Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
P.Fabbricatore Sezione di Genova Joint Belle II & SuperB Background Meeting SuperB IR details:magnets SUPERB IR DETAILS: SC MAGNETS P.Fabbricatore INFN.
Cold Powering of the HL-LHC magnet system WP6 Motivation Work Package description Tasks Partners & resources Amalia Ballarino HL-LHC Design Study – 3 rd.
Interim Design Amy Eckerle Andrew Whittington Philip Witherspoon Team 16.
MECHANISM OF HEAT TRANSFER Mode of Heat transfer Conduction Convection
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
1 Configuration Development for HIF Final Focus Superconducting Quadrupole Array HIF Final Focus Meeting July 2, 2002 Tom Brown Chang Jun Phil Heitzenroeder.
1 The Genoa Tracker Solenoids and their Contribution toward a New Design Michael A. Green Lawrence Berkeley National Laboratory and Pasquale Fabbricatore.
Superconducting Solenoids for COMET KEK Cryogenics Center, Osaka Univ. Kuno-san’s Team, J-PARC MLF Muon Group.
Stellarator magnets L. Bromberg J.H. Schultz MIT Plasma Science and Fusion Center ARIES meeting March 8-9, 2004.
Superconductivity Practical Days at CERN
Superconducting Large Bore Sextupole for ILC
MCTF Alexander Zlobin MUTAC Meeting 8-10 April MCTF Magnet and HTS Conductor R&D.
Superconducting Links for accelerator technology A.Ballarino CERN, TE-MSC-SCD Eucard’13, CERN With contributions from the SCD SL Team (B.Bordini, S.Giannelli),
11 Oct , 2013 by Video LBNL Cable Experience for HiLumi HiLumi LARP/LHC Strand and Cable Internal Review Oct , 2013 by Video D.R. Dietderich,
Engineering Department ENEN 16/08/2013 LR - BBC Pre-Study 1 STATUS of BBC DESIGN and ENGINEERING : PRELIMINARY RESULTS G. MAITREJEAN, L. GENTINI.
1 A Joint Proposal for US-Japan Cooperation Program Proposal to JSPS US-Japan collaboration fund R&D of superconducting magnet technology for high intensity.
LBNL Test Cryostat Preliminary Design Review Tuning – Field Correction Soren Prestemon, Diego Arbelaez, Heng Pan, Scott Myers, Taekyung Ki.
Magnet designs for Super-FRS and CR
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
Beam-Wall Interaction in the LHC Liner: a former PhD student experience A. Mostacci La Sapienza, University of Rome Francesco.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
1 WANG,Li/SINAP WANG Li, WANG ShuHua, LIU YiYong, SUN Sen, HU Xiao, YIN LiXin Shanghai Institute of Applied Physics, CAS, Shanghai , China Shanghai.
Preliminary Design for the Coupling Coil Cryostat in MICE
Review-LHC Interaction Regions - Upgrade Phase I Amalia Ballarino, 31 st July 2008 Cold Powering Options Conceptual Design Review of the LHC Interaction.
19./20. September 2007 Current leads for FAIR Cryogenic Expert Meeting 19./20. September 2007 Birgit Weckenmann.
R. Bonomi R. Kleindienst J. Munilla Lopez M. Chaibi E. Rogez CERN Accelerator School, Erice 2013 CASE STUDY 1: Group 1C Nb 3 Sn Quadrupole Magnet.
Superconducting Quadrupoles inside the HERA Experiments M. Bieler, DESY, LHC LUMI 05 Workshop, Arcidosso, September The HERA Interaction Region.
GROUP C – Case study no.4 Dr. Nadezda BAGRETS (Karlsruhe Institute of Technology) Dr. Andrea CORNACCHINI (CERN EN Dept.) Mr. Miguel FERNANDES (CERN BE.
Task 5: High-Tc Superconducting Link Status Update Meeting Eucard - WP7 Collaboration Meeting (video) A. Ballarino, G. Hurte, G. Willering (CERN) M. Tropeano,
FET-OPEN proposal for a HTS fast cycled magnet for Energy Efficiency and Operational Flexibility Motivations SC magnets are the choice of reference to.
5 th Joint Hi-Lumi LHC-LARP Annual Meeting 2015 SC Link Protection A.Ballarino 28/10/2015.
16 T Dipole Design Options: Input Parameters and Evaluation Criteria F. Toral - CIEMAT CIEMAT-VC, Sept. 4th, 2015.
Stellarator magnet options. Electrical/winding issues Elegant solution for ARIES-AT does not extrapolate well for ARIES-CS –High Temperature Superconductor.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
A. BallarinoLASA, Milano,18/09/2012 High-Tc Superconducting Link Status of Task 7.5 FP7 Meeting at LASA-Milano A.Ballarino, CERN for the Task 7.5 Collaboration.
A. BallarinoEucard, 8 th WP7 HFM Annual MeetingWarsaw,24/04/2012 High-Tc Superconducting Link Status of Task 7.5 Eucard 2012, 8 th WP7 HFM Collaboration.
HTS for Upgrades: overview of test requirements Amalia Ballarino, CERN Review of superconductors and magnet laboratories, A. Ballarino.
5 th Joint Hi-Lumi LHC-LARP Annual Meeting 2015 Cold Powering New Baseline A.Ballarino 27/10/2015.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
A. BallarinoEucard MeetingCERN,20/03/2013 High-Tc Superconducting Links for the LHC WP 7 – Task 5 A.Ballarino, TE-MSC, CERN Task 5 participants : A. Ballarino,
The integration of 420 m detectors into the LHC
Prospects for the use of HTS in high field magnets for future accelerator facilities A. Ballarino CERN, Geneva, Switzerland.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
AT-VAC SPC Nicolaas KOS Beam Screens for Inner Triplet Magnets LHC Upgrade Phase 1 Nicolaas KOS  LHC Upgrade phase 1  Inner triplet BS Requirements.
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova The air core magnets.
J. Polinski, B. Baudouy -The NED heat transfer program at CEA CEA Saclay, January 11th NED heat transfer program at CEA NED heat transfer program.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
Henryk Piekarz SC Magnets at Fermilab HTS Cable Test for a Fast-Cycling Accelerator Dipole Magnet E4R Test Goals and Arrangement Review September 10, 2009.
Thermal screen of the cryostat Presented by Evgeny Koshurnikov, GSI, Darmstadt September 8, 2015 Joint Institute for Nuclear Research (Dubna)
FNAL Workshop, July 19, 2007 ILC Main Linac Superconducting Quadrupole V.Kashikhin 1 ILC Main Linac Superconducting Quadrupole (ILC HGQ1) V. Kashikhin.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
HTS and LTS Magnet Design and Prototyping for RAON
Task 5: High-Tc superconducting link Summary of work-package
HO correctors update Massimo Sorbi and Marco Statera
HFM Test Station Main Cryostat
Yury Ivanyushenkov for the UK heLiCal Collaboration
D2 Status The contract for the construction of the short model
AEGIS Magnet System.
Agenda 9:00  - Welcome ASG speaker 9:10 -  Introduction -       P.Fabbricatore 9:25 - The D2   magnets in HL-LHC   -  E. Todesco.
CERN Conductor and Cable Development for the 11T Dipole
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
Challenges for FCC-ee MDI mechanical design
I. Bogdanov, S. Kozub, V. Pokrovsky, L. Shirshov,
Preliminary study of HTS option for CEPC detector magnet
P.Fabbricatore & S.Farinon
The superconducting solenoids for the Super Charm-Tau Factory detector
Presentation transcript:

Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008

Use of HTS wire for the correction of the long-range beam-beam effect in the LHC Requirements: -The HTS wire shall be able to transport  80 A m*, in dc mode, at a “convenient” temperature; -The HTS wire will be integrated between D2 and D1, both sides of IP1 and IP5, where at the moment warm beam pipes are used. The system shall provide the cryogenic conditions required for the operation of the wire in a compact and cost-effective set-up; - The design of the HTS wire and associated electrical devices (current leads) shall be such as to ensure optimized cryogenic and electrical performances and reliable operation *J. P. Koutchouk, Correction of the long range beam-beam effect in the LHC using electro-magnetic lenses, Proceedings of PAC 2001, Chicago Care HHH Working meeting, 28 August 2008, CERN LHC beam-beam effects and beam-beam interaction A. Ballarino

HTS conductors BSCCO 2223 (Tc=110 K) tape and YBCO 123 tape (Tc=95 K). Typical Ic at 77 K in self-field of A, for a tape of about 4 mm width and mm thickness. They are both delivered as fully reacted conductors BSCCO 2223 tape: multi-filamentary HTS filaments (f  30 %) in a Ag alloy matrix (PIT) YBCO 123 tape: thin (1-3  m) superconducting layer on a metallic substrate BSCCO 2212 wire (Tc=85 K). Multi-filamentary HTS filaments in a Ag alloy matrix. It is suitable mainly for applications that use the wind-and-react technology (T<20 K and high fields) MgB 2 tape and wire (Tc=39 K) The “ex-situ” PIT conductor is delivered fully reacted and can be used with the react and wind technology For the present application the round wire is the preferred geometry. In view of the weak mechanical properties of BSCCO 2212 when used in a reacted state, MgB 2 is the preferred conductor Care HHH Working meeting, 28 August 2008, CERN LHC beam-beam effects and beam-beam interaction A. Ballarino

