Brenna Flaugher May 17, 2007 1 Technical Draft Recommendations 3.1Optics, Optical Corrector, Mechanical Systems 1.Augment the systems engineering effort.

Slides:



Advertisements
Similar presentations
Brenna Flaugher Sept. 26, The Dark Energy Survey Camera: DECam 1.1 Management 1.2 Focal Plane Detectors 1.3 Front End Electronics 1.4 Optics 1.5.
Advertisements

TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Pre-Director’s Review Findings & Recommendations RecommendationManagerStatus 9Update BOE for AlN boardsShawDone 10Establish the budget profile ASAPFlaugherDone.
Cost, Schedule & Funding Closeout Jan Joint DOE/NSF CD2/3a Review 1 DOE/NSF Review of the Dark Energy Survey (DES) Project SC 6/7 Cost, Schedule.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
NGAO System Design Review Response Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting June 18, 2008.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
Systems Engineering Management
Software Evolution Planning CIS 376 Bruce R. Maxim UM-Dearborn.
® IBM Software Group © 2006 IBM Corporation PRJ480 Mastering the Management of Iterative Development v2 Module 3: Phase Management - Inception.
Chapter 10.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
Server Virtualization: Navy Network Operations Centers
1 Framework Programme 7 Guide for Applicants
University of Palestine software engineering department Testing of Software Systems Fundamentals of testing instructor: Tasneem Darwish.
DES PMG Meeting, January 26, 2007 T. Shaw1 DES PMG Meeting Front End Electronics Status T. Shaw, D. Huffman, M. Kozlovsky, J. Olsen, W. Stuermer (FNAL)
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
EddiCam: The Eddington Photometric Camera EddiCam Definition Phase Kick-Off Meeting J. Miguel Mas-Hesse Vienna, 17th Sept., 2001.
Role-Based Guide to the RUP Architect. 2 Mission of an Architect A software architect leads and coordinates technical activities and artifacts throughout.
1 Chapter 5 Project management. 2 Project management : Is Organizing, planning and scheduling software projects.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
7/26/2006 Wyatt Merritt 1 DECam Preparations for Critical Decision 2/3a Preparations for CD2 Preparations for CD3a DECam MOUs.
Stakeholder consultations Kyiv May 13, Why stakeholder consultations? To help improve project design and implementation To inform people about changes.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
3.1 Optomechanical systems (1) Scientific and engineering resources are available to carry out the optomechanical work on DECam. The highly distributed.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
Assessing the influence on processes when evolving the software architecture By Larsson S, Wall A, Wallin P Parul Patel.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
Brenna Flaugher July 20, DECam Project Summary Outline –WBS 1.1 Management –WBS 1.2 Focal Plan Detectors –WBS 1.3 Front End Electronics –WBS 1.4.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
U.S. Muon Accelerator Program: MICE Milestones & Resource-Loaded Schedule M. A. Palmer, Director October 31, 2012.
3.1.1 Optics, Optical Corrector, Mechanical Systems M. Johns, C. Claver.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
Focal Plane Detectors and CCD Camera Roger Smith Steven Kahn DECam CD-1.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Brenna Flaugher October 30, 2007 Preliminary Directors Review 1 Outline This talk will describe progress on DECam since the joint NSF/DOE CD-1 review in.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
Brenna Flaugher July 6, DECam Project Summary Outline –WBS 1.1 Management –WBS 1.2 Focal Plan Detectors –WBS 1.3 Front End Electronics –WBS 1.4.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
DES Review CCD Focal Plane and Camera Roger Smith George Ricker.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Apr 29, 2003SSWG - CDR Comments1 PFIS Critical Design Review Comments Detailed response available in document SALT- 3100BP0011 (PFIS web site) Responses.
Brenna Flaugher, PMG, April 6, 2007 DECam Funding Need Profile (Dec 06) (then yr $, Overhead included) This gave a technically driven schedule resulting.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 1 The DECam Project Closeout, Action Items Hexapod Optical Lenses CCD Readout Filters Shutter 2008.
Dr.F. Arteche EMC DEPFET Project: A general overview.
Time to resolve Design Issues 1. Disclamer Due to the engineering meeting last week I have not had time to coordinate this material with Tim or the L3.
Content Lessons from writing proposals and work on PTDR How can this meeting help to remedy problems SCT AOB.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
Camera PDR/CD1 Planning 19 September 2008
Jim Fast Pacific Northwest National Laboratory
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
S4 will be a “big” Collaboration:
Flooding Walkdown Guidance
Description of Revision
EMIS 7307 Chapter 6.
Preliminary Project Execution Plan
Second Avenue Subway Project Execution Strategy
{Project Name} Organizational Chart, Roles and Responsibilities
Presentation transcript:

Brenna Flaugher May 17, Technical Draft Recommendations 3.1Optics, Optical Corrector, Mechanical Systems 1.Augment the systems engineering effort within the DECam group. Brenna, Greg, Jim 2.Complete the FEA for the DECam structure and combined instrument/telescope assembly for CD- 2. Revise the design of the cage assembly and vanes if necessary. Andy 3.Perform a cost-benefit trade study of lens fabrication methodology (surface figure only versus transmission testing) for CD-2. Revise lens specifications if necessary. Peter Doel, UCL 4.Maintain contact with Corning regarding lens blank availability. Peter, David Brooks and I will visit Corning June 12-14, 5.Complete a stray light analysis. Andy-> Bruce Bigelow (Michigan) 6.Re-examine the need for a light baffle enclosing the barrel assembly and delete if superfluous. Andy and Bruce 7.Resolve hexapod performance issues and consider alternative designs. Workshop next week 8.Include the f/8 assembly and counterweight in the weight and balance tabulations. Andy 9.Complete the lens cover conceptual design. Andy->French or ?

Brenna Flaugher May 17, Focal Plane Detectors and CCD Camera CCD Yield (Tom, Juan, Huan, Jim + input from Science WKG) 1.Fully test a sufficient number of packaged CCDs in time to provide a more accurate yield projection by CD-2, and enable the project to carry a smaller range of budget and schedule scenarios. Determine the dependence of yield on operating temperature (due to freeze out of back side defects). 2.Pursue a testing strategy for lot 2 CCDs, which includes several 2k x 4k CCDs in advance of CD-2, not just 2k x 2k devices, to address the concern that the 2k x 4k devices might present yield or performance issues not seen in the 2k x 2k devices. 3.By CD-2 develop detailed plans and costs estimates for all yield scenarios under consideration. 4.Cost, schedule and impact on science need to be quantified for the fall back scenario in which some CCDs are replaced with better ones in Chile. 5.In both DOE funding scenarios (1 & 2), maintain a steady pace in the manufacture, packaging and testing of CCDs to avoid yield losses due to process startup. Ramp up to a pace which will fully engage the various participants ASAP and avoid interruptions to maximize yield. 6.Work with the science team to develop a more sophisticated measure of performance yield. A formal process should be initiated to update the flowdown of science requirements, which should be under change control.. Cooling (Herman, Rich, Andy, CTIO) 1.Obtain empirical data on radiative transfer from window to CCDs and the effectiveness of aggressive radiation shielding, so major expense is not incurred simply to allow margin for large uncertainties in thermal load projections. 2.Conduct an external review prior to CD2 to evaluate the cryogenic and vacuum options considering development cost, operating cost, maintenance cost and reliability. The review should address the vacuum system design issues and options raised in the comments section of this report. This mini-review should also examine the (dis)assembly method which is intimately coupled to the vacuum and cooling Technical Draft Recommendations

Brenna Flaugher May 17, Readout Electronics (Terri et al will respond) 1.Down-select, before CD-2, the configurations of electronics modules with justification for each option chosen. Experimental results should be compared with theoretical expectations –JFET on or off AlN substrate –Paralleling JFET’s versus having a preamplifier board –Preamplifier in or out of dewar (if applicable) –Single-ended or differential signal transmission –Kapton versus micro-coax cable –Mechanical design choices of connector attachment to CCD package –Power supply configuration choices –Multi-crate synchronization choices 2.Consider, as an option, calling an external review of the video signal chain prior to CD-2. 3.Analyze scenarios that could put CCDs at risk and evaluate mitigation strategies, if applicable (e.g., power-on or off, or software initialization transients exceeding safe voltage limits). 4.List and review all material properties for vacuum compatibility (e.g., outgassing). 5.Ensure that a failure in one CCD string does not impact the operation of other CCDs. SISPI: CTIO (Tim et al) + Juan + Inga/Jon 6.Evaluate tracking errors caused by the unavailability of guiding information immediately prior to the exposure and resulting from persistence effects in the guide CCDs. Technical Draft Recommendations

Brenna Flaugher May 17, Re-plan CD-3 to be consistent with the planned state of the design. CCDs and Final CCD packages are the long lead time and critical tasks for FY08 and prime candidates for CD-3a 2. Monitor the foreign contributions form UK and Spain closely. Delays in funding could be a risk to the overall project. Brenna with UCL and Peter Doel on the UK part and Terri and Barcelona on the Spanish part 3. Form a resource management board with director level persons from the primary institutions. John and Brenna 4. Add Level 2 milestones with a density of about one per month. I don’t what more L2 milestones, DOE guidance (Kathy) was one L2/6 months. But we will add more L3 and L4 milestones in the schedule ~ one/month per subsystem. COST, SCHEDULE, and FUNDING Draft Recommendations

