CUSHMAN FLOATING SURFACE COLLECTOR SMOLT EVALUATION Pre-Proposal Meeting PG14-0665F December 16, 2014.

Slides:



Advertisements
Similar presentations
The effects of summer flow augmentation on the migratory behavior and survival of juvenile Snake River fall Chinook salmon Project
Advertisements

COMPARATIVE SURVIVAL STUDY (CSS) of PIT-tagged Spring/Summer Chinook and PIT-tagged Summer Steelhead CBFWA Implementation Review Mainstem/Systemwide.
E STABLISH R ELATIONSHIP B ETWEEN F ISH P ASSAGE S URVIVAL AND T URBINE O PERATING E FFICIENCY NORMANDEAU ASSOCIATES HTI, Inc. and J. R. Skalski (Proposal.
Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River Project No Tara White, Shannon Jewett, Josh Hanson,
Evaluate juvenile salmon residence in the Columbia River Plume using micro-acoustic transmitters John Ferguson, et al. Riverine Ecology Program NWFSC,
Rebecca A. Buchanan Columbia Basin Research School of Aquatic and Fishery Sciences University of Washington Seattle, WA INVESTIGATING MIGRATORY PROCESSES.
Passage Behavior and Survival for Radio-tagged Subyearling Chinook Salmon at Ice Harbor Dam, 2006 Fish Ecology Division Northwest Fisheries Science Center.
Experiences Handling PTAGIS Data in Comparative Survival Study By Tom Berggren Fish Passage Center Portland OR.
Planning for Updates and Linkages to EM&V CALMAC February 17, 2004.
Proposed Regulatory Framework for Wastewater Presented by Claude Fortin Winnipeg, Manitoba December 6, 2007.
U.S. Pretrial Services and Probation Office Northern District of Ohio.
Contractor Assurance System AC Overview October 13, 2009.
Adult Steelhead Monitoring Challenges in Cedar Creek, WA Josua Holowatz & Dan Rawding.
Investigation of Avian Predation Upon Salmonid Smolts With the Use of an Active Acoustic / PIT Tag Combination Curt Dotson – Grant PUD Suzie Rizor – Blue.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Deployment and Testing of the Alden Fish-Friendly Turbine by EPRI, Alden Research.
Getting Certified In Consultant Selection Steps and Processes Diana Foster.
Using the minimum distance as a metric for testing is ambiguous when fish have greater than two channels to move into. Fish GPS position during each day.
Tagging  Fish are captured via angling & implanted with a VEMCO acoustic transmitter (V13, V9, or V7) – (Figure 4).  Specific age classes are targeted.
REQUEST FOR PROPOSALS RFP #08-56 Project Management and Procurement Assistance Consultant for an Intelligent Transit System Solution (I.T.S.S.) October.
1 Movements, Home Range, and Survival Estimation of Largemouth Bass following Displacement Author - Mark S. Ridgway Name of Journal - American Fishery.
Forest Practices Code Transition Larry Pedersen Chief Forester, MOF.
Managing Project Procurement
Managing Projects and Clients Senior Consultant Training 23 September 2005.
Energy & Materials Flow & Cost Tracker (EMFACT) Terri Goldberg, NEWMOA.
Report Tile Training & Management Assistance Branch UNITED STATES OFFICE OF PERSONNEL MANAGEMENT Project Kick-Off Meeting for with Project Manager Name,
EvergreenEcon.com Heat Pump Water Heater Model Validation, Market Progress Assessment, and Process Evaluation RTF HPWH Sub-Committee Meeting October 15,
U.S. Department of the Interior U.S. Geological Survey Evaluation of Alternative Commercial Fishing Gear in the Lower Columbia River, 2013: Behavior and.
Deliverable Readiness Review LexEVS 5.1 December 17, 2009.
Design and Performance of the River Mill Surface Collector
Atlanta Board of Education AdvancED/SACS “Required Actions” February 14, 2011.
1 Texas Regional Entity 2008 Budget Update May 16, 2007.
October 29, 2009 Scope Creep… Or Is it? David Heintzman PGE – Hydro Licensing NWHA/NHA Regional Forum October 28, 2009.
