I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force As of:1 Value added with EVM for Senior Level Portfolio Management.

Slides:



Advertisements
Similar presentations
Program Assessment Briefing (PAB) Instructions Chart 1: Overview Provide a narrative mission description – Self explanatory Provide executive level program.
Advertisements

Connoizor Enabling Performance for Businesses through Software Website: Contact:
Replanning, Reprogramming, and Single Point Adjustments July NAVY CEVM
Module 8: Government Required Reports
N O T E “CLICK” TO CONTINUE… If the slide show is not launched, click on View  Slide Show in the menu bar at the top of the Power Point window. When the.
US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
1 Estimating Costs At Completion Review this tutorial and the Project Pyramid Exercise until you are fully comfortable with how to calculate an estimate.
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
Monitoring and Control Earned Value Management (EVM)
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 13 Progress and Performance Measurement and Evaluation.
Degree and Graduation Seminar Cost Management
Information Technology Project Management, Sixth Edition Note: See the text itself for full citations.
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Earned Value Management
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Project Management 6e..
CPM-400: xxx Lesson B: EV Data Analysis I Instructor Ellen Udell
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Eleanor Haupt Aeronautical Systems Center Lloyd Carter
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Validating IPMRs, CPRs, and IMS Deliverables NAVY CEVM
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 13: Progress and Performance Measurement and Evaluation
1 RELATIONSHIP-OBJECTIVE ANALYSIS Getting Full Value From Earned Value With a Value-Added Way of Looking at Performance Measurement Presented at the 14th.
Dave Bachman DAU / CDSC September 9, 2004
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Monitoring and Information Systems
EARNED VALUE MANAGEMENT (EVM)
Project Management Part 6 Project Control. Part 6 - Project Control2 Topic Outline: Project Control Project control steps Measuring and monitoring system.
EVM Home Page = = “One Book” DAU POC: (703) (DSN 655) Address: Revised.
1 Alternative EVM Applications Not a One-Size-Fits-All.
Project Cost Management
Mohawk Vehicle - MEGA HERZ ELEC & VEN - MOH-2 F C-0050 J:\CS40\Data Analysis\- Standard Analysis Package/Sample Standard Analysis Package.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Mohawk Vehicle - MOH-2 - F C EVM Quick-Look Report.
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
Project Management 6e..
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Where Module 04 : Knowing Where the Project Is 1.
EVM – Do You Really Know What the Numbers Mean? Booz | Allen |Hamilton Seth Huckabee EVP, PMP, PMI-SP.
0 Earned Value Management. 1  What is it?  Where did it come from?  What’s so special about it?  How do you do it?  What is an EVMS?
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
EVM Home Page = Address: DAU POC: (703) (DSN 655) Revised December 2006 TERMINOLOGY.
Schedule Control (Earned Value)
October 11, EARNED VALUE AND PERFORMANCE MANAGEMENT.
Agenda ‒ Cost Management ‒ Cost Budgeting ‒ Cost Control Learning Goals 1.Cost Control 2.Earned Value Management.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Project Monitoring
TOPIC-8B- PROJECT COST CONTROL
Project COST Management
CHAPTER:7 Project Cost Management
Chapter 7: Project Cost Management
IEVMC Lesson 8 FY14 Analysis Case Study Performance Management Analysis Tools Student guide page 8-5.
EVM 202—Lesson 7 Tools Analysis Case Study
Contract Performance Charts
September 2016 EVM 202—Lesson 8 Integrated Product Team (IPT) Analysis and Performance Case.
Earned Value Management
Earned Value - What is it
Dave Bachman DAU / CDSC September 9, 2004
EVM 202—Lesson 7 Tools Analysis Case Study
Earned Value Measures Planned Value (PV) Earned Value (EV)
MGT 605: CH-13 Progress and Performance Measurement and Evaluation
Missile Defense Agency EVM Update
Managing Project Work, Scope, Schedules, and Cost
Chapter 7: Project Cost Management
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Presentation transcript:

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force As of:1 Value added with EVM for Senior Level Portfolio Management LtCol Harold Ennulat Ellen Udell SAF/AQXR 18 Nov 2002

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Overview Roles and Responsibilities of SAF/AQX in the AF Budget Process Earned Value Reporting How Earned Value is used by AF Executives Conclusions

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Key Budget Functions of SAF/AQX Reviews financial execution & reallocates resources Manages all reprogramming for AF Modernization (RDT&E and Procurement) Orchestrates release of funds on OSD withhold Coordinates these actions with PEOs and MADs Provides expert assistance on AF, OSD, and Congressional financial policies and laws Works With other Headquarters functionals to ensure program funding direction is in compliance with Congressional, OSD, and AF guidance Manages budget documentation process RDT&E, Procurement mods and initial spares

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Modernization Account Status Modernization / Procurement / RDT&E PBs (BY02$) FY85 $66B 49% $49B 36% FY87 $18B 15% FY97 $20B 30% $10B 15% FY02 FY75 $23B 30% $14B 18% FY74 $9B 12% Year $B % Blue TOA $25.9B 33% $15.6B 20% $10.4B 13% One of every three dollars goes to AF Modernization

