SPX – Timing and Synchronization WBS U1.03.03.03 WBS U1.02.01.03.03 Frank Lenkszus Senior Electronics Engineer AES/Controls DOE Lehman CD-2 Review of APS-Upgrade.

Slides:



Advertisements
Similar presentations
Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut) HOMODYNE AND HETERODYNE READOUT OF A SIGNAL- RECYCLED GRAVITATIONAL WAVE DETECTOR.
Advertisements

Mostly by Gwyn Williams and the JLab Team, Presented by D. Douglas Working Group 4 Diagnostics & Synchronization Requirements Where we are and what needs.
01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
LLRF workshop 2013 Towards the next generation LLRF LBNL Gang Huang On behalf of LLRF Team LLRF workshop Oct. 1, 2013.
SPEAR3 short pulse development J. Safranek for the SSRL accelerator physics group* Outline: Timing mode fill patterns Short bunches –Low alpha Bunch length.
ILC RF phase stability requirements and how can we demonstrate them Sergei Nagaitsev Oct 24, 2007.
Optics Measurements, Corrections, and Modeling for High-Performance Storage Light Source Instrumentation Glenn Decker Diagnostics Group Leader.
RF / Laser Timing for 5/20/14 Frisch. Requirements, Jitter and Drift Looking for 100fs Pk-Pk measurements – 30fs RMS. (state of the art) Jitter:
Short Pulse X-ray Dampers U / U (U ) Geoff Waldschmidt RF Engineer ASD / RF DOE Lehman CD-2 Review of APS-Upgrade 4-6.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Bob Lill FAC meeting Cavity October 30, 2007 LCLS Cavity BPM Status and Testing.
Synchronization System for LUX John Staples, LBNL 26 July 2004.
RF Synchronisation Issues
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Stefan Simrock 3 rd LC School, Oak Brook, IL, USA, 2008, Radio Frequency Systems 1 Timing and Synchronization S. Simrock and Axel Winter DESY, Hamburg,
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
RF Cavity / Coupling Coil Module
1 Timing and RF Distribution NLC -> ILC Josef Frisch.
SPX - Cavity WBS U , U , U Genfa Wu SRF Scientist Accelerator Systems Division/RF Group DOE Lehman CD-2 Review of APS-Upgrade.
SPX High Level RF and RF Interlock Systems WBS U Doug Horan RF Systems Engineer Accelerator Systems Division/RF Group DOE Lehman CD-2 Review.
SPX - Technical Integration WBS Ali Nassiri RF Group Leader SPX Technical Lead Accelerator Systems Division DOE CD-2 Review of APS-U 4-6 December.
Beam Stability WBS U and SPX Diagnostics WBS U Glenn Decker Group Leader APS Accelerator System Division Diagnostics DOE Lehman CD-2.
ANATAC Meeting Line Length Correction Status 2004-Apr-23.
Characterization of Fast Orbit Feedback System Om Singh, APS, ANL NSLS-2 Beam Stability Workshop BNL, April 18-20, 2007.
APS Short Pulse X-ray (SPX) Design Study July 27-29, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Plans for Low-Level Radio Frequency Hengjie Ma NSLS II RF Group NSLS-II ASAC Review, March 26, 2009.
Progress in CW-Timing Distribution for Future Light Sources RUSSELL WILCOX, GANG HUANG, LARRY DOOLITTLE, JOHN BYRD ICFA WORKSHOP ON FUTURE LIGHT SOURCES.
Volker Schlott SV84, LL-RF Workshop, CERN, October 11 th, 2005 Femto-Second Stable Timing and Synchronization Systems Volker Schlott, PSI Motivation –
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
SPIE, PA-IVKrzysztof Czuba1 Improved fiber-optic link for the phase reference distribution system for the TESLA technology based projects Krzysztof.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
SPPS, Beam stability and pulse-to-pulse jitter Patrick Krejcik For the SPPS collaboration Zeuthen Workshop on Start-to-End Simulations of X-ray FEL’s August.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
SPX Controls System WBS U (R&D) WBS U Ned Arnold Computer Systems Engineer AES Division/Computer Systems DOE Lehman CD-2 Review.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
1/19/2006Frank Lenkszus Advanced Photon Source 1 ILC Timing Frank Lenkszus Controls Group Advanced Photon Source Argonne National Lab.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
Mu2e Mu2e CD-2 Review Template Eric Prebys Extinction October 21-24, 2014.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Argonne National Laboratory is managed by The University of Chicago for the U.S. Department of Energy Short Pulse Generation Through Beam Manipulation.
Krzysztof Czuba1 REFERENCE FREQUENCY DISTRIBUTION SYSTEM FOR THE TESLA TECHNOLOGY BASED PROJECTS Krzysztof Czuba Matthias Felber.
J. Corlett. June 16, 2006 A Future Light Source for LBNL Facility Vision and R&D plan John Corlett ALS Scientific Advisory Committee Meeting June 16, 2006.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
Digital RF control at LBNL Gang Huang on behalf of the LBNL LLRF team LLRF2015.
Klystron Amplifier for Short X-ray Pulse Prototype and Test Set A.E. Grelick 5 May 2010.
Recent APS Storage Ring Instrumentation Developments Glenn Decker Advanced Photon Source Beam Diagnostics March 1, 2010.
Integrated phase reference distribution LLRF and laser synchronization system Gang Huang 1, Jin Yang 1,2, Qiang Du 1, Wenhui Huang 2, Yilun Xu 1,2, Larry.
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
Compton Gamma-ray Generation Experiment by Using an Optical Cavity in ATF POSIPOL 2007 Workshop at LAL Hirotaka Shimizu Hiroshima University.
MO/LO Performance Summary and Maintenance Plans Tomasz Plawski Jefferson Lab OPS Stay Retreat, July 15th, 2015.
Heung-Sik Kang Pohang Accelerator Laboratory
NSF Annual Review of the LIGO Laboratory
V.N. Litvinenko (SBU) C. Joshi, W. Mori (UCLA)
Synchronization issues
LCLS_II High Rep Rate Operation and Femtosecond Timing
ILC Phase Reference Distribution R&D
Homodyne readout of an interferometer with Signal Recycling
Injector Performance Requirements Conventional Facilities Update
Low Level RF Status Outline LLRF controls system overview
Low Level RF Status Outline LLRF controls system overview
Electron Beam Systems ETC and Methodology
Breakout Session SC3 – Undulator
LCLS Control System Personnel Linac & BC2 Controls progress
Presentation transcript:

