Lessons from Kathmandu Valley Earthquake Risk Management Project

Slides:



Advertisements
Similar presentations
A Guide to Localizing the Hyogo Framework for Action
Advertisements

Disaster Risk Reduction in Education Sector Lessons Learned 15 years experience of ADPC in Asia Presentation at the Special Event on DRR in Education.
17 June 2009 GP/DRR, Geneva UNCRD project School Earthquake Safety Initiative (SESI) in Asia and the Pacific Shoichi Ando Coordinator, Dr. Disaster Management.
Md. Anisur Rahman, Asian Disaster Preparedness Centre (ADPC)
Public Awareness strategies NSET-Nepal AUDMP Working Group Meeting, Bandung Shiva Bahadur Pradhanang Ramesh Guragain 20 March 2002.
Lesson Learned from AUDMP/ NSET-Nepal NSET-Nepal AUDMP Working Group Meeting, Bandung Shiva Bahadur Pradhanang Ramesh Guragain 21 March.
1 A review of Evaluation and Impact Assessment by DAC Heads of Information in 2006 Ida Mc Donnell Annual Meeting of DAC HoI Canberra May 2006.
Challenge of Bam Earthquake –
Living with Risk Preliminary version Geneva, July 2002 A major achievement of the ISDR Secretariat in the last six months 24 October 2002 IATF-6.
Risk Assessment and Mapping Experiences through DIPECHO in Central Asia Regional Consultative Meeting November 2009 Bishkek, Kyrgyz Republic.
1 18/02/ nd Regional Consultative Meeting for Disaster Risk Reduction in Central Asia Bishkek, November Adam Yao, ECHO, Head of Office for.
1 Bishkek November 17, Goulsara Pulatova RegionalCoordinator UNISDR Secretariat Office in Central Asia 2nd Regional Consultative.
National Agenda for CSO Capacity Development Yin Soriya, Ph.D.
Developments in Market Surveillance in Estonia 4 December 2003, Prague Signe Ratso Deputy Secretary General Ministry of Economic Affairs and Communications.
Capacity Building in Infant and Young Child Feeding in Emergencies Group discussion Bali, Indonesia.
Establishing Basic Parameters: Risk Assessment
WORLD CONGRESS ON DISASTER REDUCTION PRE-CONGRESS SUMMIT WORKSHOP AUGUST 19-22, 2001 WORLD CONGRESS MEETING AUGUST 26-30, 2002 REGIONAL FORUMS AND ACTIVITIES.
ASSESSMENT & PLANNING FOR POST-DISASTER RECOVERY OF COMMUNITY INFRASTRUCTURE United Nations Development Programme Bureau for Crisis Prevention & Recovery.
The Role of Levees in the National Flood Risk Management Program Pete Rabbon June 19, 2008 Hazards Caucus Alliance.
The Community Action Plan for Seismic Safety (CAPSS) Overview, Loss Estimates, and Policy Recommendations John Paxton Co-Chair, CAPSS Advisory Committee.
Workshop on Feasibility Study for Development of Comprehensive Strategies for Safer Housing against Earthquakes in Developing Countries National Society.
A A member of the U.N. Global Platform for Disaster Risk Reduction An international scientific organization dedicated to the reduction of disaster risk.
1Comprehensive Disaster Risk Management Framework The Role of Local Actors 111 Safer Cities Session 1 World Bank Institute Fouad Bendimerad, Ph.D., P.E.
Carbon Lite Cardiff A response to the challenges of climate change Julian Stedman September 2009.
New technologies and disaster information resources Part 2. The right information, at the right time, the right way.
SAFER CITIES MODEL. SAFER CITIES TOOLS SAFER CITIES TRAINING MANUAL AND TOOLKIT Overall development objective is to facilitate effective strategy development.
1 SEISMIC RISK ASSESSMENT Dr. Carlos E. Ventura Kate Thibert & Hugón Juárez García February 26 th, 2007.
Resiliency of Public Services in Social Sectors Kenichi Yokoyama, ADB Country Director, Nepal.
Lebanon Introduction Based on studies of its past disasters, Lebanon can be considered as a country vulnerable to earthquakes because of some.
IYCF activities 2014 in Nepal Dr Srijana Basnet Assistant professor, NEBROF member Department of Pediatrics Institute of Medicine.
Foster and sustain the environmental and economic well being of the coast by linking people, information, and technology. Center Mission Coastal Hazards.
Outline: Lecture 4 Risk Assessment I.The concepts of risk and hazard II.Shaking hazard of Afghanistan III.Seismic zone maps IV.Construction practice What.
Nepal Risk Reduction Consortium and HFA Platform.
Unit 1 Community Capabilities
