MuTr HV Optimization RIKEN/RBRC Itaru Nakagawa 1.

Slides:



Advertisements
Similar presentations
Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.
Advertisements

Post Run13 MuTR/MuTrig Maintenance 1. Cathode Cable in mis-contact : South Station-1 Oct-5, Gap-2 2.
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Data analysis BTF 23 e 24 mag 05 T1 T2 500MeV electrons Repetition Rate 50 Hz Pulse Duration 1-10 ns Current/pulse 1 to 8 particles σ XY ~2mm Max Electronic.
November 3rd, 2006 CALICE-UK, Manchester - A.-M. Magnan - 1 Noise studies DESY + CERN TB overview Anne-Marie Magnan Imperial College London.
Micromegas studies using cosmic rays Franck Sabatié May 7th 2009 Saclay cosmic ray bench Data acquisition system and analysis tools MIP detection Position.
X5 TEST BEAM preliminary studies Outline  Voltage scan  PLL scan + Neighbour Strips  Sensor Uniformity  Comments  Special Trigger (Friday)
MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April GeV pp (2+3 weeks) GeV pp (1+6 weeks)?
MuTr/MuTrig Performance of Run13 RIKEN/RBRC Itaru Nakagawa 1.
ADTX Threshold Scan RIKEN/RBRC Itaru Nakagawa 1. Run13 ADTX Threshold Scan March 3, 2013 MUID1D HV=Run12 Nominal Setting MuTrig e-Log entry=#
Photodetector Timing Resolution Burle Micro-Channel Plate Photo Multiplier Tubes (MCP-PMTs) H. Wells Wulsin SLAC Group B Winter 2005.
MuTr Recapacitation RIKEN/RBRC Itaru Nakagawa 中川格 1.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* EMU Meeting University of Florida 01/09/2004.
29 June 2004Paul Dauncey1 ECAL Readout Tests Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, C. Fry, R. Halsall, M.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* EMU Meeting University of Florida 01/09/2004.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
South Arm FEE Performance Prior to Au run, all FEMs installed and working. Currently, 157 of 168 FEMs read out useful data. = 93.5% operational FEM losses:
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
Andrea Giammanco CMS Tracker Week April DS ROD Prototype: “final” optohybrids “final” CCUM integrated in the rod with new FEC_to_CCUM adapter (Guido.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
ACD calibrations Pedestals Measured from online script Measure PHA w/ HV off, no charge injection Use cyclic triggers ~ ADC counts, very narrow.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
Trigger Bias Study at Test Bench Data RIKEN/RBRC Itaru Nakagawa.
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
Andrew Glenn 4/21/02 Commissioning and Performance of the. Muon Identifier Andrew Glenn (University of Tennessee), for the PHENIX collaboration April APS.
Run11 MuTrig-FEE Summary RIKEN/RBRC Itaru Nakagawa 1.
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
MuTR/MuTrig Readiness for Run13 Itaru Nakagawa on Behalf of MuTrig/MuTr Group 1.
QGP France sept 2010Sanjoy Pal Performances of the tracking Chambers of the ALICE MUON Spectrometer 1.
Run13 MUID Hit Efficiency RIKEN/RBRC Itaru Nakagawa 1.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED News New LED scan and stability data for ECAL were.
Performance of the PHENIX Muon Identifier Introduction Calibration with cosmic rays Performance in Au+Au collisions Summary Hiroki Sato, Kyoto University.
Performance of PHENIX High Momentum Muon Trigger.
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
PERFORMANCE OF THE PHENIX SOUTH MUON ARM Kenneth F. Read Oak Ridge National Lab & University of Tennessee for the PHENIX Collaboration Quark Matter 2002.
FNAL Beam test results A. Zhang, V. Bhopatkar, M. Phipps, J. Twigger, M. Hohlmann HEP Group A, Florida Tech 2013/11/18.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
F Don Lincoln, Fermilab f Fermilab/Boeing Test Results for HiSTE-VI Don Lincoln Fermi National Accelerator Laboratory.
10/2/2002MJL - MuTr DC Report Muon Tracking Status South North.
Recap Clamp for MuTr Station-3 Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration Especially credit to: Tsutomu Mibe (KEK) Yoshinori Fukao.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
MuID Efficiency Study RIKEN/RBRC Itaru Nakagawa This analysis has been done by Sarah Caussin (ENSICAEN) 1.
MuTrig-FEE Install Status RIKEN/RBRC Itaru Nakagawa 1.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
SRS Calibration Part II: Dynamic Range, Signal/Noise, Pulse Shape and Timing Jitter + initial results from scan of FIT zigzag board Michael Phipps, Bob.
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
Possible Improvement of MUID Performance Itaru Nakagawa, Seyoung Han (RIKEN, Ewha/RIKEN)
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
Monitoring of cell to cell inhomogeneity and transfer into simulation M. Vander Donckt.
1 Methods of PSD energy calibration. 2 Dependence of energy resolution on many factors Constant term is essential only for energy measurement of single.
1 PMT Univ. of Tokyo Yasuko HISAMATSU ICEPP, The University of Tokyo MEG VRVS meeting Jan. 20th, 2004.
Preparation for Run10 RIKEN/RBRC Itaru Nakagawa. TLD badges (to be replaced every two weeks) Location of dosimeters in MuTr.S St.1 TK361 TK362 TK363 TK364.
EZDC spectra reconstruction and calibration
The Silicon Drift Detector of the ALICE Experiment
Panagiotis Kokkas Univ. of Ioannina
Detection of muons at 150 GeV/c with a CMS Preshower Prototype
Preliminary Performance of the L2 Chamber (Side A)
M. Alexeev on behalf of Torino TIGER Test Group
Pre-installation Tests of the LHCb Muon Chambers
Current status Minjung Kim.
11th Pisa meeting on advanced detectors
Current status Minjung Kim
Presentation transcript:

MuTr HV Optimization RIKEN/RBRC Itaru Nakagawa 1

Goal Find out HV to achieve Noise RMS/MIP peak (N/S) = 1%. Gain can be similar to chambers, but noise distributions are unique from chamber to chamber. Historically MuTR has been operated with only three HV settings (St1=1875V, St2=1900V, St3=1925V) Vary HV channel by channel basis to set N/S ~ 1%. 2

Cosmic Data Taking HV Setting# Triggers -30 V2M Nominal (St1:1875V, St2:1900V, St3:1925V)3M +15V3M +30V3M +50V3M Dedicated Measurements : Dec.23 ~ Jan. 11 MuIDLL1 N1D||S1D trigger : 60Hz ~ 120Hz Work area: README for instruction Event Selection: 1.Peak Strip ADC of Cluster. 2.No track required. 3

North Arm 4

Station-1 Oct.1 Oct.2 Oct.3 Oct.4 Oct.5 Oct.6 Oct.7 Oct.8 Gap-1 Gap-2 Gap-3 5

Station-2 Oct.1 Oct.2 Oct.3 Oct.4 Oct.5 Oct.6 Oct.7 Oct.8 Gap-1 Gap-2 Gap-3 6

Station-3 Oct.1 Oct.2 Oct.3 Oct.4 Oct.5 Oct.6 Oct.7 Oct.8 Gap-1 Gap-2 7

MIP Peak Nominal HV oct1 oct2 oct3 oct4 oct5 oct6 oct7oct8 gap1gap2gap3 St-1 St-2 St-3 8

Pedestal RMS (North Station-1) 9

Plane Averaged Pedestal RMS [ch] oct1 oct2 oct3 oct4 oct5 oct6 oct7oct8 St-1 St-2 St-3 10

Noise RMS/MIP Nominal HV St-1 St-2 St-3 11

N/S.vs Operation Voltage Noise RMS / MIP Peak ADC [%] St-1 St-2 St-3 Nominal + Additional Voltage [V] Linear Fit nominal +15V +30V +50V -30V N/S : 2% -> 1% Needs additional 110V N/S : 2% -> 1% Needs additional 110V 12

N/S~1% Required Voltage : Nominal + ?V St-1 St-2 St-3 +50V limit St-2, St-3 planes are averaged over common HV chain 13

South Arm 14

Station-1 Oct.1 Oct.2 Oct.3 Oct.4 Oct.5 Oct.6 Oct.7 Oct.8 Gap-1 Gap-2 Gap-3 15

Station-2 Oct.1 Oct.2 Oct.3 Oct.4 Oct.5 Oct.6 Oct.7 Oct.8 Gap-1 Gap-2 Gap-3 16

Station-3 Oct.1 Oct.2 Oct.3 Oct.4 Oct.5 Oct.6 Oct.7 Oct.8 Gap-1 Gap-2 17

MIP Peak Nominal HV oct1 oct2 oct3 oct4 oct5 oct6 oct7oct8 gap1gap2gap3 St-1 St-2 St-3 18

Plane Averaged Pedestal RMS oct1 oct2 oct3 oct4 oct5 oct6 oct7oct8 St-1 St-2 St-3 19

Noise RMS/MIP Nominal HV St-1 St-2 St-3 20

N/S.vs Operation Voltage Noise RMS / MIP Peak ADC [%] St-1 St-2 St-3 Nominal + Additional Voltage [V] Linear Fit nominal +15V +30V +50V -30V 21

N/S~1% Suggested Voltage : Nominal + ?V St-1 St-2 St-3 22

HV Configuration File hvcontrol_MutrN(S) hvcontrol_MutrN(S) Copy & paste 23

Study From Run9 Run09Run11 DataBeamCosmic HV ScanNominal, +25V, +50V-30V, Nominal, +15V, +30V, +50V N/S1.5%1.0% 24

HV Set to be N/S ~ 1.5% (North) 25

Cosmic vs Beam (Absolute) 26

SN vs HV (North) nominal +25V +50V 27

Conclusion MuTr Gain.vs HV were evaluated using HV scan data with cosmic HVs are optimized to set N/S to be 1%. New HV will be configured soon. Will confirm N/S really comes as it desired with further data taking. Need to confirm with beam data as well. 28