SPX – Timing and Synchronization WBS U WBS U Frank Lenkszus Senior Electronics Engineer AES/Controls DOE Lehman CD-2 Review of APS-Upgrade 4-6 December 2012

Outline  Technical Significance  WBS Scope  Team  Requirements  Design  Risks  ES&H  Cost  Schedule 2 DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

Technical Motivation  SPX presents demanding synchronization requirements that can only be met by state-of-the art techniques 3 DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

WBS 1.02 / 1.03 Timing & Sync Scope/Cost Summary  R&D, Design, construction, testing, and installation of the timing and synchronization systems for SPX  Includes: –16 channel transmitter/sender –Phase stabilizers for LLRF –1 laser oscillator phase stabilizer –2 4-input sync heads for cavities –1 laser oscillator sync head –cable plant –Engineering design/support –LBNL Collaboration DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December

SPX Timing and Synchronization Scope and WBS U & U DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December

Timing/Synchronization Requirements 6 DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012 Specification NameRMS ValueBandwidthDriving Requirement Common-mode phase Variation < 10 deg0.01 Hz – 271 kHzKeep intensity variation under 10% rms Differential mode phase variation between sectors < deg a 0.01 Hz – 200 HzKeep rms beam motion outside of SPX within beam stability requirements Differential mode phase variation between sectors < deg a 0.01 Hz – 1 kHzKeep rms beam motion outside of SPX within beam stability requirements Differential mode phase variation between sectors < 0.28 deg1 kHz – 271 kHzLimits effective emittance growth to below 1.5 pm Beam Line Laser Synchronization to X-ray pulse < 0.27 psec0.01 Hz to 1 kHzLimit increase in effective pulse duration to < 10% a Requirement without orbit correction running

