S.L.LloydGridPP CB 19 February 2003Slide 1 Agenda 1.Minutes of Previous Meeting (29 Oct 2002) 2.Matters Arising 3.GridPP2 Planning 4.EGEE 5.Any Other Business.

Slides:



Advertisements
Similar presentations
S.L.LloydATSE e-Science Visit April 2004Slide 1 GridPP – A UK Computing Grid for Particle Physics GridPP 19 UK Universities, CCLRC (RAL & Daresbury) and.
Advertisements

S.L.LloydGridPP Collaboration Meeting Introduction Slide 1 GridPP - Introduction Welcome to the First GridPP Collaboration Meeting Introduction A brief.
GridPP9 – 5 February 2004 – Data Management DataGrid is a project funded by the European Union GridPP is funded by PPARC GridPP2: Data and Storage Management.
Fabric and Storage Management GridPP Fabric and Storage Management GridPP 24/24 May 2001.
GridPP4 – Revised Plan Implementing the PPAN recommendations.
Welcome to the 12 th GridPP Collaboration Meeting Introduction Steve Lloyd, Chair of the GridPP Collaboration Board Report on recent meetings of: PPARC.
Tony Doyle GridPP2 Specification Process Grid Steering Committee Meeting, MRC, London, 18 February 2004.
S.L.LloydGridPP Collaboration Meeting IC Sept 2002Slide 1 Introduction Welcome to the 5 th GridPP Collaboration Meeting Steve Lloyd, Chair of GridPP.
Particle physics – the computing challenge CERN Large Hadron Collider –2007 –the worlds most powerful particle accelerator –10 petabytes (10 million billion.
S.L.LloydGridPP9 IntroductionSlide 1 Introduction Welcome to the 9 th GridPP Collaboration Meeting Dissemination Officer GridPP2 Posts Tier-2 Centres Steve.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP Oversight Committee Meeting.
Level 1 Components of the Project. Level 0 Goal or Aim of GridPP. Level 2 Elements of the components. Level 2 Milestones for the elements.
Tony Doyle GridPP2 Proposal, BT Meeting, Imperial, 23 July 2003.
SWITCH Visit to NeSC Malcolm Atkinson Director 5 th October 2004.
16 th Oct’02Nick Brook – University of Bristol1 News Nick Brook University of Bristol PMB News Feedback from “review” LCG News.
S.L.LloydGridPP CB 4 December 2003Slide 1 Agenda 1.Minutes of Previous Meeting (19 Feb 2003) 2.Matters Arising 3.Announcements (Steve) 4.GridPP2 Proposal.
15 May 2006Collaboration Board GridPP3 Planning Executive Summary Steve Lloyd.
18 th Mar’03Nick Brook – University of Bristol1 GridPP2 bid Nick Brook University of Bristol Timescales Draft outline Envelope What is expected from expts.
Nick Brook University of Bristol The LHC Experiments & Lattice EB News Brief overview of the expts  ATLAS  CMS  LHCb  Lattice.
EGEE statement EU and EU member states major investment in Grid Technology Several good prototype results Next Step: –Leverage current and planned national.
2 GridPP2 Budget David Britton, 4/12/03 Imperial College.
D. Britton Project Manager’s Report David Britton 12/Jan/2005.
Manchester Computing Supercomputing, Visualization & e-Science Michael Daw 1 September 2004 All Hands Meeting, Nottingham Introducing… the Access Grid.
Grid Infrastructure in the UK Neil Geddes. Why this talk ? LHC to 2020 –GridPP to 2011 –SRIF3 to 2010 ? Who was successful in SRIF3? –Thereafter ? PPARC.
Tony Doyle “GridPP2 Proposal”, GridPP7 Collab. Meeting, Oxford, 1 July 2003.
S.L.LloydGridPP CB 29 Oct 2002Slide 1 Agenda 1.Introduction – Steve Lloyd 2.Minutes of Previous Meeting (23 Oct 2001) 3.Matters Arising 4.Project Leader's.
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
Edinburgh University Experimental Particle Physics Alasdair Earl PPARC eScience Summer School September 2002.
14 July 2004GridPP Collaboration BoardSlide 1 GridPP Dissemination Sarah Pearce Dissemination Officer
GridPP Steve Lloyd, Chair of the GridPP Collaboration Board.
D. Britton GridPP3 David Britton 27/June/2006. D. Britton27/June/2006GridPP3 Life after GridPP2 We propose a 7-month transition period for GridPP2, followed.
Welcome e-Science in the UK Building Collaborative eResearch Environments Prof. Malcolm Atkinson Director 23 rd February 2004.
