GLAST LAT ProjectMonthly Status Review - ISOC, 1 September 2005 1 GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
Advertisements

1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status June 6, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
GLAST LAT ProjectMonthly Status Meeting Jan 26, Project Status January 26, 2006 Gamma-ray Large Area Space Telescope Lowell A. Klaisner Project.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 71 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Instrument Science.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.1 Ground Operations Software 1 Gamma-ray Large Area Space Telescope.
GLAST LAT ISOCMonthly Status Review - ISOC, 1 August GLAST Large Area Telescope Instrument Science Operations Center Monthly Status Review 1 August.
GLAST LAT Instrument GLAST Monthly Mission Review October 29, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 29, 2007 Ken.
GLAST LAT ProjectLAT Operations Planning, 23 March GLAST Large Area Telescope LAT Operations Planning 23 March 2005 Rob Cameron
GLAST LAT Instrument GLAST Monthly Mission Review October 5, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 5, 2007 Ken Fouts.
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
GLAST Large Area Telescope Instrument Flight Software F2F Meeting March 17, 2005 Jeff Fisher FSW Manager Stanford Linear Accelerator Center Gamma-ray Large.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.
RFA 18 – Automation of Operations Software Specific Request –Specify plans and requirements for automation of operations software, and describe the software.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review Project Status Overview July 12, 2007 Neil Johnson.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
Section 15-1GLAST Ground System Design Review August 18&19, 2004 ISOC Organization ISOC Manager R Cameron Commanding, H&S Timeline Planning Command Generation.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 3 LOF Operations Concept 1 Gamma-ray Large Area Space Telescope GLAST.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project28 March 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project LAT Monthly Apr SAS 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope WBS 4.1.D SAS LAT Monthly Managerfest.
LAT ISOCDOE Status Review, 12 Oct GLAST Large Area Telescope LAT Instrument Science Operations Center Rob Cameron Stanford Linear Accelerator Center.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Telecommand and Telemetry Data Dictionary Services Sergio.
March 2004 At A Glance ITOS is a highly configurable low-cost control and monitoring system. Benefits Extreme low cost Database driven - ITOS software.
System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
Release & Deployment ITIL Version 3
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 NRL-SLAC Networking LAT Environmental.
GLAST LAT ProjectT&C Database Management, 1 July GLAST Large Area Telescope T&C Database Management 1 July 2005 Bryson Lee
GLAST Science Support CenterAugust 9, 2004 Users’ Committee Meeting GSSC USER SUPPORT David Band – GSSC.
GLAST Science Support CenterNovember, 2005 GSSC User Committee Meeting Tools for Mission and Observation Planning Robin Corbet, GSSC
Quick Recap Monitoring and Controlling. Lesson 11: Monitoring and Controlling Project Work Topic 11A: Identify the Monitor and Control Project Work Process.
LAT ISOCISOC Review, 15 February GLAST Large Area Telescope Instrument Science Operations Center ISOC Staffing and Costs Rob Cameron Stanford Linear.
GLAST LAT ProjectMonthly Status Review - ISOC, 3 Nov GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status Review.
GLAST Mission - LAT ProjectDOE/NASA Review March 31, 2004 Section ISOC 1 GLAST Large Area Telescope: ISOC Subsystems WBS: 4.1.B David Lung Stanford Linear.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
LAT ISOCISOC Review, 15 February GLAST Large Area Telescope Instrument Science Operations Center Commanding, Health and Safety Rob Cameron Stanford.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
GLAST Science Support CenterAugust 10, 2004 Users’ Committee Meeting The Project Data Management Plan David Band – GSSC.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GLAST Large Area Telescope – ISOC Overview and StatusDOE Annual Review, 13 June GLAST Large Area Telescope Instrument Science Operations Center.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR FSW Overview Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
GLAST Science Support Center May 8, 2006 GUC Meeting AI#28. SAE Release Schedule David Band (GSSC/JCA-UMBC) Julie McEnery (GSFC)
I&T&C Organization Chart
Detlef Koschny Research and Scientific Support Department ESA/ESTEC
GLAST Large Area Telescope:
Current SOC-Ground System Integration Schedule (Jan )
GLAST Large Area Telescope
GLAST Large Area Telescope
GLAST Large Area Telescope
GLAST Large Area Telescope
GLAST Large Area Telescope
LAT Operations Scenario Subsystem Meetings
GLAST Large Area Telescope: I&T Test Readiness Review
GLAST Large Area Telescope
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope:
LAT Environmental Test Pathfinder F2F NRL-SLAC Networking Update
Presentation transcript:

GLAST LAT ProjectMonthly Status Review - ISOC, 1 September GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status Review 1 September 2005 Rob Cameron Gamma-ray Large Area Space Telescope

GLAST LAT ProjectMonthly Status Review - ISOC, 1 September ISOC Management  ISOC Operations Facility –Met with SLAC management to review plans for Ops facility in Building 84, near existing Dataflow Lab –Preparing SLAC infrastructure proposal for construction of operations facility –ISOC staff will be relocated to Building 84, coincident with KIPAC move to new building –To be completed in 2006  Coordination activities –GLAST/SCCS meetings Managing ITAR-controlled data and computers Offline processing – GLAST/BaBar resource sharing –Increasing I&T coordination Fastcopy data transport to SLAC during NRL, SASS tests LAT Configuration tracking and control –Operations Planning meetings User review of FSW

GLAST LAT ProjectMonthly Status Review - ISOC, 1 September ISOC Ground Test Preparations  Continued Ground Readiness Test Team (GRTT) participation with GSFC and other ground elements –Preliminary test objectives and procedures agreed to for GRT3 and GRT4 –Dates of GRT3 and GRT4 swapped to give more time to prepare for GRT3 (a much larger test for ground elements)  Next GRT - GRT4 on 25 Oct 05 –Regression test for ISOC - no new functionality –New SW release (# 1.1) to be made ~ 4 wks before test No new functions to be tested, but incorporate several improvements since GRT2 Will verify before test that functions needed for GRT4 still work in release 1.1

GLAST LAT ProjectMonthly Status Review - ISOC, 1 September ISOC Ground Test Preparations – GRT 3 on 6 Dec 05  New ISOC functions in GRT3 –Ingest new data products from MOC into ISOC database New orbital data products Integrated Science Timeline –Trending data ingest and display/plot –Logging Log receipt/transmission of data products Limit exceeded messages Operator comments Includes database and web interface –Science Data Processing Ingest L0  Process into L1 data  Package into ICD-compliant L1 product  Send to GSSC Provided small sample of L0 data to PSS Still need to create large L0 sample to use in GRT3 –Cover typical pass size (~ 2GByte/pass) –With overlap between passes –Needed at least 1 month before test (by early Nov)  SW release 1.2 to be completed 9 Nov 05 (~4 weeks before GRT3) –New functions to be acceptance tested locally before release –Began acceptance test preparations for release 1.2 Enhanced requirements database to support new tests Identifying requirements to include in 1.2

GLAST LAT ProjectMonthly Status Review - ISOC, 1 September ISOC Ground Test Preparations – Ground System Discrepancy Review Board  GSDRB began in August –Includes all ground elements –Primary focus is ground system problems identified in GRTs, ETEs, Mission Sims –All problems addressed by GSDRB tracked via SOARS (GSFC discrepancy reporting tool) –Met twice in August Agreed on roles and procedures of GSDRB Dispositioned all pending SOARS reports –Generally to meet once/month or more often as needed –Next meeting 12 Sept 05

GLAST LAT ProjectMonthly Status Review - ISOC, 1 September Software Development  Next release planned for 22 September 2005 –Interim release to bring production installation up to head of development tree (release # 1.1) –Adds retrieval of CCSDS packet groups from raw archive – required for science data processing in GRT3.  Began integrating ISOC code modules into LICOS framework for I&T support. –CCSDS packet archive file object used for recording telemetry data from the VSC. –ISOC raw-archive implementation used for data-storage organization and retrieval. –Flight-like packaging of data and use of FASTCopy for transfers from I&T equipment to SLAC Central Unix.