IDEM/OWQ Laboratory Analytical Services Pre-Proposal Conference December 5, 2011 Adam Thiemann IDOA Strategic Sourcing Analyst.
Lewis River Fish Passage Monitoring and Evaluation Plan (draft)
EvergreenEcon.com ESA 2011 Impact Evaluation Draft Report Public Workshop #2 August 7, 2013 Presented By: Steve Grover, President.
In support of Leveraging the Power of ManagePro in Meetings All services provided by Performance Solutions Technology, LLC PH. (707)
1 Presented to the Simplified Acquisition Committee on August 28, 2013 NIHCATS II electronic Government Ordering System (eGOS): An Overview.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
Get Your "Party" Started: Establishing a Successful Third-party Evaluation Martha Thurlow, Ph.D. & Vitaliy Shyyan, Ph.D.—National Center on Educational.
Regional Technical Forum Automated Conservation Voltage Reduction Protocol.
NORTH FORK SKOKOMISH POWERHOUSE & FISH FACILITIES 2013 NORTHWEST HYDRO OPERATORS FORUM STEVEN FISCHER, P.E.
1 Welcome to the International Right of Way Association’s Course 303 Managing the Consultant Process 303-PT – Revision 3 – USA.
2015 Pipeline Safety Trust Conference November 20 th, 2015 | New Orleans, LA API RP 1175 Pipeline Leak Detection Program Management – New RP Highlights.
2010 work planned, new operations, and wrap up Presenter: Robin Ehlke CSS Annual Meeting Apr 2 nd 2010.
Survival and Behavior of Juvenile Chinook Salmon in the Lower Columbia River, Estuary, and Plume G. A. McMichael 1, R. L. McComas 2, J. A. Carter 1, G.
American Recovery and Reinvestment Act of 2009 Energy Efficiency and Conservation Block Grant Program Small City and County Grant Kick-Off Meeting California.
HEALTH WORKFORCE HEALTH SYSTEM TRANSFORMATION Oklahoma State Innovation Model.
Regulatory Streamlining Task Force Update Discussion Item December 6, 2011 Board of County Commissioners.
Utilities’ Update on Energy Savings Assistance Program Studies Ordered in D LIOB Meeting August 21, 2013 Sacramento, California.
Adult Steelhead Abundance Estimates Based on PIT Tag Arrays in Idaho Rick Orme, Nez Perce Tribe Department of Fisheries Resources Management and Chris.
Should Fish PM&E Compliance = Success?. Skagit Project History  Relicensed 1995  18 Years of PM&E Implementation  30 Year License remains in effect.
Copyright 2006 by Ironsclad Solutions, Inc. All rights reserved April 28, 2006 The Business Capture Process J. Jeffrey Irons.
Hydraulic and Biological Evaluations. Hydraulic Evaluations  Measuring flow distribution for fixed vertical or rotating drums (with adjustments available).
November 3-5, 2009 Stevenson, WA Columbia Basin Coordinated Anadromous Monitoring Strategy Workshop Upper Columbia Sub-Region 2 Listed ESU/DPS Steelhead-
Evaluation of the Cougar Dam PFFC using acoustic telemetry John Beeman, Hal Hansel, Amy Hansen, Gabriel Hansen, Scott Evans, Philip Haner, Tyson Hatton,
Napa County User Fee Study Board of Supervisors: Final Report Presentation May 12, 2009.
IAS Pre-proposal Conference NOVEMBER 2, 2011 Pre-proposal Conference NOVEMBER 2, 2011 Tahoma NATIONAL CEMETERY PHASE 2 DEVELOPMENT KENT, WASHINGTON Project.
1 Energy/Compost Facility Action Plan City Council Meeting July 2, 2012.
Management System Consulting Services Chris Teague, CPSM June 17,
On the sites Two websites that provide learning materials and information Enabling organisations to meet.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Demand Response Software and Hardware
Enterprise Content Management Owners Representative Contract Approval
Adult Returns and Juvenile Outmigration Data
Roza Dam Evaluation Post Modifications
Contract Award to TMG Utility Advisory Services, Inc
Clean Energy Options for GRC Communities
Presentation transcript:

CUSHMAN FLOATING SURFACE COLLECTOR SMOLT EVALUATION Pre-Proposal Meeting PG F December 16, 2014

AGENDA Introductions5 min Purchasing Guidelines10 min Project Overview30 min Objectives Methods Approach Schedule Deliverables Question and Answer30 min Optional Site Visit60 min 2

PRE-SUBMITTAL QUESTIONS In writing via to Senior Buyer Joseph Parris By 2:00 pm, Friday, December 26, 2014 Responses: 5:00 pm, Monday Dec. 29,

BACKGROUND FERC Requirement Monitor downstream passage annually for the term of the amended license using marked groups of juvenile coho salmon Status Implementation is new No programs in place 4

PREVIOUS STUDY 2008 Meridian Environmental and LGL Limited Radio Telemetry George Adams Hatchery Coho Key Conclusions Wide variation of movements 46% detected near forebay array 17% from Release 1 81% from Release 2 37 % from Release 3 – Approached Forebay from shorelines 5

PERFORMANCE METRICS System Survival PIT Tags Released near head of reservoir Collected in FSC and passed downstream of Cushman Project Extenuating Factors Examples: Residualism Predation – Characterize co- variates 6

PERFORMANCE METRICS 7 Fish Capture Efficiency PIT Tags/Active Tags Released near FSC Cross “start line” Collected in FSC and passed downstream of Cushman Project Paired groups Passive and active tags Assumption that they behave the same and cross “start line in similar proportions”

CONSULTANT OBJECTIVES 8 1.Create Database System Survival Fish Capture Efficiency Co-variates Weekly Reporting 2.Measure Fish Capture Efficiency Multiple release groups of PIT tagged fish Subsample with active tags to estimate Zone of Influence Provide Behavioral Information 3.Analytical and Statistical Support Study setup Weekly updates Report writing

APPROACH Study Fish Origin Release Timing Flexibility left to proposer Equipment type (radio or acoustic) Staffing Plan Tacoma field staff assistance Combination of staff All contractor staff – RFP states this is for tagging, but could extend to other tasks as well 9

SCHEDULE 10 ActionDate Advertize RFPDecember 9, 2014 Pre-Proposal MeetingDecember 16, 2014 Questions DueDecember 26, 2014 Responses PostedDecember 29, 2014 Proposal DueJanuary 6, 2015 Open ProposalsJanuary 6, 2015 Selection Advisory CommitteeJanuary , 2015 Public Utility Board ApprovalJanuary 28, 2015 Finalize ContractFebruary 4, 2015 Notice to ProceedFebruary 11, 2015 Draft Annual ReportOctober 31, 2015 Final Annual ReportDecember 31, 2015

DELIVERABLES 11 Weekly summary statistics System Survival, FCE, Travel Time, and Residence Time by release group Draft Annual Report PowerPoint of Draft Results Final Annual Report Proofed Telemetry Data Records

EVALUATION OF PROPOSALS Firm’s Experience Minimum of 5 similar projects Proposed Scope and Methods Principle Investigator Experience Minimum 10 years experience Key Support Staff Define roles and responsibilities Schedule Location – Response Time Billing Rates and Estimated Hours Response to Questions Technology specifically planned Additional Studies that would aid in providing data for this project Additional Tasks outside of Scope of Work? RFP Compliance and Completeness 12

QUESTIONS 13