30-31 March 2005 Workshop "IMS over Fixed Access" - Washington 1 TISPAN_NGN Project plan Martin Niekus Alain Sultan

Slides:



Advertisements
Similar presentations
Diameter Bulk Signaling draft-liebsch-dime-diameter-bulksig-00.txt M. Liebsch, G. Punz IETF81, Quebec Diameter Maintenance and Extensions (DIME) WG 28.
Advertisements

SEM10-04 Initiation of a Work Item ETSI Seminar © ETSI All rights reserved.
GSC: Standardization Advancing Global Communications ITU-T Status Report on standardization of Networked RFID P.A. Probst/Chairman of ITU-T SG16 SOURCE:ITU-T.
CASDA Project Management A presentation to the CASDA Preliminary Design Review IM&T / CASS Dan Miller | CASDA Project Manager 11 March 2014.
Page 1 Norikazu - Nick Yamasaki KDDI Corporation Chair, TSG-S Upcoming Services and Systems Aspects for 3GPP2: 3GPP2 Future Directions and IMT-Advanced.
22-23 June 2004TISPAN-3GPP Workshop - Sophia-Antipolis 1 TISPAN NGN Architecture Overview Richard Brennan pulver.com, WG2 Chair
GSTC Report to GSC-9 Plenary Presented by Dr Ki-Shik Park - ETRI 1GSC-9, Seoul SOURCE:ACIF TITLE: AGENDA ITEM: CONTACT:Ron Box, GTSC Rapporteur GSC9-018.
Fixed Mobile Convergence T Research Seminar on Telecommunications Business Johanna Heinonen.
© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
REQ WG Reuse of underlying networks, 3GPP
REQ WG Reuse of underlying networks, 3GPP
Release & Deployment ITIL Version 3
DOCUMENT #:GSC15-PLEN-08 FOR:Presentation SOURCE:ISACC AGENDA ITEM:Opening Plenary (4.5) CONTACT(S):Jim MacFie ISACC Activities Since GSC-14 Jim MacFie.
World Class Standards Update on NGN Standards ETSI TISPAN Sonia Compans ETSI Technical Officer February 2009.
Report of ETSI NGN IPTV activities Rainer Münch, TISPAN Chairman Presenter: Ian Spiers DOCUMENT #:GSC13-PLEN-56 FOR:Presentation SOURCE:Rainer Münch, Ian.
© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
ATIS & TISPAN JOINT MEETING ON NGN Washington D.C., 1 April 2005 MEETING SUMMARY Draft v2 (4 April 2005) Based on Notes from David Boswarthick (ETSI),
22-23 June 2004TISPAN-3GPP Workshop - Sophia-Antipolis 1 Joint 3GPP & TISPAN Workshop on NGN-IMS - NGN-IMS issues handling - Alain Le Roux (France Telecom),
SG-13 / SSG Information Sharing Session Geneva - 05 November 2002 Overview of Q.6/SSG: Harmonization of evolving IMT-2000 systems Rapporteur: Bruce Pettitt.
NGN Management Focus Group 2 November 2004 Dave Sidor Interim Chairman Nortel Networks Tel Fax
NGN INTERCONNECT WORKING GROUP 4 April 2005 Update on the TSG Project Plan and Technical Work Paul Griffin – Network Architect, Energis Nick Ireland –
World Class Standards WG8 presentation of current Subscription Management Activities TISPAN WG8 – 3GPP SA#5 Joint meeting Sophia Antipolis, May14th - 15.
Resource Management Working Group SSS Quarterly Meeting November 28, 2001 Dallas, Tx.
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
Jun Li DHCP Option for Access Network Information draft-lijun-dhc-clf-nass-option-01.
CP-a Emergency call stage 2 requirements - A presentation of the requirements from 3GPP TS Keith Drage.
World Class Standards WG8 Specification Guidelines TISPAN WG8 – 3GPP SA#5 Joint meeting Sophia Antipolis, May14 th - 15 th 2007 Source: Michael Geipl Deutsche.