CMS Report – GridPP Collaboration Meeting VI Peter Hobson, Brunel University30/1/2003 CMS Status and Plans Progress towards GridPP milestones Workload.
D. Britton Collaboration Board Meeting David Britton 16/Jul/07.
D. Britton GridPP Status - ProjectMap 22/Feb/06. D. Britton22/Feb/2006GridPP Status GridPP2 ProjectMap.
Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Beyond GridPP2 Tony Doyle.
INFSO-RI Enabling Grids for E-sciencE SA1: Cookbook (DSA1.7) Ian Bird CERN 18 January 2006.
Robin Middleton RAL/PPD DG Co-ordination Rome, 23rd June 2001.
3 June 2004GridPP10Slide 1 GridPP Dissemination Sarah Pearce Dissemination Officer
ATLAS and GridPP GridPP Collaboration Meeting, Edinburgh, 5 th November 2001 RWL Jones, Lancaster University.
GridPP3 Project Management GridPP20 Sarah Pearce 11 March 2008.
Tony Doyle - University of Glasgow 6 September 2005Collaboration Meeting GridPP Overview (emphasis on beyond GridPP) Tony Doyle.
GridPP Collaboration meeting Manchester 9/10 May 2002 P.Clarke Resource Management: Instruments and Procedures Testbed Rollout: Development of Plan Education.
SouthGrid SouthGrid SouthGrid is a distributed Tier 2 centre, one of four setup in the UK as part of the GridPP project. SouthGrid.
GridPP Deployment & Operations GridPP has built a Computing Grid of more than 5,000 CPUs, with equipment based at many of the particle physics centres.
InterGrid Meeting 7 Oct 2001 Tony Doyle. Tony Doyle - University of Glasgow GridPP Status  Financial Background  Deliverables  Recruitment  Regional.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP Computing for Particle.
LCG Introduction John Gordon, STFC-RAL GDB September 9 th, 2008.
GridPP Presentation to AstroGrid 13 December 2001 Steve Lloyd Queen Mary University of London.
GridPP Building a UK Computing Grid for Particle Physics Professor Steve Lloyd, Queen Mary, University of London Chair of the GridPP Collaboration Board.
GRID IIII D UK Particle Physics Tony Doyle - University of Glasgow GridPP Status Report  Executive Summary  News  “Unfunded” EU DataGrid Posts  Shadow.
October 30, 2001ATLAS PCAP1 LHC Computing at CERN and elsewhere The LHC Computing Grid Project as approved by Council, on September 20, 2001 M Kasemann,
…building the next IT revolution From Web to Grid…
Tony Doyle - University of Glasgow 8 July 2005Collaboration Board Meeting GridPP Report Tony Doyle.
E-Science Research Councils awarded e-Science funds ” science increasingly done through distributed global collaborations enabled by the Internet, using.
Grid User Interface for ATLAS & LHCb A more recent UK mini production used input data stored on RAL’s tape server, the requirements in JDL and the IC Resource.
Grid Security work in 2004 Andrew McNab Grid Security Research Fellow University of Manchester.
U.S. ATLAS Computing Facilities Overview Bruce G. Gibbard Brookhaven National Laboratory U.S. LHC Software and Computing Review Brookhaven National Laboratory.
LHC Computing, SPC-FC-CC-C; H F Hoffmann1 CERN/2379/Rev: Proposal for building the LHC computing environment at CERN (Phase 1) Goals of Phase.
NERC e-Science Meeting Malcolm Atkinson Director & e-Science Envoy UK National e-Science Centre & e-Science Institute 26 th April 2006.
CNAP MEETING 7 October 2002 J.C.Sherman. AS&SG What was previously the Starlink line in the PPARC SLA is now the Astronomical Software and Services Group.
RC ICT Conference 17 May 2004 Research Councils ICT Conference The UK e-Science Programme David Wallace, Chair, e-Science Steering Committee.
LHC Computing at RAL PPD Dave Newbold RAL PPD / University of Bristol The LHC computing challenge PPD and the Grid Computing for physics PPD added value.
Slide § David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP delivering The UK Grid.
1 ALICE Summary LHCC Computing Manpower Review September 3, 2003.
UK GridPP Tier-1/A Centre at CLRC
High Energy Physics Computing Coordination in Pakistan
Collaboration Board Meeting
GridPP4 Oversight Committee Meeting 4th February 2010
LHC Computing, RRB; H F Hoffmann
Presentation transcript:

S.L.LloydGridPP CB 19 February 2003Slide 1 Agenda 1.Minutes of Previous Meeting (29 Oct 2002) 2.Matters Arising 3.GridPP2 Planning 4.EGEE 5.Any Other Business 6.Date of Next Meeting

S.L.LloydGridPP CB 19 February 2003Slide 2 Minutes of Previous Meeting Minutes of CB Meeting 29 October 2002 –Approved? Actions: –SLL to write to PPARC about long term computing support. Done – no reply. (GridPP2 bid will make this more explicit). –SLL to summarise losses in Grants round. A few computing posts lost. No evidence of specific targeting of computing jobs.

S.L.LloydGridPP CB 19 February 2003Slide 3 Matters Arising Successful second EU DataGrid Review Tier2 Centres –All 4 regions presented at recent GridPP Collaboration meeting and have submitted EoIs –4 x 0.5 FTE from 1 September 2003 –Plans to GridPP by 1 May 2003 –Hopefully more posts in GridPP2 Risk Register –First version complete, for next Oversight Committee Experimental Deliverables –being iterated JCSR bid to JISC –Middleware support through Grid Support Centre

S.L.LloydGridPP CB 19 February 2003Slide 4 Risk Register

S.L.LloydGridPP CB 19 February 2003Slide 5 GridPP2 Future Priorities Continue supporting Tier-1/A staff Continue ramp up of Tier-1/A hardware Support for Tier-2 staff –Complimentary to University funding Continued support for Applications development –Through rolling grants? Continued support for Middleware development –Including Framework VI etc Ramp up of Tier-2 hardware –From University funding (SRIF etc)? Continued support of CERN staff Continued ramp up of CERN hardware

S.L.LloydGridPP CB 19 February 2003Slide 6 Likely PPARC Call PPARC e-Science Centres –Development and deployment of computing centres for the LHC experiments including: UK National Tier-1 Centre Local or Regional Tier-2 Centres –Astronomical Virtual Observatory data centres –Collaborative software developments with CERN and ESO Applications Development The Grid enabled applications software for the LHC experiments, including reconstruction, simulation and analysis software required for full exploitation of the first LHC data in 2007 Data Processing pipelines.... in Astronomy

S.L.LloydGridPP CB 19 February 2003Slide 7 GridPP2 Bids Bids probably due by end of May 2003 We intend to address funding through to LHC exploitation: –GridPP –GridPP –Exploitation2007 – onwards Envisage one main GridPP2 bid plus several separate bids from Experiments and possibly Tier-2 centres

S.L.LloydGridPP CB 19 February 2003Slide 8 GridPP2 Overview FundingBidder Tier-1 StaffPPARCGridPP Tier-1 HardwarePPARCGridPP Tier-2 StaffPPARCGridPP or Institutes Tier-2 HardwareSRIF/JREI... Tier-0 StaffPPARCGridPP Tier-0 HardwarePPARCGridPP App Interface StaffPPARCGridPP App Develop StaffPPARCExperiments Middleware StaffPPARC/EU?GridPP ManagersPPARCGridPP Travel and Misc costsPPARCGridPP

S.L.LloydGridPP CB 19 February 2003Slide 9 Possible Bids Overview 1 Overview of whole GridPP1/GridPP2/Exploitation programme Suggested breakdown of costs by area GridPP2 Bid Detailed bid for: Tier-1 Staff Tier-1 Hardware Tier-0 Staff Tier-0 Hardware Application Interface Staff Middleware Staff Managers Travel etc GridPP2 Document Expt A Bid Detailed bid for: Application Develop Staff Expt B Bid Detailed bid for: Application Develop Staff Tier-2 X Bid Detailed bid for: Tier-2 Staff Tier-2 Y Bid Detailed bid for: Tier-2 Staff

S.L.LloydGridPP CB 19 February 2003Slide 10 Possible Bids Overview 2 Overview of whole GridPP1/GridPP2/Exploitation programme Suggested breakdown of costs by area GridPP2 Bid Detailed bid for: Tier-2 Staff Tier-1 Staff Tier-1 Hardware Tier-0 Staff Tier-0 Hardware Application Interface Staff Middleware Staff Managers Travel etc GridPP2 Document Expt A Bid Detailed bid for: Application Develop Staff Expt B Bid Detailed bid for: Application Develop Staff