GLAST LAT ProjectMonthly Status Review - ISOC, 1 September Software Development (cont’d.)  I&T support (cont’d) –Modified FASTCopy-automation software and database to operate on non-Oracle RDBMS (PostgreSQL) for use on I&T mobile rack. –Packaged ISOC software and required external packages for automated installation on mobile rack.

GLAST LAT ProjectMonthly Status Review - ISOC, 1 September GOWG/GIMGOM Activity  Ops Data Products ICD issues –Handling of priority and normal command requests by GSSC –Change to project database delivery to ISOC - will be delivered as a directory of “tarred” files, which is then “tarred” with a manifest –Reviewed and approved new Science Timeline format –Deleted Spacecraft Timeline because information is provided to ISOC through other means and the timeline itself is not used by the MOC –Discussed revising As-Flown Timeline to ensure it contains useful information  Finalized agenda for the Sept Ops TIM

GLAST LAT ProjectMonthly Status Review - ISOC, 1 September GOWG/GIMGOM Activity (cont.)  Aura Mission Planning tool (used on Aura project) –MOC evaluating use of tool (with modifications) during L&EO and on-orbit ops –Pass plan used for routine operations with ISOC command requests handled through change requests – would still have GSSC approval of requests  Relative Time Sequence (RTS) allocation - 35 slots with 29 for S/C and 6 allocated for use by LAT and GBM  Operation Agreements - interface information between the ground elements that does not belong in ICD  Confirmation of PROC requests by GSSC –GSSC confirms PROC requests (real time command requests) from ISOC are valid but does not validate PROC contents –List of PROC requests to be added to ICD –Use of rejection messages will be described in MOA

GLAST LAT ProjectMonthly Status Review - ISOC, 1 September ISOC Database Activities  LAT Command and Telemetry database –Updating LAT T&C DB for housekeeping trending, as updates occur in conjunction with FSW releases –Working with I&T on control of telemetry limits and cal curves to be shared between LICOS for (SLAC and NRL testing) and dbx files (for SASS testing and flight ops).

GLAST LAT ProjectMonthly Status Review - ISOC, 1 September LAT Configuration Control and Tracking  Second TIM held on 15 August –Operations concept review –LAT configuration data flow through existing and proposed tools –MOOT/MOOD (config management tools and database) design progress –LICOS interfaces –Instrument turn-on sequence –Agenda:  First draft of all MOOD database tables nearing completion –Next: make test database to operate with FSW tools

GLAST LAT ProjectMonthly Status Review - ISOC, 1 September Issues and Concerns  Handling ITAR-restricted data –Spacecraft telemetry (which contains 96 LAT analog telemetry points + bilevel telemetry) –Optional approaches ITAR-compliant restricted network for GLAST data, firewalled from SCCS servers, filesystems and databases Use ITOS capabilities at MOC to extract and deliver LAT- specific telemetry as sequential prints. ICD change required.

GLAST LAT ProjectMonthly Status Review - ISOC, 1 September Future Activities  Ops TIM – September 2005  GRT4 – 25 October 2005  GRT3 – 6 December 2005  MOR – March 2006

GLAST LAT ProjectMonthly Status Review - ISOC, 1 September Level 3 Milestone Count

GLAST LAT ProjectMonthly Status Review - ISOC, 1 September Level 3 Milestone List

GLAST LAT ProjectMonthly Status Review - ISOC, 1 September Milestone Variance Explanation  Schedule Impact  Cost Impact  Corrective Action –None Required

GLAST LAT ProjectMonthly Status Review - ISOC, 1 September Cost Report