Ic (A) B (T) Measurements performed by Columbus in July 2008 Ic(24 K, 0.4T)=436 A. J ce =357 A/mm 2 Measured at CERN an Ic  800 A (4.2 K, 1.5 T) Ex-situ, 1.1 mm  MgB 2 wire (Columbus) MgB 2 conductor: electrical properties Rb min  100 R wire Care HHH Working meeting, 28 August 2008, CERN LHC beam-beam effects and beam-beam interaction A. Ballarino

Cryostat around cold beam pipe Care HHH Working meeting, 28 August 2008, CERN LHC beam-beam effects and beam-beam interaction A. Ballarino

Cryomech, K, 8 20 K- 0 8 K Two-stage Pulse Tube cryocooler Care HHH Working Meeting, 28 August 2008, CERN LHC beam-beam effects and beam-beam interaction A. Ballarino

Two-stage Pulse Tube cryocooler A. Ballarino Care HHH Working Meeting, 28 August 2008, CERN LHC beam-beam effects and beam-beam interaction

Conductor support structure – cross-section 28 mm 9 mm Beam pipe (Cu) (I.D. ~150 mm) EB weld SS tube (O.D. ~2 mm) braze Care HHH Working meeting, 28 August 2008, CERN LHC beam-beam effects and beam-beam interaction A. Ballarino

Conductor support structure – connection Beam pipe – 15 K Thermal shield – 80 K Current lead MgB 2 wire in stainless steel tube – 15 K

-The current leads and the HTS wire are in the technical vacuum insulation of the cryostat -The HTS wire is electrically insulated and fitted inside the pre-shaped stainless steel pipe. The unit is positioned inside the beam pipe, welded and electrically connected to the cold end of the leads -The separation between the technical vacuum of the cryostat and the beam pipe is assured by welds -The heat sinks for the current leads are respectively on the thermal screen (T  80 K, 3.6 W/lead at 80 A), and on the outer wall of the beam pipe (T  20 K, 1 W/lead at 80 A) -The current leads have a design similar to that of the leads powering the LHC dipole corrector circuits Care HHH Working meeting, 28 August 2008, CERN LHC beam-beam effects and beam-beam interaction A. Ballarino

Care HHH Working meeting, 28 August 2008, CERN LHC beam-beam effects and beam-beam interaction A. Ballarino Current leads for the 60 A and 120 A LHC dipole correctors There are about 2000 conduction-cooled current leads in the LHC machine. They are incorporated in the SSSs for the powering of the 60 A and 120 A dipole corrector magnets. They are thermalized in the cryostat vacuum insulation against the thermal shield (50-75 K) and on the 5-20 K line C I.

-The resistivity of copper (RRR=120) at 20 K is  1.3   m – about 100 times lower than at room temperature -A copper wire (RRR=120) of about 0.9 mm 2 cross section (  1 mm) would dissipate about 1 W when transporting 80 A in dc mode at 20 K -At this stage, it may be interesting to consider also the copper wire option (the cryostat, the integration and assembly procedures, and the size of the stainless steel tube would not change –the MgB 2 conductor has a diameter of 1.1 mm) Care HHH Working meeting, 28 August 2008, CERN LHC beam-beam effects and beam-beam interaction A. Ballarino

Open points -Heat losses from the beam ? In the present proposal, the MgB 2 conductor operates with a temperature margin of about 10 K -Radiation in the area where the MgB2 is integrated ? The radiation resistance properties of MgB2 seems to be good – similar to Nb 3 Sn. Neutron irradiation tests were done at very high fluences (up to 3.9·10 19 n·cm -2, INFM and University of Genova). Up to fluences of 1·10 18 n·cm -2 no degradation of Tc was observed Care HHH Working meeting, 28 August 2008, CERN LHC beam-beam effects and beam-beam interaction A. Ballarino

Conclusions -A preliminary study shows that the use and implementation of an HTS wire for the correction of the long range beam-beam effect is feasible -The preferred HTS superconductor is MgB 2 in the form of wire – BSCCO 2212 and Cu can at this stage also be considered. The final choice of the conductor will not have an impact on the system design -The electrical and mechanical properties of MgB 2 largely satisfy the requirements for this specific application. A unit length of 100 meters of this wire will be delivered to CERN in October 2008 for a different application -Detailed drawings and some additional calculations should be done to finalize the present proposal Care HHH Working meeting, 28 August 2008, CERN LHC beam-beam effects and beam-beam interaction A. Ballarino