California Rapid Assessment Method for Wetlands (CRAM) Project and Ambient Assessments.

Slides:



Advertisements
Similar presentations
Forest Legacy Assessment of Need Identifying Future Forest Legacy Areas Governors Commission for Protecting the Chesapeake Bay through Sustainable Forestry.
Advertisements

WATER QUALITY ANALYSIS for ANTIDEGRADATION
Maryland Department of the Environment Restoration and Regulation Discussion Presented by: Wetlands and Waterways Program Maryland Department of the Environment.
Coal Mining Activities Mark A. Taylor Huntington District Corps of Engineers.
Salt Marsh Restoration Site Selection Tool An Example Application: Ranking Potential Salt Marsh Restoration Sites Using Social and Environmental Factors.
Process – Resource Evaluation Design and perform a set of geographically based resource assessments Develop a methodology for prioritizing land according.
Using Mitigation Planning to Reduce Disaster Losses Karen Helbrecht and Kathleen W. Smith United States: Federal Emergency Management Agency (FEMA) May.
Bill Orme, Senior Environmental Scientist, State Water Board Liz Haven, Asst. Deputy Director, Surface Water Regulatory Branch, State Water Board Dyan.
WETLAND REGULATORY PROGRAM Role of the U.S. Fish and Wildlife Service.
Enhancing Data Quality of Distributive Trade Statistics Workshop for African countries on the Implementation of International Recommendations for Distributive.
Simplified Risk Management Planning for A Risk Management Process Overview presentation, which should take about.
Environmental Impact Assessment: A Land Use Planning Tool Diane Sherman, Ben Purdy, and Sara Felker Department of Resource Development Introduction Environmental.
What is an In Lieu Fee Program ? Clean Water Act - Section 404 : “no overall net loss” of wetland acreage and functions. One mechanism for providing Compensatory.
WRP and Water Quality Monitoring Council: Synergy April 1, 2015 Josh Collins Chief Scientist, SFEI and ASC Co-Chair, CWMW WRP Science Advisor Jon Marshack.
“Insert” then choose “Picture” – select your picture. Right click your picture and “Send to back”. The world’s leading sustainability consultancy Legislation.
Advantages of Monitoring Vegetation Restoration With the Carolina Vegetation Survey Protocol M. Forbes Boyle, Robert K. Peet, Thomas R. Wentworth, and.
Watershed Management Framework Mission of watershed management –Coordinate and integrate the programs, tools, and resources of multiple stakeholder groups.
ACCREDITATION SITE VISITS.  DIVISION 010 – SITE VISIT PROCESS  DIVISION 017 – UNIT STANDARDS  DIVISION 065 – CONTENT STANDARDS.
Impact Evaluation Session VII Sampling and Power Jishnu Das November 2006.
Wetland Monitoring and Assessment National Water Quality Monitoring Council Meeting August 20, 2003.
What If I Must Go Beyond a Preliminary Assessment? (the example of a USAID EA under Reg. 216) [DATE][SPEAKERS NAMES]
HABITAT CONSERVATION PLANNING Charles J. Randel, 1 III, Howard O. Clark, Jr., 2 Darren P. Newman, 2 and Thomas P. Dixon 3 1 Randel Wildlife Consulting,
MULTIPLE MEASURES What are they… Why are they… What do we do… How will we know… Dr. Scott P. Myers KLFA Wednesday, August 28, 2013.
California Rapid Assessment Method for Wetlands Interpreting CRAM Scores.
Analyzing Reliability and Validity in Outcomes Assessment (Part 1) Robert W. Lingard and Deborah K. van Alphen California State University, Northridge.
Wetland Monitoring and Assessment Mid-Atlantic States
ACCREDITATION SITE VISITS.  DIVISION 010 – SITE VISIT PROCESS  DIVISION 017 – UNIT STANDARDS  DIVISION 065 – CONTENT STANDARDS.
Slide 1 Estimating Performance Below the National Level Applying Simulation Methods to TIMSS Fourth Annual IES Research Conference Dan Sherman, Ph.D. American.
1 DOE Office of Natural Gas and Petroleum Technology Overview of Environmental Program Retroactive Metrics Analysis July 2000.
STRATIFICATION PLOT PLACEMENT CONTROLS Strategy for Monitoring Post-fire Rehabilitation Treatments Troy Wirth and David Pyke USGS – Biological Resources.
Wetland Monitoring What Do We Need? Integration of Wetland Monitoring and Wetland Management Wetlands and Waterways Program Maryland Dept. of the Environment.
