Lectures in Engineering Economy Prof. Corrado lo Storto DIEG, Dept. of Economics and Engineering Management School of Engineering, University of Naples.

Slides:



Advertisements
Similar presentations
Chapter 7 Rate of Return Analysis
Advertisements

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Spring, 2007 (c) 2001 Contemporary Engineering Economics 1 Benefit-Cost.
MANAGERIAL ACCOUNTING
Capital Investments Chapter 12. Capital Budgeting How managers plan significant outlays on projects that have long-term implications such as the purchase.
Chapter 5: Evaluating a Single Project and Comparing Alternatives
Exam 4 Practice Problems Douglas Rittmann, Ph.D., P.E.
Engineering Economics in Canada Chapter 10 Public Sector Decision Making.
1 Project Cash Flow Analysis Lecture No. 27 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
1 Lecture 1 INTRODUCTION TO MODULE 2 Module 2 Module 2 Principles of evaluation Principles of evaluation Depreciation Depreciation Income tax Income tax.
Flash back before we compare mutually exclusive alternatives.
Dealing With Uncertainty
(c) 2001 Contemporary Engineering Economics 1 Chapter 17 Economic Analysis in the Public Sector Framework of Benefit- Cost Analysis Valuation of Benefits.
Contemporary Engineering Economics, 4 th edition, © 2007 Benefit-Cost Ratio Lecture No. 66 Chapter 16 Contemporary Engineering Economics Copyright © 2006.
(c) 2001 Contemporary Engineering Economics 1 Chapter 17 Economic Analysis in the Public Sector Framework of Benefit- Cost Analysis Valuation of Benefits.
VI-Economic Evaluation of Facility Investments 1. Project Life Cycle and Economic Feasibility 2.Basic Concepts of Economic Evaluation 3.Costs and Benefits.
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
Contemporary Engineering Economics, 4 th edition, © 2007 Comparing Mutually Exclusive Alternatives Lecture No.18 Chapter 5 Contemporary Engineering Economics.
Lecture No. 54 Chapter 16 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
EVALUATING PROJECTS WITH THE BENEFIT / COST RATIO METHOD
Advanced Engineering Economy Contemporary Engineering Economics, 5th edition, © 2010.
Evaluating Projects with Benefit/Cost Ratio Method
Benefit/Cost Analysis Lecture slides to accompany
FOOD ENGINEERING DESIGN AND ECONOMICS
ALI SALMAN1 LECTURE - 11 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
Chapter 10: Evaluating Projects with the Benefit-Cost Ratio Method
CTC 475 Review  Course Requirements  Applications  Multiple Decision Criteria  Selling The Project  PSP.
L30: Methods of Handling Project Risk ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
1 Chapter 12 Benefit-Cost Analysis Framework of Benefit- Cost Analysis Evaluation of Benefits and Costs Benefit-Cost Ratios.
Comparing Projects Using Time Value of Money
Copyright ©2012 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fifteenth Edition By William.
The second objective today is to evaluate correctly capital investment alternatives when the time value of money is a key influence.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Effects of Inflation on Project Cash.
CHAPTER 11 EVALUATING PROJECTS WITH THE BENEFIT / COST RATIO METHOD $$$ $
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Benefit Cost Ratio Course Outline 8.
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 9-1 Developed.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Benefit-Cost Ratio Lecture No. 53.
Lectures in Engineering Economy Prof. Corrado lo Storto DIEG, Dept. of Economics and Engineering Management School of Engineering, University of Naples.
Lecture No. 26 Chapter 7 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
MIE Class #5 Manufacturing & Engineering Economics Concerns and Questions Concerns and Questions Quick Recap of Previous ClassQuick Recap of Previous.
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
T9.1 Chapter Outline Chapter 9 Net Present Value and Other Investment Criteria Chapter Organization 9.1Net Present Value 9.2The Payback Rule 9.3The Discounted.
© 2012 by McGraw-Hill All Rights Reserved 9-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin Chapter 9 Benefit/Cost.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Incremental Analysis Lecture No.
1 Benefit Cost Analysis Typically used for public projects The goal is to determine if benefits exceed costs: Benefit / Cost Ratio > 1 The goal is NOT.
1 Benefit Cost Analysis Typically used for public projects The goal is to determine if benefits exceed costs: Benefit / Cost Ratio > 1 The goal is NOT.
Water Resources Planning and Management Daene C. McKinney Economic Analysis of Alternative Water Plans: 1. Benefit/Cost Analysis.
Lecture No.18 Chapter 5 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
L16: Comparing Mutually Exclusive Alternatives ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Comparing Mutually Exclusive Alternatives.
1 Engineering Economics Engineering Economy It deals with the concepts and techniques of analysis useful in evaluating the worth of systems,
Chapter 12: Benefit-cost analysis Framework of benefit- cost analysis Valuation of benefits & costs Benefit-cost ratios Incremental B-C analysis.
Economic Analysis in the Public Sector Benefit/Cost Analysis.
Effects of Inflation on Project Cash Flows
Chapter 6: Comparison and Selection Among Alternatives
Inflation and Its Effects on Project Cash Flows
Project Cash Flow Analysis
Chapter 6: Comparison and Selection Among Alternatives
Comparing Mutually Exclusive Alternatives
Chapter 6: Comparison and Selection Among Alternatives
Benefit Cost Analysis and Public Sector Economics
Chapter 10: Evaluating Projects with the Benefit-Cost Ratio Method
Chapter 6: Comparison and Selection Among Alternatives
Chapter 10: Evaluating Projects with the Benefit-Cost Ratio Method
Chapter 7 Present Worth Analysis
Contemporary Engineering Economics
Project Cash Flow Analysis
Chapter 10: Evaluating Projects with the Benefit-Cost Ratio Method
Chapter 10: Evaluating Projects with the Benefit-Cost Ratio Method
Chapter 6: Comparison and Selection Among Alternatives
Chapter 6: Comparison and Selection Among Alternatives
Presentation transcript:

Lectures in Engineering Economy Prof. Corrado lo Storto DIEG, Dept. of Economics and Engineering Management School of Engineering, University of Naples Federico II phone:

Major issues Engineering Economy/public activities/ 2005 /prof. corrado lo storto Framework of benefit-cost analysis Valuation of benefits and costs Benefit-cost ratios Incremental B-C analysis

Benefit-Cost analysis  The Benefit-cost analysis is commonly used to evaluate public projects.  Benefits of a non-monetary nature need to be quantified in dollar terms as much as possible and factored into the analysis.  A broad range of project users distinct from the sponsor should be considered—benefits and dis-benefits to all these users can (and should) be taken into account. Engineering Economy/public activities/ 2005 /prof. corrado lo storto

Framework of Benefit-Cost Analysis  Identifying all the users and sponsors of the project.  Identifying all the benefits and dis-benefits of the project.  Quantifying all benefits and dis-benefits in some unit of money measure.  Selecting an appropriate interest rate at which to discount benefits and costs to a present value. Engineering Economy/public activities/ 2005 /prof. corrado lo storto

Analyses for Government Agencies and Public Utilities  The government (public sector) analyst has usually greater difficulties when he/she tries to measure benefits than does the private sector analyst because the government sector analyst should include the social benefits and cost of the project;  Economic studies for government agencies are made easier because such agencies are not subject to income tax. While funds for many such agencies are obtained through income taxes none of the agencies pays income taxes to others. Engineering Economy/public activities/ 2005 /prof. corrado lo storto

Criteria for judging acceptability of government projects Analyses of capital expenditures for independent projects can take many forms, such as: 1.Maximization of the ratio of benefits to costs on an annual or present equivalent basis; 2.Minimization of combined annual cost to the public user and the agency supplier of the facility when benefits are fixed; 3.Minimization of the present value sacrificed if the project were cut. Engineering Economy/public activities/ 2005 /prof. corrado lo storto

Major difficulties What is perceived to be in the best interest of the public may vary sharply over time: 1.It depends on changes in such conditions as the state of the economy, foreign relations, public health, environmental degradation, and public services; 2.Intangibles or irreducibles are generally more important in public works than they are in private enterprises. Engineering Economy/public activities/ 2005 /prof. corrado lo storto