Brenna Flaugher May 17, Determine whether it is feasible and justified to seek a simultaneous CD-2 and CD review or revise project plan to reflect staggered CD-2/CD-3 and potentially the use of partial critical decisions (e.g. CD-2a/b; CD-3a/b) and solicit DOE concurrence. The CCDs and Final CCD packages are the long lead time and critical tasks for FY08 and prime candidates for CD-3a. Will work with L2 managers on this. 2.Develop and finalize a complete set of MOUs with annually revised appendices describing scope of work and management details at all necessary levels of the DES project before the DES Project review for CD-2. These MOUs must include the principal laboratory directors MOU (FNAL/NOAO/NCSA) and all additional collaborating institutions with in-kind contributions. Wyatt (and Brenna and John) – Starting with DECam MOUs between Fermilab and the institutions contributing to the DECam project 3.Provide additional systems management resources at the highest level of the DES Project to ensure complete and proper delineation and integration of the three projects (DECam, DES Data Management, CTIO Improvements) before the next DOE/NSF review. John and the directors 4.Separate into a minimum of two separately controlled documents the fundamental scientific requirements and derived technical specifications before July 1, ???John?? Need to plan and distribute the responsibilities: Kent, DePoy, Annis, Huan…. Maybe 3 documents: Science Requirements, Technical requirements, Technical Specifications? Project Management Draft Recommendations

Brenna Flaugher May 17, Develop and implement a project monitoring and control approach, that may includes low-level milestone tracking, for Data Management and CTIO Improvements that will ensure the timeliness of progress of explicitly funded and in-kind contributions that make up the balance of these two projects before the next DOE/NSF review. John, directors, JOG? 6.Consider developing and implementing an active milestone monitoring of the DECam project and in particular in-kind contributions that includes frequent explicit monitoring of individual milestone schedule float consumption prior to the review for CD-2. Brenna, Peter Doel, Terri 7.Consider the development of a DES Project Resources Board and coordinate its scope and direction with DOE and NSF with respect to any Joint Oversight Group (JOG) that might be formed by the next DOE/NSF review John 8.Fill the systems/project engineering position within the DECam Project as soon as possible. Looks unlikely we will get additional high level engineering, but with a DECam project scientist and additional targeted engineering to free up Andy and Terri it might be OK. 9.Develop explicit criteria and definitions for the end of the DECam project and its corresponding CD- 4 before the CD-2 review. Specifically, address issues of number of acceptable and installed CCDs on the focal plane and gatepoint criteria needed to determine when to transfer the instrument to CTIO. Brenna, Tim John, Alistair, Science WKG? Project Management Draft Recommendations

Brenna Flaugher May 17, News All reviews have stated that we need a DECam project scientist or project engineer or technical specialist –Darren DePoy (OSU) is considering taking on this role. Experienced Astronomer Many years observing at CTIO Head of the Instrumentation group at OSU since 2001 Builder of astronomical instruments –Mont, Scott, John are all supportive – now we move to the details –Will help translate scientific and technical requirements into detailed specifications that we can use for vendors and engineers –Help with the decisions we need to make before CD-2 (and after!) Image Quality Workshop: May 22 nd 12:30-5 Sidet – Agenda: 1) Steve Kent : Science Requirements 2) Tim: Review of what has been measured on the telescope flexurehttp://des-docdb.fnal.gov:8080/cgi-bin/DisplayMeeting?conferenceid=42 3) Andy: Review what parts of the telescope structure have been modeled 4) Mike Gladders - the focus and alignment chips and donut analysis. 5) Dave Gerdes - review of the BCAM capabilities 6) Dave McGinnis or French - Review of the Hexapod specs

Brenna Flaugher May 17, More Up-coming Workshops SISPI workshop in June at Fermilab Cooling workshop in July/August –Review comments were pointed: “The detector cooling system will probably work as presented but a design using commercial components (e.g., Cryo-Tigers) may be simpler and significantly less expensive. “ –Rich Schmidt, Dave Finley (and Herman) will assemble a technical note on the alternatives. In part this is pulling together the existing technical notes and the meeting presentations from the past year. –Herman et al will continue working on the existing system and planed test for the end of the summer and prepare a detailed description of this system (this will be the basis of the Cooling section of the TDR) –CTIO input is important to this process, will continue monthly cooling meetings and include them in the preparation of these documents –Internal Cooling workshop in July/August to make sure we agree we are on the right path –External review in Sept. Front End Electronics workshop in ~Sept. to review the full chain and prototype electronics