1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.

Slides:



Advertisements
Similar presentations
Prototype Progress… The Stony Brook Crew & Bob Azmoun, Craig Woody.
Advertisements

1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
Walls crates cables gas chambers electronics CERN adb.
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
CsI Photocathode Production and Testing
01/07/08I. Ravinovich1 HBD Update Ilia Ravinovich DC Meeting, January 9, 2008.
1 HBD Update Itzhak Tserruya DC Upgrades meeting HBD, BNL, July 13, 2005 Prototypes  Full scale HBD  Readout board  FEM Final detector  HBD Design.
1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
1 Searching for the QGT: Quantum Efficiency Gain Transparency TK Hemmick for the HBD Crew.
1 AGENDA: HBD NIM paper#2 Itzhak HBD HV system HBD monitoring Acceptance and total number of channels Proposal status Large GEM tests Lev Monte Carlo Ilia.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
PHENIX upgrade DAQ Status/ HBD FEM experience (so far) The thoughts on the PHENIX DAQ upgrade –Slow download HBD test experience so far –GTM –FEM readout.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL, April 11, 2007.
1 HBD Plans for run-6 Itzhak Tserruya DC meeting, BNL, October 12, 2005 HBD status Plans for run 6 ( Back-up: details presented in Upgrades meeting yesterday)
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
Sasha Milov EC/DC meeting March 9, Assembly and testing facility. Sasha Milov March 9, 2005 Sequence of operations Glove Box Evaporator Other needs.
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2012 – Dec – 12 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
Updated HBD FEM Diagram Clock Master Clock fanoutADC Optical out Backplane Crate GTM/Ethernet New Daughter card + DCM Test pulse.
Flavio Gatti,Frascati-PSI, Jan 31 th, 06 1 TC status. Flavio Gatti UNIVERSITY and INFN of Genoa, Italy.
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
1 HBD Update: DC Meeting June 2006 Thomas K Hemmick for the HBD Crew…
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
HBD Gas and QE Monitoring Craig Woody BNL HBD Working Group Meeting October 19, 2005.
Status of NA62 straw electronics Webs Covers Services Readout.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
1 Sasha Milov DC meeting Nov 9, 2005 HBD upgrade status. Sasha Milov Nov 09, 2005.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Itzhak Tserruya, July 7,  Towards HBD Proposal  Ongoing activities and plans for the next two months Itzhak Tserruya HBD meeting at BNL, September.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
HBD CDR Gas System and Monitoring Craig Woody BNL DC Upgrades/EC Meeting March 9, 2005.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
Itzhak Tserruya, BNL, May13, HBD R&D Update: Demonstration of Hadron Blindness A. Kozlov, I. Ravinovich, L. Shekhtman and I. Tserruya Weizmann Institute,
1 Installation Logistics Itzhak Tserruya HBD meeting BNL, July 6, 2006.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
CLAS12 Drift Chamber Prototyping
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
1 Sasha Milov DC meeting Sept 12, 2007 HBD status Sasha Milov Sept 12, 2007.
Update on the HBD Craig Woody BNL DC Meeting May 11, 2005.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
1 HBD Update Itzhak Tserruya Upgrades meeting, BNL, October 11, 2005 Full-scale Prototype status Safety Review Detector box construction GEM production.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Electronics Status New DCM daughter card works. –Three cards has been assembled. –One daughter card has been send to Jamie yesterday by FedEx overnight.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
Update on HBD Activities at BNL Craig Woody BNL HBD Working Group Meeting November 16, 2004.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
On the Prototype beam test: (I) Noise and signal extraction
SBS Front Tracker GEM short update on inefficient sectors
Status of Readout Boards
Presentation transcript:

1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items order CsI and testing facility Gas system and gas monitoring system Preamps and Readout boards Readout electronics

2 Plans for Run 6 We plan to test the HBD in run-6. We lost time due to the initial cancellation of Run-6. Order of critical items (like the PCB) got delayed and **we are trying hard** to recuperate that time so as to be able to install one box of the final detector by the end of May. To be realistic we need a fall-back solution. For that, and to pave the way for the installation of the final box detector, we are preparing the full-scale prototype for installation in April. By construction, the prototype will have only one detector module instrumented. The final HBD box could have all 12 detector modules installed but only a few will be instrumented (probably two), depending on the availability of readout electronics.

