Cowichan Lake and River status update Trend updates as of July 27, 2015.

Slides:



Advertisements
Similar presentations
Protecting Michigans Water Resources James Clift, Michigan Environmental Council October 23, 2008.
Advertisements

Kaslo & Area D Climate Change Impacts on Water Provision – INITIAL DRAFT March 19, 2010 Remember Mohs Law of Increased Rate of Chemical Reaction: Each.
Case S-5_L-Reactor1 Case Study 5: L-Reactor Thermal Effluent.
The Entergy facility is a boiling water reactor with a rated core thermal power level of 1912 MW, providing a gross electrical output of 620 MW. The facility.
Chapter 7 Discrete Control Using Wireless Field Devices.
Water Center Symposium The Colorado River Cooperative Agreement Chris Treese, External Affairs Manager October 31, 2011 Grand Junction, CO.
Watershed Sustainability through local stewardship.
Flow Equalization Tanks Presented by Keith Surface.
BEST OPERATING & MAINTENANCE PRACTICES RELATED TO 21 MW & 16 MW STEAM TURBO-GENERATORS Dr T. G. Sundara Raman Seshasayee Paper & Boards Limited IPPTA Zonal.
to 2015 Operating Budgets Governance & Priorities Committee March 7, 2013.
Water ImpEE Improving Engineering Education PROJECT THE.
Cedar River Instream Flow Management Balancing Certainty and Flexibility.
June 26, PCWA - Middle Fork Project Project Operations
Yellowtail Dam & Bighorn Lake Billings, Montana January 2011 RECLAMATION Managing Water in the West.
Yellowstone River Compact Commission Technical Committee Discussions Sheridan County Courthouse Sheridan, WY April 24, 2007 Bighorn Reservoir operations.
Chapter 12: Alternative Technologies To be used with the Guide to Building Energy Efficient Homes in Kentucky.
The Water Cycle.
Hydrologic Cycle. Water Cycle The movement of water from the Earth’s surface into the air and back to the surface again
Determination of Ellenburger Aquifer Sustainability
Water Cycle.
Claytor Hydroelectric Project Water Quality Study Mark Hutchins, Project Manager January 25, 2007.
Deksyos Tarekegn National DSS Specialist - Ethiopia
13A.2 – California’s Water Resources
Thames Valley/Matatoki Water Supplies October 2012.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
Review Afternoon 22/5/2007 Impacts of climate change and biodiversity loss.
BOAT HANDRAIL HEATING SYSTEM Group 11 Oscar Garcia Nik Hartney Pamela Mills Nicole Turner.
Re-Commissioning of the Water Cooling System at Université de Sherbrooke Department of Buildings June 2008.
Cowichan Lake Storage Assessment – 2015 Final Results Craig Sutherland, M.Sc., P.Eng. July 27, 2015.
CANADIAN COLUMBIA RIVER FORUM Biological Opinion: An overview of The impacts on Water Management Jim Barton, Chief of Corps of Engineers Columbia Basin.
Chinese exports of finished steel in June registered a 10% fall from May’s levels to 4.29 million tonnes (m t). Having peaked in March at 4.9m t, exports.
Fisheries Protection Program: An overview November
USBR Updates: Green River CRFS Meeting March 27, 2014.
Regional Water Availability Rulemaking Chip Merriam Water Resources Advisory Commission February 8, 2007 Chip Merriam Water Resources Advisory Commission.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
PNISG Update June Xoserve’s UKLP Assessment Principles 1.Maintain current delivery plans where possible and appropriate e.g. don’t just push all.
USACE Managing a Drought  Overview  Timeline  Depletion Scenario Current Status– 17 Oct 07.
Planet Water Our Planet is covered by water, an astonishing 71 percent! If the world was uniform all the way around water would cover the planet to a.
ERCOT Generation Drought Best Practices Workshop Water Conservation Practices for Texas Generators February 27, 2012.
Procedures to Implement the Texas Surface Water Quality Standards
Desalination.
Event jointly staged by Steve Colella South Staffs Water.
Existing System The system originally operated with everyone having 24-hour availability. The village then created a 3-day rotation which improved the.
Hydro Power – the history and the future. Robyn Hammond, School of Environmental Sciences, University of East Anglia. 24 th February 2005.
CBRFC June 2010 Water Supply Webinar 1 pm, June 7, 2010 Greg Smith These slides: PLEASE MUTE YOUR PHONES.
Building Competitive Advantage Through Functional-Level Strategies
Bodies of Water and Landforms. Bodies of Water The ocean is an interconnected body of salt water that covers about 71% of our planet. The ocean is an.
Drought Management Sheri Looper CVP Water Resource Specialist.
CRFS Technical Committee Fall Meeting LC Operations Update December 8, 2015.
Back River Mine Project Presentation to the Nunavut Impact Review Board Final Hearing Cambridge Bay, NU April 25-30,
The Water Cycle.
Nunavut Water Board Public Hearing
Comparison of THREE ELECTRICAL SPACE HEATING SYSTEMS IN LOW ENERGY BUILDINGS FOR SMART LOAD MANAGEMENT V. Lemort, S. Gendebien, F. Ransy and E. Georges.
Biogeochemistry of Tempe Town Lake
Water Pollution.
Bell work Predict whether leaving the refrigerator door open on a hot summer day will help to cool the kitchen.
Albeni Falls Dam Operations
Building Competitive advantage through functional level strategies
Water Systems On Earth.
Water Systems On Earth.
Natural Sources of Water
Cowichan Lake and River status update
Water Systems On Earth.
Building Competitive advantage through functional level strategies
Presentation by Graham Kissack
Super chilling.
WHAT ARE ECOSYSTEMS?.
Chapter 10.1.
Building Competitive Advantage Through Functional-Level Strategies
Resource Management and Climate Protection Committee Meeting:
Presentation transcript:

Cowichan Lake and River status update Trend updates as of July 27, 2015

2 Lake level down 65 cm(67% used) / 33% remains

3 River Flow Holding at 5.5 cms since June 11

2014 included 63 days with release at 4.5 cms 4

Crofton mill in 2015 using less than 1.6 cms of water from Cowichan River 5

Mill focus on water use has achieved 0ver 30% reduction in since

Peak summer water use continuing to improve (lower) each year (2015 (May/June) 26% less peak flow than 2000) 7

In peak summer period year over year water use reduction of 5% and 10% for 2013/14 & 2014/15 Focus on water use reduction continues 8

Coming 2 weeks – no rain expected 9

Key Initiatives at mill – reduce water demand Maximize application of salt water for cooling effluent – avoid use of fresh water for this purpose Rebuilt entire foreshore heat exchanger system in recent 2 years and optimization continues. Modified temperature control strategy: prevent use of fresh water for cooling effluent until high- high alarm for effluent temperature at 107 F Improved visibility of use of sea and fresh water to ensure issues are promptly recognized and resolved – recently the intake screen for sea water has been plugging off rapidly – divers needed to clean weekly 10

Next Steps Continue to reduce water use at mill to ensure maximum flows in river below river pump house are sustained Reduce river flow at Lake Cowichan to 4.5 cms to prevent total loss of river flow prior to arrival of fall rains (minimize duration of impact to resident and spawning fish resources and to mill operations). Ensure flow below river pump house remains above 2.83 cms as is required by the license. 11

Longer Term: Increased storage in Lake Cowichan is needed Catalyst supports the need for a longer term secured water supply for all stakeholders. Catalyst supports the CVRD bid for grant money for raising the weir. Catalyst is committed to work with a larger stakeholder group to move forward. 12

In response to request for guidance from DFO, both a detailed description of in stream activities was provided by DFO and a response by Catalyst Paper has been provided to support that work Attachment 1 – DFO guidance to Catalyst Attachment 2 – Catalyst commitment to conduct the investigation to support 4.5 cms Next step is to, as instructed, gain support from flows committee for the work needed to allow a flow reduction down to 4.5 cms Flows committee meeting this afternoon 13