Country Plan of Action NEPAL Prof. Prakash S. Shrestha President Nepal Breastfeeding Promotion Forum (NEBPROF)
23 rd September 2008 HFA Progress Report Disaster Risk Reduction in South Asia P.G.Dhar Chakrabarti Director SAARC Disaster Management Centre New Delhi.
Regional Task Force Hospitals and Health Facilities Safe from Disasters IAP meeting 13 August 2009 Incheon.
BUILDING A COMMUNITY OF PRACTICE. Question 1: What is the mission of our network? To share knowledge and experiences. To extract lessons to improve dialogue.
Session 271 Comparative Emergency Management Session 27 Slide Deck.
REGIONAL ANALYSIS ON DISASTER RISK REDUCTION EDUCATION IN THE ASIA PACIFIC REGION IN THE CONTEXT OF HFA PRIORITY 3 IMPLEMENTATION Bangkok, March 2009 Prepared.
Views from the Frontline A local perspective of progress towards implementation of the Hyogo Framework for Action
GRIP - Global Risk Identification Programme, UNDP Bureau for Crisis Prevention and Recovery, , Local Risk.
Part III: Tools for Risk Assessment RADIUS Tool - Simple Damage Estimation Software - Dr. Carlos Villacis.
1 Mid-Term Review of the Hyogo Framework for Action Roadmap to Disaster Risk Reduction in the Americas & HFA Mid-Term Review.
Inter-Ministerial and Inter-Agency Coordination in Post-Earthquake Reconstruction Cooperation Among Government Departments and Line Agencies N. Vinod Chandra.
The LOGICAL FRAMEWORK Scoping the Essential Elements of a Project Dr. Suchat Katima Mekong Institute.
Community and Health emergency Management Dr: Khawla Al-Hoti Family physician. Director of health services, Quriyat Willayt MRCGP,ARAB BOARD, Diploma in.
Overview of the RADIUS Tool - Simple Damage Estimation Software - Carlos Villacis, Ph.D.
Welcome to Save the Children’s Presentation on Household Economic and Food Security of Extreme Poor me to Save the Children’s Presentation on Household.
UNDP efforts towards microfinance development in Uzbekistan 9-11 November 2005 Almaty, Kazakhstan BUILDING SUSTAINABLE MICROFINANCE IN RBEC Community of.
Session V: Integration of Risk Information and Early Warnings in Emergency, Preparedness, Planning and Response Symposium on Multi-Hazard Early Warning.
Post-Georges Disaster Mitigation Post-Georges Disaster Mitigation in Antigua and Barbuda Funded by a special appropriation by the U.S. Congress to countries.
HFA Review Sri Lanka. Consultations 42 members of National Platform were consulted. Five groups appointed by members to evaluate the progress.
Environment and Disaster Planning Hari Srinivas, GDRC Rajib Shaw, Kyoto University Contents of the presentation: -What is the problem? -Precautionary Principles.
World Water Forum IV Civil Society Engagement in Kathmandu Water Supply Reforms Nepal Experience NGO Forum for Urban Water and Sanitation 19 th March 2006.
The Male’ Declaration Proposal for Phase 4 Implementation.
For a better built environment 1 Council for the Built Environment.
Increasing resilience of School students through SBDRR
WHAT CONTRIBUTES TO THE BUILDING OF RESILIENT COMMUNITIES?: INTEGRATION OF KNOWLEDGE, RISK PERCEPTION, AND AWARENESS OF SOCIAL VULNERABILITY Pamela McMullin-Messier.
SEA in New Zealand1 Developments on Two Converging Paths Martin Ward, Independent Advisor, New Zealand.
A coordinated approach to water in Europe Harro Riedstra, EWP.
UNDP HAITI Strengthening capacity, coordination & M&E for preparedness & response (and DRR)
The use of Knowledge Attitude Practice (K.A.P) Surveys in CBDRM projects Example in the Project: Capacity building for institutions and vulnerable communities.
THE NATIONAL CLIMATE CHANGE RESPONSE POLICY NATIONAL CLIMATE CHANGE RESPONSE POLICY CLIMATE CHANGE ADAPTATION The relevance of Adapting to Climate Change:
Preparation of Drought Vulnerability Assessment Study to Develop Iraq National Framework for Integrated Drought Risk Management (DRM) PAVING THE WAY FOR.
NEPAL RECOVERY TO RESILIENCE
Nepal’s Initiative on Climate Resilient WASH Programming
Community-based disaster risk management --Empowering communities and local governments through SFs/CDD operations A presentation by Saroj Kumar Jha Program.
Global Platform on Disaster Risk Reduction May 17th 2019
Presentation transcript:

Lessons from Kathmandu Valley Earthquake Risk Management Project AUDMP Working Group Meeting, Bandung Shiva Bahadur Pradhanang Ramesh Guragain 19 March 2002 NSET-Nepal www.nset.org.np

KVERMP/Project Performance Performance Indicators Base line Life of Project Target Project Achievement Comment on Progress Project Objective: Establishment of Sustainable Mechanisms for Earthquake Disaster Risk Reduction in Kathmandu Valley Number of Institutions None 10 Institutions 11 Institutions Municipalities have shown Interests Changes in thinking of different institutions Number of Earthquake Disaster Risk Reduction Plans 1 Plan 3 Plan KVERMP Action Plan has been prepared DP and ER Plan for Health Sector KV Plan prepared by JICA Amount of Funding Committed to Earthquake Risk Reduction Projects following the start of this Project $0 $500,000 $281,348.67 (This figure includes only the in-kind contribution to KVERMP from non-AUDMP sources OFDA WHO/SEARO GHI UNCRD JICA Objective Indicator No. 1: Number of institutions that have incorporated earthquake risk reduction as a permanent or significant part of their operations as a result of this project.

Methodology for Different Activities Items Base Line (Prior to Project) Project Achievement Remarks Methodology for hazard assessment Earthquake Hazard Map Existed for Nepal Simplified interpretative EQ hazard map prepared for KV based on 1934 EQ Simplified interpretative liquefaction susceptibility map for KV Use of Existing information No new research Methodology for loss estimates None used for KV 1934 Bihar-Nepal earthquake taken as scenario earthquake ATC-13/15 used for KV scenario earthquake (for MMI IX) and loss estimation made for critical facilities and casualty. Electricity damage map Telecommunication Water supply Road/Bridges Casualty estimated for empirical consideration Hospital hazard map created Found to very simple in the case of the lack of in-built data, building inventory Replicated under RADIUS in 9 cities Objective Indicator No. 1: Number of institutions that have incorporated earthquake risk reduction as a permanent or significant part of their operations as a result of this project.

Methodology for Different Activities Items Base Line (Prior to Project) Project Achievement Remarks Methodology for writing earthquake scenario None Loss estimation results translated into simple language understood by common man in the form of text (Target audience: common people, teacher, student, decision maker, municipal authority, policy maker) Found to be very strong tool for awareness raising Methodology for developing action plan for earthquake risk management None used for KV Interaction process for involving manager of critical facilities in developing doable action Replicated under RADIUS in 9 cities Objective Indicator No. 1: Number of institutions that have incorporated earthquake risk reduction as a permanent or significant part of their operations as a result of this project.

Methodology for Different Activities Items Base Line (Prior to Project) Project Achievement Remarks School Building Vulnerability Assessment None Vulnerability of 1100 buildings of 643 public schools assessed through workshops and subsequent survey by school teachers Survey questionnaire designed Analysis Vulnerability assessment of groups of school buildings Structural intervention for improving seismic performance of school buildings Based on the building typology, identified possible cost-effective retrofitting options for typical masonry and from buildings Masonry buildings: Corner stitching, Horizontal bands, Vertical splints, bracing of walls Frame buildings: Jacketing of columns, addition of shear walls etc. Objective Indicator No. 1: Number of institutions that have incorporated earthquake risk reduction as a permanent or significant part of their operations as a result of this project.

Methodology for Different Activities Items Base Line (Prior to Project) Project Achievement Remarks Implementation of retrofitting of school buildings (Development of SESP Concept) None Develop mechanism for implementation Structural intervention to school buildings Training to masons, teachers, students, parents etc. Replicated in Chamoli,Bandung by UNCRD Advocacy for building code implementation First path Building council act passed by parliament, council constituted Building code implementation process started Second path Worked with NBSM for developing building code as Nepal Standards Objective Indicator No. 1: Number of institutions that have incorporated earthquake risk reduction as a permanent or significant part of their operations as a result of this project.

Methodology for Different Activities Items Base Line (Prior to Project) Project Achievement Remarks Public awareness/ policy None ESD has become a sustained activity Minister MOST is the chairman of ESD national committee 28 members including NSET 4 ESDs completed successfully Wonderful target audience National meeting – policy makers / donors Symposium – professionals/decision makers Earthquake safety rally, exhibition – all Shake table demonstration – builders, technicians, house owners Street drama - children Objective Indicator No. 1: Number of institutions that have incorporated earthquake risk reduction as a permanent or significant part of their operations as a result of this project.

Methodology for Different Activities Items Base Line (Prior to Project) Project Achievement Remarks Institutional Development NSET as a ERM center in Nepal None Credible institution with mission/vision statements and strategic objectives Trusted by all (Govt., NGO, Donors) OFDA JICA UNCRD OCHA etc. Very wide national/international outreach of NSET Could implement JICA program “The Study on Earthquake Disaster Mitigation in The Kathmandu Valley, kingdom of Nepal” ADPC/AUDMP was the starting assistance Fund raising In kind/cash contribution from outside AUDMP funds amounted to >60% Objective Indicator No. 1: Number of institutions that have incorporated earthquake risk reduction as a permanent or significant part of their operations as a result of this project.

Ongoing Activities Implementation of APIP Start September 2000 – End August 2003 Non-structural Vulnerability Reduction Quantitative Qualitative Lectures and assessment work to some organizations SESP New donors like BFN, GHI and Others Awareness raising Publications Radio TV Articles in Newspapers

Lessons Learned Awareness raising became part of all project components Low-tech approach was optimal Emphasis on community level work is important SESP concept is very effective NGO status both helped and hindered project implementation Institutional development is a long-term process

Challenges Replication in Manpower Constraint Lack of Policies Kathmandu Valley, Outside Valley, Outside Nepal Manpower Constraint Lack of Policies Building Permit Process Earthquake Forum Problems Many Actors, No Work False Sense of Competition Institutional Problem Internal External

What Should We Continue Doing? Policy Work-shop (With ADPC Support) Training Impact Assessment Community Level Works Awareness Raising Video RADIUS Assessment for 58 Municipalities