3 HBD box construction All raw materials (FR4 sheets, honeycomb, HV resistors, HV connectors) all parts ( frames, window support, inserts, pins, screws, HV holders) in house. Jigs for panel construction ready Panel construction underway Jigs for box assembly under design or construction Bottleneck: PCB delivery 6 active panels 2 HV panels 2 side covers with frame 2 vertical panels 2 box frames window support

4 A few pictures: frames (I) McPherson 234/302 VUV spectrometer - uses pure argon as reference gas (no vacuum) - completely enclosed 30 W D 2 lamp Box frames Window support frames Side cover frames

5 A few pictures: inserts (II) Gluing GEM support inserts on inner side of an active panel insert for gas in/out swageloc port All small parts ready lGEM support pin inserts for GEM support pin

6 A few pictures (III) McPherson 234/302 VUV spectrometer - uses pure argon as reference gas (no vacuum) - completely enclosed 30 W D 2 lamp Testing HV wiring - worst case 14 wires in – 21 wires out Gluing under vacuum of honeycomb to FR4 sheet Honeycomb glued to FR4 sheet

7 GEM assembly and testing 3 GEM shipments so far: - 1 st batch (Oct. 05): 20 st + 10 Au plated + 30 frames - 2 nd batch (Jan. 06): rd batch (Feb. 06): Total Assembly steps and tests: - Stretch GEM foil and glue onto frame - Cut foil from stretching device - Solder SMD resistors to each HV segment - QA: apply 500 V across the GEM on air before and after each of these steps - Operate GEM at 500 V with 55 Fe on Ar/CO 2 and map the gain on 56 hexagonal pads - all data stored in a database Status - 1 st batch: all of them assembled 16 st + 10 Au plated passed all tests - 2 nd batch: 9 assembled. All 9 failed the tests. 4 of them passed the tests only after water cleaning. Reason not clear. The other 5 will also follow water cleaning. - We have a total of: 30 GEM fully tested (10 Au plated and 20 standard) i.e. 10 detector modules

8 Status of urgent item orders PCB - raw material produced in GB is supposed to be delivered within days to CERN. - once the raw material arrives at CERN, GEM production will be interrupted. - manufacturing of PCB estimated to maximum 4 weeks, will strive for 3 weeks. - delivery expected first half of March. - once we receive the PCB, we will need app. 1 month to complete the construction of the detector box. Glove box - enlarged glove box ordered. Expected delivery days, (Tom H says closer to 45d)  end March Signal cables - ordered. Delivery 6-8 weeks  mid March Gas monitoring system - 3 cell gas system ordered. Expected delivery days  April-May - Marginal for run-6. Will rely on water and oxygen monitors

9 CsI evaporation facility at SB Bill Andrzej - excellent photocathodes have been produced at SB using the Italian evaporator from Jlab. - one shot per week to master the whole procedure: handling of the GEMs, evaporation and measurements of absolute QE. - The “completeness” of the process grows each week. “Damn good vacuum in evaporator” (TomH)

10 GEM testing facility at SB Stainless steel test box and 6 GEM (2 Au plated + 4 standard) shipped from WI to SB. Top GEM was “rubbed” by cross-pieces of grid during shipping. No other GEM showed damage.  Need to improve shipment conditions exercising handling, assembly and testing of triple GEM detector modules to start soon

11 Gas transparency monitor system McPherson 234/302 VUV spectrometer - uses pure argon as reference gas (no vacuum) - completely enclosed 30 W D 2 lamp 3-cell monitor system ordered by McPherson Hutch and services ready – Don L. 11/22/05

12 Total detector volume: ~ 626 l (313 l each side) Flow rate: ~ 60 l/hr ( ~ 150 l/hr purge) HBD Gas System Pure CF 4 Simplified Single pass system for Run 6 Extensive gas monitoring to maintain O 2 and H 2 O levels to a few ppm R.Pisani Gas pipes installed Most components ordered or in house

13 Preamps, readout boards and readout electronics Boards for the new pre-amp design were delivered a few days ago. Problem with slicing the board? We should have enough pre-amps for at least two readout boards (Joe Harder). New readout boards design finished. Material with optimized thickness, for minimum radiation length, ordered. Production will be made in BNL instrumentation (Bo). Readout electronics full chain test expected very soon. Only the prototype electronics will be available in run-6 (Chi).

14 Updated HBD FEM Diagram Clock Master Clock fanoutADC Optical out Backplane Crate GTM/Ethernet New Daughter card + DCM Test pulse (7 blank boards, 4 crates+ 1 spare+ 2 test stands) (4 blank boards, 1 needed + 1 spare+ 2 test stands) (25 blank boards. We have major of the parts for 5 boards)  All boards in house and tested with the exception of the new DCM and optical module  Prototype DCM and optical module expected end of February.  Full chain test will then take place.  Two FEM already exist. Have parts for additional 5 FEM  total 336 channels (2 detector modules = 192 channels) C.Y. Chi