeSlide JackBall Screw Lifetime Test (~ 0.1mm x Times) is necessary. Mechanism Double LeverBlade+Lever+ScrewWedge+Screw+GearScrew+Worm Gear Blade has the potential Problem of Fatigue. Life time of Coating? Stiffens N /  m Not Stiff Not Stiff. If used to TESLA Cavity DLD at Flat-Top becomes ~900Hz. Strokemm < Long enough Location Beam PipeJacket Cylinder The room for tuner is small. Top Heavy. Alignment? Cost Example of comparison table

Fast Tuner TTF STF Saclay -1BladeSlide JackBall Screw Piezo(200V) Piezo(150V)Piezo+Blade Speed ? Blade has the potential Problem of Fatigue. Speed ? NORIAC (1 Spare) Piezo Mechanic x 1 Sizemm10 x 10 x 2610 x 10 x 38φ20 x 18 Stiffness N /  m Max. LoadkN4414 Stroke:RT mm Stroke:2k mm 462 Compensation mm Speed Delay 0.6 msec. Repairability Motor need Disassemble OutsidePoor Piezo need Disassemble Repairableneed Disassemble US Study on this Subject exists. How to check Piezos just we install. There are no experience for long term operation in Pulsed mode. Life time Test is necessary. Cont.

Plan for developing Tuner Work Package Finalize spec. profile table, today. Upload to EDMS team workspace now. Revise any spec. in any time, if it is inconsistent. Develop tuner comparison table and R&D of each tuner. Write and develop ‘recommendation of motor location’ according to the past presentations and R&D, report it to PM by the next FNAL meeting. 22 April, ILC-GDE meeting at FNAL