Phase Error Budget  Committee formed to allocate phase tolerances  Committee Members –Ned Arnold, Tim Berenc, John Carwardine, Glenn Decker, Eric Dufresne, Doug Horan, Frank Lenkszus, Yuelin Li, Bob Lill, Hengjie Ma, Vadim Sajaev, Bingxin Yang  Spread sheets developed for both SPX and SPX0 –SPX0 Cross-Phase Mode In-Phase Mode –SPX  Many contributors to phase errors have been identified and quantified where data is available –However there are contributors whose effects are unknown such as microphonics  The spread sheets establish a default error budget allocation to the enumerated contributors based on the specifications in the PRD DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December

The Challenge  One Meter of cable with –7 ppm/degC –V/C = 67%  Result: ~35 femtoseconds/degC DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December At 2815 MHz: 1 degree of phase ~ 1 picosecond

The Team  Entered into a collaboration with LBNL to apply their femtosecond synchronization system to the SPX requirements  The team –ANL Frank Lenkszus Tim Berenc Ned Arnold Hangjie Ma Bob Laird Tom Fors –LBNL John Byrd Russell Wilcox Larry Doolittle Gang Huang Jim Greer Keri Campbell 9 DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

The LBNL Femtosecond-Phase Stabilization System  Measures the optical phase delay through a fiber with a heterodyne interferometer. –The optical frequency is offset by an RF frequency (~100 MHz) –The original optical frequency is heterodyned (mixed) with the offset optical frequency to produce an RF beat signal of 100 MHz –Changes in optical phase translate to identical changes in the 100 MHz beat signal phase –Offers a large leverage over stabilization in the RF domain (six-order-of- magnitude) –One degree of phase change in the 1560 nm optical domain (~ 21 attoseconds) translates to 1 degree of phase change in the RF domain (~25 picoseconds) DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December “Demonstration of Femtosecond-Phase Stabilization in 2 km Optical Fiber”, J. Staples, R. Wilcox, J. Byrd, LBNL, Proceedings of PAC07 (MOPAS028)

LBNL Scheme for Stable Transmission of RF Signals DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December

LBNL Results  2.2 km fiber –19.4 fs 2850 MHz (60 hours) –Variation ~1000 greater without correction  200 m fiber –8.4 fs 2850 MHz (20 hours)  For SPX/SPX0, assigned 20 fs rms over 0.1 Hz to 1 kHz for phase reference distribution DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December Reference: “Stable transmission of radio frequency signals on fiber links using interferometric delay sensing”, R. Wilcox, J. Byrd, L. Doolittle, G Huang, J. Staples, Optics Letters, Vol 34, No. 20, pp (Oct 15, 2009)

SPX Timing/Synchronization Scope DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December Fiber Optic Cable

Beam-Line Laser Control DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December

Feedback  Cavity phase errors cause a vertical kick to the beam –Detected as orbit distortion by BPMs  A Beam Arrival Time Monitor (BAT) located at the upstream cavity will feedback to the main LLRF to stabilize beam arrival time. –But the BAT will not be specified to be stable below 0.01 Hz.  Uncompensated beam arrival time errors will cause a common mode phase error at the upstream cavity.  Common mode and differential mode phase errors are distinguishable by nature of the orbit distortion caused by each.  Feedback from the BPM system to the to the upstream and downstream LLRF phases will compensate for both types of errors.  Feed forward from the upstream cavity phase to the Laser controller will cause the laser to track the x-ray pulse phase. DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December

SPX Timing for Diagnostics  Beam Arrival Time Monitor –352 MHz reference  Residual Tilt Monitor –352 MHz reference  Vertical Beam Size Monitor –No timing reference required  BPMs –Use existing timing/synchronization signals DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December