Major difficulties Analysts who perform economic studies for a government agency sometimes fall into the trap of making the study based on just the disbursements and receipts for that particular agency or government body it represents. For example, a state or local government might rationalize that a particular project is justified if the federal government pays most of the cost, even though the project may be unjustified based on total costs and benefits. Engineering Economy/public activities/ 2005 /prof. corrado lo storto

Example Classification of benefits and costs related to the completion of a new toll road through a rural area having as a major goal to shorten the distance between two large communities: Engineering Economy/public activities/ 2005 /prof. corrado lo storto Benefits to Public - Reduced vehicle operating costs - Reduced commercial and non commercial travel time - Increased safety - Increased accessibility between communities - Ease of driving - Appreciation of land values

Example Engineering Economy/public activities/ 2005 /prof. corrado lo storto Disbenefits to Public - Land removed from agrucultural production - Damages resulting from changes of water flow - Decreased movement of livestock across highway - Increased air pollution and litter Cost to State - Construction costs - Maintenance costs - Administrative costs Savings to State - Toll revenues - Increased taxes due to appreciated land and increased business activity

Example : Problem 1 A county is considering installing a water treatment system that is expected to cause environmental and direct benefits of $ 1,000,000 per year for its inhabitants. The system would require an investment of $ 9,000,000 and have operating and maintenance costs of $ 300,000 per year for an expected life of 20 years, after which it would have no value. If money for this type of project costs the county 6%, is the project justified on an economic basis? Suppose the state government is willing to pay $ 4,000,000 of the investment. Now is it justified? Engineering Economy/public activities/ 2005 /prof. corrado lo storto

Example: Solution to problem 1 Using the net present worth method based on total benefits and costs, we get Thus, it is not justified in total. Based only on benefit and costs to the county: Thus, it is apparently justified to the county. It would be common for county decision makers to consider only the net PW = $ 3,029,000 on the county investment and conclude that the project must be worthwhile, never seriously considering that the net PW on the total investment is < $ 0. Engineering Economy/public activities/ 2005 /prof. corrado lo storto

Example: Solution to problem 1 This is the equivalent of considering the state’s money as free, which is sometimes rationalized on the basis that “… we ought to get it, bacause if we don’t some other agency or organization will.” Nevertheless, one should consider – in principle – the total benefits and costs to determine if the investment of state as well as county fund is justified. Engineering Economy/public activities/ 2005 /prof. corrado lo storto

Benefit-Cost Ratio Criterion If this BC ratio exceeds 1, the project can be justified Engineering Economy/public activities/ 2005 /prof. corrado lo storto

Definition of Benefit-Cost Ratio b n =Benefit at the end of period n, c n =Expense at the end of period n, A n = b n – c n N = Project life i =Sponsor’s interest rate (discount rate) Engineering Economy/public activities/ 2005 /prof. corrado lo storto

Breakdown of the Sponsor’s Cost Equivalent capital investment at n = 0 Equivalent O&M costs at n = 0 Engineering Economy/public activities/ 2005 /prof. corrado lo storto

Example of B-C Analysis $10 $5 $8 $20 $30 K = 1 N = 5 Benefits (b n ) Recurring costs (c n ) Investment (c n ) Engineering Economy/public activities/ 2005 /prof. corrado lo storto

Solution Engineering Economy/public activities/ 2005 /prof. corrado lo storto

Relationship between B/C Ratio and NPW B > (I + C’’) B – (I+ C’’) > 0 PW(i) = B – C’ > 0 Engineering Economy/public activities/ 2005 /prof. corrado lo storto

Incremental Analysis Based on BC(i) Engineering Economy/public activities/ 2005 /prof. corrado lo storto

Example 2: Incremental Benefit-Cost Ratios A1A2A3 I$5,000$20,000$14,000 B12,00035,00021,000 C’C’4,0008,0001,000 PW(i)$3,000$7,000$6,000 Engineering Economy/public activities/ 2005 /prof. corrado lo storto