Recommendations for transfer from TISPAN to 3GPP SP For information Source: Goran Engstrom: TISPAN WG1 chairman Stephen Hayes: 3GPP SA Chairman.
Taking stock and next steps CCWG F2F, 23 March 2015.
22-23 June 2004TISPAN-3GPP Workshop - Sophia-Antipolis 1 NGN Workitems (The making of) Martin Niekus Lucent Technologies
© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
PRJ566 Project Planning & Management Work Breakdown Structure.
CJK9, Zhangjiajie, China 1/14 Discussion: [Drafted] 3GPPs works in CJK Cooperation CJK 9, Zhangjiajie, China April 8-10,2009 Changho RYOO
PSCIOC-PSSDC Workplan Coordination Strategy– Draft Coordination Committee Telecon
1 LTE standards Status for this work in 3GPP and what next for the Future Francois COURAU 3GPP TSG RAN Chairman.
Deb Barclay GPP2 All IP Emergency Calls SDO Emergency Services Coordination Workshop Washington DC
World Class Standards Common IMS in TISPAN SA3LITISPANWG7_08_02 Scott CADZOW.
ITU Workshop on “Voice and Video over LTE” Geneva, Switzerland, 1 December 2015 ACTIVITIES OF THE ITU-T SG11 TOWARDS IMS AND VoLTE/ViLTE INTEROPERABILITY.
MCC 3GPP Work program Database Ian Doig, MCC. 3GPP Work program Database Request by Partner Organisations for a common 3G Work program Database. Based.
WG 2 Progress Report at TP#9 Group Name: oneM2M TP #9 Source: WG2 leadership Meeting Date: /21 Agenda Item: WG Reports.
IMS developments in 3GPP
Page 1TTT - May 12, GPP IMS Standardization Update Bell Labs Innovations Lucent Technologies Room 9C Lucent Ln. Naperville, IL E Mail.
Program Management Team Framework Strawman Vancouver June 2001 Sprint PCS ®
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
22-23 June 2004TISPAN-3GPP Workshop - Sophia-Antipolis 1 Joint 3GPP & TISPAN Workshop on NGN-IMS - Objectives - Alain Le Roux (France Telecom), TISPAN.
ETSI TCCE WG4 work G. Marque-Pucheu (Airbus / ETSI TCCE WG4) 26-27/08/ 2014.
Update on ETSI Cyber Security work Charles Brookson OCG Security Chairman Largely based on presentations given by Judith E. Y. Rossebø ETSI TISPAN WG7.
3GPP TSG RAN WG2 meeting #92 Nanjing, China 23-27, May 2016 R
30-31 March 2005Workshop "IMS over Fixed Access" - Washington 1 Joint 3GPP & TISPAN Workshop on NGN-IMS - Objectives - Alain Le Roux (France Telecom),
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Review of new Question descriptions under ITU-T SG11
ETSI–3GPP NGN ACTIVITIES
ETSI–3GPP NGN ACTIVITIES
Chae-Sub LEE TTA Summary Report of 6th FG NGN Chae-Sub LEE TTA
Managing the Project Lifecycle
20th CJK UNIOT-WG (Standardization of Mobile IPTV in ITU-T)
Bruno Chatras, ETSI TC TISPAN Vice-Chairman
Kangchan lee 20th CJK UNIOT-WG (Current Status of Cloud Computing Standardization Acuities in ITU-T) - Update of CJK-UNIOT Kangchan.
CJK 10th NGN-WG (Follow up IPTV-GSI) Chae Sub, Lee
Outcome TFCS-11// February Washington DC
SG-13 / SSG Information Sharing Session Geneva - 05 November 2002
Standardization activities on NGN in CCSA
5QC Update IPSG Meeting Lisbon, 15 November 2007
High Interest Subject: NGN – End-to-End QoS
GTSC-4 Chair: Anil Kripalani Secretary: Henry Cuschieri
High Interest Subject: Internet Protocol Over Wireless
PSTN/ISDN Emulation Subsystem
ETSI–3GPP NGN ACTIVITIES
Dino Flore TSG-RAN Chairman Balazs Bertenyi TSG-SA Chairman
Nobuo Fujii (GTSC Chair) Rapporteur: Nicole Butler
Presentation transcript:

30-31 March 2005 Workshop "IMS over Fixed Access" - Washington 1 TISPAN_NGN Project plan Martin Niekus Alain Sultan

30-31 March 2005Workshop "IMS over Fixed Access" - Washington 2 Agenda 1.Approval of agenda and Documents 2.Workshop objectives 3.NGN (Release 1) Architecture status 4.IMS Architecture and R6 & R7 status 5.Review of the NGN-IMS issues & status 6.Fixed Access to IMS issues/discussion 7.Backbone issues/Interco schemes 8.Session Border Controllers concept 9.Current activities and work plan 10.Next steps/Future cooperation 11.Any other issue 12.Wrap-up/closure

30-31 March 2005Workshop "IMS over Fixed Access" - Washington 3 Introduction of a Work Plan in TISPAN Using the same methodology as in 3GPP, a Work Plan is about to be introduced in TISPAN in order to:  Provide a top-down view of the system being defined by TISPAN  Identify, dispatch and coordinate the work between all TISPAN Working Groups  Keep track of all the progress being done in the different Working Groups so that global decisions can be taken, e.g. freezing date and content of each TISPAN NGN Release  Identify risks of delay and dependencies between tasks, and from external bodies (e.g. 3GPP)  Collect the information on all past and present work, thus providing a tool to retrieve all past achievements

30-31 March 2005Workshop "IMS over Fixed Access" - Washington 4 Introduction of Work Plan in TISPAN Commonalities between TISPAN and 3GPP Work Plans:  The master is in MS Project and output copies are provided in different formats (mainly PDF and Excel)  Two ways of interactions are needed:  TISPAN to Work Plan: the WG chairs and rapporteurs provide periodic updates to ETSI to maintain the WP (level of completion, new tasks, etc)  Work Plan to TISPAN: At WG level: ETSI provides clear view of the items to be progressed by each WG At plenary level: a summary of the overall progress (possibly via a slide show) in presented to the plenary Differences between TISPAN and 3GPP Work Plans:  3GPP Work Plan lists all the (independent) 3GPP Rel-6 and 7 Features whereas TISPAN Work Plan lists all the necessary modules needed to define the TISPAN Rel-1 system

30-31 March 2005Workshop "IMS over Fixed Access" - Washington 5 TISPAN Approach to Work Planning  The classical Stages 1/2/3 approach (ITU I.130 methodology) is supposed to be adopted with same “flexibility” as in 3GPP, i.e. Stage 2 can be started even before “deep freeze” of Stage 1 and the same applies between Stage 3 and 2  Stage 1:  The first step is to complete the overall stage 1 document, DTR/TISPAN NGN-R1, identifying clearly the TISPAN-specific stage 1 requirements  Stage 2:  The second step is to complete the overall stage 2 document, DES/TISPAN NGN-R1.  As a result of WI 02007, the work is dispatched to the different Working Groups, allowing them to work in parallel to define the detailed specifications of the network parts  Stage 2 documentation should clearly reflect which subsystems and protocols are specific to TISPAN and which ones are re-used from external bodies, in particular 3GPP.  Finally, once the big lines are clear, then detailed Stage 2 and the Stage 3 work can be progressed in parallel. Designed to support the cooperation with 3GPP

30-31 March 2005Workshop "IMS over Fixed Access" - Washington 6 Content of the proposed first draft of the TISPAN Work Plan  As TISPAN work is already well advanced, the Work Plan goes one step further, i.e. it allocates tasks to:  Define each identified subsystems (i.e. NAS, RACS, IMS, PES, Transport and Terminal aspects) and inter- subsystems aspects  Define the different transverse aspects (i.e. Applications, Security, OAM, Codec, Testing)  Define miscellaneous and study items, grouped into “Background” and “specific issues”, like “terminology”, “strategy”, “QoS”, “capabilities”, etc.

30-31 March 2005Workshop "IMS over Fixed Access" - Washington 7 Top view of the proposed Work Plan

30-31 March 2005Workshop "IMS over Fixed Access" - Washington 8 Dates and milestones  High-level Rel-1 work item approval planning:  TISPAN#6: Requirements, High-level architecture, Immediate messaging, Early simulation services, Early protocols, Enum privacy.  TISPAN#7: Detailed architecture (NASS, RACS), Additional simulation services, Security overview, Congestion control.  TISPAN#8: WLAN, SIP & SDP,, Security risk analysis and architecture, Multimedia QoS, PSTN/ISDN Emulation, NGN user data.  TISPAN#9: Single sign-on, Cut-off load for R1 (To be confirmed)

30-31 March 2005Workshop "IMS over Fixed Access" - Washington 9 Next steps for TISPAN Work Plan  The initial “draft” work plan will be presented and reviewed at TISPAN#6 so that the following refinements are included  The deliverables associated to each task need to be reviewed.  The protocols, presently listed together in a “protocols” place holder task, need to be dispatched to the different tasks.  The exact timing of freezing each Stage should be agreed.  The Work plan will be progressed in the next TISPAN steering group call

30-31 March 2005Workshop "IMS over Fixed Access" - Washington 10 Preliminary draft (1/4)  Annex: Preliminary draft

30-31 March 2005Workshop "IMS over Fixed Access" - Washington 11 Preliminary draft (2/4)

30-31 March 2005Workshop "IMS over Fixed Access" - Washington 12 Preliminary draft (3/4)

30-31 March 2005Workshop "IMS over Fixed Access" - Washington 13 Preliminary draft (4/4)