1 Survey of the Nation’s Lakes Presentation at NALMS’ 25 th Annual International Symposium Nov. 10, 2005.
Quality by Design (QbD) Myth : An expensive development tool ! Fact : A tool that makes product development and commercial scale manufacturing simple !
Michigan Watershed Plan Reviews Presentation at the Michigan Watershed-Based Planning Workshop, Mt. Pleasant, Michigan
Goals of CRAM program –Roles of Teams –Need and Intended Uses Summary of Science of Rapid Assessment Conceptual Model Development Process and Schedule.
Session 9 & 10. Definition of risk assessment and pre condition for risk assessment Establishment of clear, consistent agency objectives. Risk assessment.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
RTPI Conferences is managed by Kaplan Hawksmere on behalf of the Royal Town Planning Institute Strategic Planning for Renewable Energy Sarah Young MRTPI.
The concept of a Master Sample: Lower Columbia Example An Update Phil Larsen Pacific States Marine Fisheries Commission c/o USEPA 200 SW 35 th St. Corvallis,
Environmental Management Plan (EMP) Required for: Full EIA based on Palestinian EIA Policy Category A projects based on World Bank Policy.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Environment Environnement Canada Rob Kent, Chris Lochner, Janine Murray, Connie Gaudet Water Quality Monitoring and Surveillance Water Science and Technology.
Development of Sediment Quality Objectives for California Bays and Estuaries Project Update Steven Bay Southern California Coastal Water Research Project.
1 CDBG and Environmental Review For Local Officials.
COMPARABILITY PROTOCOLUPDATE ADVISORY COMMITTEE FOR PHARMACEUTICAL SCIENCE Manufacturing Subcommittee July 20-21, 2004 Stephen Moore, Ph.D. Chemistry Team.
Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information How to Develop Land Use Information.
Issues concerning the interpretation of statistical significance tests.
NOAA RESTORATION CENTER The NOAA RC seeks to make the process of regulatory review and permitting of environmentally beneficial habitat restoration projects.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Preliminary Scoping Effort. Presentation Objectives Identify need for additional sources of future funding Provide background on how elements were identified.
Renewable Energy in California: Implementing the Governors Renewable Energy Executive Order California Energy Commission Department of Fish and Game Fish.
EPA P-1 Corrective Action Streamlined Consent Orders Bob Greaves Region 3 Deb Goldblum Region 3 Tom Krueger Region 5.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
SAMPLING Why sample? Practical consideration – limited budget, convenience, simplicity. Generalizability –representativeness, desire to establish the broadest.
Josh Collins, Ph.D. San Francisco Estuary Institute Aquatic Science Center A Vision of Watershed Monitoring and Assessment.
GBLWMP-SLUP Integration Meeting February 4-5, 2010 Sahtu Land Use Planning Board.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
1 1 The Project Description: Framing the CEQA Analysis Terry Rivasplata.
EVALUATING STREAM COMPENSATION PERFORMANCE: Overcoming the Data Deficit Through Standardized Study Design Kenton L. Sena (EPA VSFS Intern), Joe Morgan,
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
Restoration and Regulation Discussion
Restoration and Regulation Discussion
Coal Mining Activities
Coal Mining Activities
EPA Region 10 Alternate Test Procedures and Method Update Rule
Collecting and Interpreting Quantitative Data – Introduction (Part 1)
OECD good practices for setting up an RIA system Regional Capacity-Building Seminar on Regulatory Impact Assessment Istanbul, Turkey 20 November 2007.
Analysis of the notification of compensatory measures
Restoration and Regulation Discussion
Presentation transcript:

California Rapid Assessment Method for Wetlands (CRAM) Project and Ambient Assessments

Project vs. Ambient Assessment CRAM can be used:  Probabilistically to identify the overall condition in a wetland class within a particular region – ambient assessment.  To identify the range in condition within a wetland class (or multiple classes) within an area in which an action is proposed - project assessment.