Timing/Synchronization R&D DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December

SPX0: What’s not Included DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December Fiber Optic Cable Not In Scope for SPX0

SPX0 Timing/Synchronization Block Diagram DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December

Timing/Sync Differences Between SPX and SPX0  Compensation for drifts in the coax cable between A014 and SPX zone is not included  Beam-Line laser controller/stabilizer is not included in SPX0 –Was descoped as a cost reduction measure –Not needed for short (8 hour) runs with wider SPX0 x-ray pulse width  Sync heads are different (4 cavity vs 1 cavity sync head)  LLRF Phase stabilizer function is collocated in LLRF receiver chassis for SPX0 and in a separate chassis for SPX DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December

SPX0 Receiver DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December Beat Module Phase Detect

SYNC Head (LCLS version) DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December

R&D Status  Transmitter/Sender is in fabrication at vendor –Expect completion by 12/12  RF and Optical Sync Heads are in fabrication at vendor –Delivery scheduled for 1/30/13  Four receiver chassis have been assembled at LBNL –Porting of Phase Stabilizer code is in process  Preliminary system test complete by LBNL - 3/31/13 DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December

SPX Timing and Synchronization Risks/Mitigation  To meet Common Mode Phase specification long term –Use Feedback From Storage Ring BPMs within the SPX zone to LLRF cavity phase to compensate –Use feedback from Beam Arrival Time Monitor to SR Main LLRF  To meet Differential Mode Phase Specification long term –Use Feedback From Storage Ring BPMs outside the SPX zone to LLRF cavity phase to compensate  To meet long term beam line laser to x-ray pulse synchronization specification –Use feed forward from the upstream cavity phase to beam-line laser phase to track x-ray pulse 24 DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

Timing/Synchronization ES&H DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December  Integrated Safety Management System (ISMS) –APS-U Project following Argonne’s ISMS program requirements –Argonne Integrated Safety Management System (ISMS) Description recently revised and submitted to DOE ASO Describes framework for integrating ESH requirements with mission objectives References Argonne LMS procedures which implement specific portions of the ISMS  Electrical Safety –All equipment will be NRTL inspected before testing/operating  Laser Safety –Transmitter/Sender reviewed by Laser Safety Officer –Laser Light Completely contained in fibers

SPX Timing and Synchronization Scope and WBS U & U DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December LBNL Collaboration Vendor Quotes LBNL Collaboration

SPX Timing and Synchronization BOE Contingency U & U DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December

SPX Timing and Synchronization Obligation Profile U & U DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December

SPX R&D and Production Milestones U & U DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December

SPX Timing and Synchronization Milestones U & U DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December

SPX Timing and Synchronization Summary Schedule U & U DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December

Timing/Synchronization Work After CD-2  Final Design will be completed  Laser/X-ray pulse synchronization R&D will continue at LBNL  SPX0 will give opportunity to verify that cavity synchronization can be achieved  Will be a Final Design Review prior to CD3 32 DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

Summary Timing/Synchronization 33  This system provides the timing/synchronization required for the SPX cavities and beam-line laser.  The requirements are given in the SPX PRD. —Primary Challenge is differential phase tolerance.  The preliminary design is complete —Major components are in prototyping stage Transmitter/Sender RF and Optical Sync Heads Link stabilizer  Entered into collaboration with LBNL to apply their femtosecond timing/synchronization system to the SPX project. —LBNL’s system should allow stringent timing/synchronization requirements to be met. —Expect LBNL system to contribute less than 20 femtoseconds rms to synchronization errors. DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

Summary Timing/Synchronization (Continued)  Installation Plan –SPX0: Start 8/26/13 Complete 12/4/13 –SPX Link Transmitter, Cables, Phase Stabilizers –Start 1/6/15 –Complete 11/9/15 Phase Reference for Cyro #1 –Start 4/23/18 –Complete 5/18/18 Phase Reference for Cyro #2 –Start 12/10/18 –Complete 1/15/19  The total cost is $2664k  We are ready for CD2 DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December