Solution A1A2A3 BC(i) Ranking Base A1A3A2 I +C’$9,000$15,000$28,000 Engineering Economy/public activities/ 2005 /prof. corrado lo storto

Interest rate for government projects Three main choices for the interest rate to use in government economic studies are as follows: 1.borrowing rate 2.the opportunity cost to the governmental agency 3.the opportunity cost to the taxpayer Engineering Economy/public activities/ 2005 /prof. corrado lo storto

The borrowing rate In general, it is appropriate to use the borrowing rate only for cases in which money is borrowed specifically for the project under analysis and where use of that money will not cause other worthy projects to be foregone. Engineering Economy/public activities/ 2005 /prof. corrado lo storto

The opportunity cost It is the interest rate on the best investment opportunity foregone. If projects are chosen so that the return rate on alla accepted projects is higher than the return on any of the rejected projects, then the interest rate for use in the economic analysis is equal to the opportunity cost. If this is done for all projects and investment capital available within a government agency, then the result is a government opportunity cost. If, on the other hand, one considers the best opportunity available to the taxpayers if the money were not obtained through taxes for use by the government agency, the result is a taxpayers’ opportunity cost. Engineering Economy/public activities/ 2005 /prof. corrado lo storto

Comparing alternatives using benefit-cost analysis when receipts and disbursements are known: an example Lathe AB First cost$ 10,000$ 15,000 Life5 yr10 yr Salvage value$ 2,000$ 0 Annual receipts$ 5,000$ 7,000 Annual disbursements$ 2,200$ 4,300 Minimum attractive rate of return=8% Study period=10 yr Two alternatives lathes are considered in the analysis. Annual receipts are treated as annual benefits, while annual disbursements are treated as annual operating and maintenance costs. Engineering Economy/public activities/ 2005 /prof. corrado lo storto

Comparing alternatives using benefit-cost analysis when receipts and disbursements are known: solution to the example It is assumed that after 5 years lathe A will be replaced with another lathe having an identical cash flow profile. Hence, annual worths for individual life cycles can be used in computing the benefit-cost ratio. The first increment of investment (the $ 10,000 for lathe A) has a B/C of > 1. Hence, the increment of investment in lathe A is justified. The next step is to determine if the second increment of investment is justified. The simplest approach is to divide the difference in the annual worths of net annual benefits by the differences in capital recovery costs. For lathe B, Engineering Economy/public activities/ 2005 /prof. corrado lo storto

Comparing alternatives using benefit-cost analysis when receipts and disbursements are known: solution to the example For the second increment of investment, Since the modified B/C ratio for the increment of investment from lathe A to lathe B has a value less than 1, the increment cannot be justified and thus lathe A is recommended. Engineering Economy/public activities/ 2005 /prof. corrado lo storto

Comparing numerous alternatives using benefit-cost analysis when receipts and disbursements are known: example The following example shows 6 investment alternatives. Each alternative has a salvage value equal to the investment and there is no depretiation cost, and the incremental capital recovery cost equals the product of the MARR and the incremental investment: Alternatives ABCDEF Investment$ 1,000$ 1,500$ 2,500$ 4,000$ 5,000$ 7,000 Annual savings in cash disbursements $ 150$ 375$ 500$ 925$ 1,125$ 1,425 Salvage value$ 1,000$ 1,500$ 2,500$ 4,000$ 5,000$ 7,000 MARR = 18% Engineering Economy/public activities/ 2005 /prof. corrado lo storto

Summary A benefit-cost analysis is commonly used to evaluate public projects; Difficulties involved in public project analysis include the following: 1)Identifying all the users who can benefit from the project; 2)Identifying all the benefits and disbenefits of the project; 3)Quantifying all benefits and disbenefits in some money unit of measure; 4)Selecting an appropriate interest rate at which to discount benefits and costs to a present value; Engineering Economy/public activities/ 2005 /prof. corrado lo storto

Summary The B/C ratio is defined as: The decision rule is if BC(i) > 1, the project is acceptable. The net B/C ratio is defined as The net B/C ratio expresses the net benefit expected per dollar invested. The same decision rule applies as for the B/C ratio. Engineering Economy/public activities/ 2005 /prof. corrado lo storto