 Sample Universe: A map of all the wetlands of one type within a given area  Sample Frame: A map of all the candidate AAs within the sample universe Key Definitions

Ambient Assessment…  A probabilistic survey conducted for wetlands in a specific wetland class.  Requires a “complete” map of all wetlands in the subject class on a watershed or other geographic basis.  Requires a sampling methodology that relates each sampled point to a wetland area for which the point represents the wetland condition (e.g., GRTS).

For Ambient Assessments of a Wetland Class:  The Sample Universe is a map of all wetlands in the subject category in a watershed or other landscape.  The Sample Frame is all candidate AAs within the universe from which the sample of AAs will be drawn.

Summary of Ambient Assessment  Ambient Universe - all the wetlands in a watershed or other landscape to which the assessment results are expected to pertain.  Ambient Sample Frame – all the candidate AAs within an ambient universe.  Ambient Sample Draw - fixed sample size; the draw accounts for the different inclusion probabilities of the AAs, which depend on the sizes of their encompassing wetlands.

Project Assessment…  A structured assessment of wetland condition used to support an application for an approval or permit, an environmental review, an alternatives analysis, a mitigation proposal, or any similar use or action.  An assessment conducted for monitoring such projects or elements thereof.  May be conducted by project applicants or by reviewing agencies.

For Project Assessments:  The Sample Universe is all of the wetlands of one type within the project boundary.  The Sample Frame is all candidate AAs within the universe from which the sample of AAs will be drawn.

Summary of Project Assessment  Project Universe - all wetlands in a given class in a project to which the assessment results are expected to pertain.  Project Sample Frame - all the candidate AAs within the project universe.  Project Sample Draw – requires that all AAs have the same inclusion probability; sample size is not fixed, but depends on the variability in wetland condition throughout the project.

Practical Considerations for Project Assessment  S ufficient sampling is required to cover the range of variability within the project (i.e., this may differ depending on whether a site is homogeneous or not).  The required number and placement of AAs can be determined by probabilistic methods (random sampling; stratification for complex sites, etc.), by Best Professional Judgement, or by negotiation.  The level of effort should be commensurate with impacts that may be associated with the project.

 Develop a Sample Frame for the target wetland including all possible AAs (here, a grid of 1 ha circles). Reject candidate AAs that fall mostly outside the target wetland.  Re-shape AAs that are partially outside the wetland (within acceptable size range) so that it fits entirely within the wetland.  If appropriate, stratify the wetland into separate groups (here, interior and edge), and assess separately.  Randomly select and sample 3 AAs from each group. Average the two most similar AA scores; if the 3 rd AA score differs by more than 10 points from the average score of the first two AAs, select and sample a 4 th AA. Continue until latest AA score is within 10 points of the average of all the previous AA scores. Project example: stratifying a large wetland area Interior AA – no riparian Edge AA – includes riparian

Project-Related Uses of CRAM  Sampling the full range of wetland condition at an impact site, which can assist with impact identification, avoidance, and minimization.  Identifying mitigation requirements.  Identifying reference conditions and reference sites for the project and mitigation sites.  Characterizing existing condition in aquatic resources proposed for enhancement or rehabilitation.  Assessing performance of compensatory mitigation projects.

Inappropriate Project Uses or Applications of CRAM  Jurisdictional Determinations  Focused species or threatened or endangered species monitoring  Evaluation of compliance with water quality objectives  Modifying the methodology  Multiplying, or weighting, scores  Summarizing CRAM scores

CRAM Technical Bulletin  Appropriate & Inappropriate Uses of CRAM  Specific Guidance for Assessment of Projects  Defining a Project Area and Appropriate Assessment Area  Use of CRAM to Detect Changes in Wetland Condition Over Time  Example Scenarios for CRAM Assessment of Projects  Submission of CRAM Scores  Interpretation of CRAM Scores

Regulatory Agency Update  USACE & RWQCB:  Peer-reviewed  Often requiring CRAM during the 404 permitting process, and as a compensatory monitoring tool (permit condition)  Increasingly required in the 401 permitting process  CDFW:  Has not begun utilizing for 1600 permits

Thank you