MuTr HV Optimization RIKEN/RBRC Itaru Nakagawa 1
Goal Find out HV to achieve Noise RMS/MIP peak (N/S) = 1%. Gain can be similar to chambers, but noise distributions are unique from chamber to chamber. Historically MuTR has been operated with only three HV settings (St1=1875V, St2=1900V, St3=1925V) Vary HV channel by channel basis to set N/S ~ 1%. 2
Cosmic Data Taking HV Setting# Triggers -30 V2M Nominal (St1:1875V, St2:1900V, St3:1925V)3M +15V3M +30V3M +50V3M Dedicated Measurements : Dec.23 ~ Jan. 11 MuIDLL1 N1D||S1D trigger : 60Hz ~ 120Hz Work area: README for instruction Event Selection: 1.Peak Strip ADC of Cluster. 2.No track required. 3
North Arm 4
Station-1 Oct.1 Oct.2 Oct.3 Oct.4 Oct.5 Oct.6 Oct.7 Oct.8 Gap-1 Gap-2 Gap-3 5
Station-2 Oct.1 Oct.2 Oct.3 Oct.4 Oct.5 Oct.6 Oct.7 Oct.8 Gap-1 Gap-2 Gap-3 6
Station-3 Oct.1 Oct.2 Oct.3 Oct.4 Oct.5 Oct.6 Oct.7 Oct.8 Gap-1 Gap-2 7
MIP Peak Nominal HV oct1 oct2 oct3 oct4 oct5 oct6 oct7oct8 gap1gap2gap3 St-1 St-2 St-3 8
Pedestal RMS (North Station-1) 9
Plane Averaged Pedestal RMS [ch] oct1 oct2 oct3 oct4 oct5 oct6 oct7oct8 St-1 St-2 St-3 10
Noise RMS/MIP Nominal HV St-1 St-2 St-3 11
N/S.vs Operation Voltage Noise RMS / MIP Peak ADC [%] St-1 St-2 St-3 Nominal + Additional Voltage [V] Linear Fit nominal +15V +30V +50V -30V N/S : 2% -> 1% Needs additional 110V N/S : 2% -> 1% Needs additional 110V 12
N/S~1% Required Voltage : Nominal + ?V St-1 St-2 St-3 +50V limit St-2, St-3 planes are averaged over common HV chain 13
South Arm 14
Station-1 Oct.1 Oct.2 Oct.3 Oct.4 Oct.5 Oct.6 Oct.7 Oct.8 Gap-1 Gap-2 Gap-3 15
Station-2 Oct.1 Oct.2 Oct.3 Oct.4 Oct.5 Oct.6 Oct.7 Oct.8 Gap-1 Gap-2 Gap-3 16
Station-3 Oct.1 Oct.2 Oct.3 Oct.4 Oct.5 Oct.6 Oct.7 Oct.8 Gap-1 Gap-2 17
MIP Peak Nominal HV oct1 oct2 oct3 oct4 oct5 oct6 oct7oct8 gap1gap2gap3 St-1 St-2 St-3 18
Plane Averaged Pedestal RMS oct1 oct2 oct3 oct4 oct5 oct6 oct7oct8 St-1 St-2 St-3 19
Noise RMS/MIP Nominal HV St-1 St-2 St-3 20
N/S.vs Operation Voltage Noise RMS / MIP Peak ADC [%] St-1 St-2 St-3 Nominal + Additional Voltage [V] Linear Fit nominal +15V +30V +50V -30V 21
N/S~1% Suggested Voltage : Nominal + ?V St-1 St-2 St-3 22
HV Configuration File hvcontrol_MutrN(S) hvcontrol_MutrN(S) Copy & paste 23
Study From Run9 Run09Run11 DataBeamCosmic HV ScanNominal, +25V, +50V-30V, Nominal, +15V, +30V, +50V N/S1.5%1.0% 24
HV Set to be N/S ~ 1.5% (North) 25
Cosmic vs Beam (Absolute) 26
SN vs HV (North) nominal +25V +50V 27
Conclusion MuTr Gain.vs HV were evaluated using HV scan data with cosmic HVs are optimized to set N/S to be 1%. New HV will be configured soon. Will confirm N/S really comes as it desired with further data taking. Need to confirm with beam data as well. 28