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Earned Value Reporting Monthly Acquisition Report (MAR) Monthly Report to SAF/AQ Must report for all programs (new policy) Use estimated percentages for non-earned value contracts Primary input – cost and schedule variance chart Defense Acquisition Executive Summary (DAES) Quarterly Report to OSD for MDAP/ACAT I Programs Required Quarterly Section 7 - Supplemental Contract Cost Information Must report for non-FFP contracts receiving EVM data Primary input – CPR Header and Summary data points

I n t e g r i t y - S e r v i c e - E x c e l l e n c e MAR Purpose Quick-look assessment of program health to SAE Identifies need for HQ involvement Focus on Issue, Impact, Way-Ahead Provides ready reference of current information HQ data source for cross-program analysis Used for analysis of contractor mgmt, systemic cost growth drivers, etc Provides historical reference and basis for consistency in other reports (DAES, SAR, AFPMRS) Building block for AQ Integrated Digital Environment

PROGRAM NAME Program Short Name ACAT: Phase: Description: Monthly Acquisition Report MONTH YEAR G G G Y Y Y R R R ISSUE: Describe Issue causing yellow or red IMPACT: - Assess specific programmatic impact - Limit to two or three bullets WAY AHEAD: - List actions being taken or planned Issue Category Y R G Y Y OVERALL KPP Issue Category COSTSCHED Issue Category FUND Issue Category ISSUE: Describe Issue causing yellow or red in no more than two lines (14 pt) IMPACT: - Assess specific programmatic impact - Limit to two or three bullets WAY AHEAD: - List actions being taken or planned - Include what, when, expected affect - Any action requiring SAE or other participation should be identified (SAE) ISSUE: Describe Issue causing yellow or red IMPACT: - Assess specific programmatic impact - Limit to two or three bullets WAY AHEAD: - List actions being taken or planned ISSUE: Optional when rated green ISSUE: Describe Issue causing yellow or red IMPACT: - Assess specific programmatic impact - Limit to two or three bullets WAY AHEAD: - List actions being taken or planned Other Information: (Optional) - Use bullets - Include information on current significant accomplishments, including action, date, and affect - Further clarify issue(s) raised in the above assessment section - Identify issues/concerns not contained above such as future-year funding, contract issues, unit cost concerns, etc. Acronyms: Spell out program specific acronyms here Program Assessment Chart

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Data Page Focus on information Provides the basis for assessing health Allows multiple graphs to be produced as needed Four Sections Contract Performance (Earned Value) Classic Cost and Schedule Variances Trend Chart Provides Graphical Representation of Cumulative cost Variance, Schedule Variance, Management Reserve All underlying data is also available Schedule Upcoming major milestones Technical Performance Exception Based: Only report KPPs that are Yellow or Red Funding Status by appropriation account Authority, Release, Obligations and Expenditures

PEO:Brig Gen Name AFPEO/XXXX DSN: SPD:SPD Name Office Symbol DSN: PROGRAM NAME Month Year Performance (KPP) (Unclassified & By Exception) Funding ($M) Contract Performance Program Schedule MS-C DAB / 31 Aug 01 / (SAE / DAE) Prod Contract Award / 1 Sep 01 First Edwards AFB / 5 Dec 01 KPP: Obj: Thresh: Est: KPP: Obj: Thresh: Est: Syst Weight 52 Lbs 58 Lbs 60 Lbs (Ob/Exp: SPO as of Mar) Program Data Chart

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Earned Value Analysis from DAES Input Usually on Cost Plus type contracts over $6M Primary purpose of SAF/AQXR analysis is to determine an independent completion cost estimate Based on cost and schedule performance to date Compare to Contract Value less Fee (Contract Budget Base) Compare to Contractor’s and PM’s completion estimate May also highlight cost and schedule variance issues Only addresses contract performance, not total program

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Traditional Contract Performance Chart 3 ideas on chart: Changes to the contract Changes to the Estimate Performance Data 3 ideas on chart: Changes to the contract Changes to the Estimate Performance Data

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Variances Graph Purpose: Early warning of funding problems Compares cost & schedule variances within a +/- 10% control limit. Also plots use of management reserve Primary value: Expect cost and schedule variances to be within the 10% variance bands. If overrunning at 15-20% complete -- will finish that way CV% will not improve by more than 10% (10% Rule) Secondary value: Track Management Reserve Usage Early use of MR may suggest poor planning, and masks CV Secondary value: Estimate variance at completion: Straight Line Method: extrapolate the CV to the completion time to determine the potential overrun Tertiary value: shows re-baselines Resetting of CV and SV to 0 (saw tooth effect)

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Example: MOH-2 Cost and Schedule Variance Trends Dollars In Millions Cost/Schedule Variance Trends F C-0010 RDTE CPAF Contractor: Mega Hertz Contract: MOH-2 Program: AS OF: OCT 01 Cost Variance1.8 Schedule Variance-1.2 Management Reserve7.3 10% Thresholds Start/Comp Dates Cost Var Completion PO-33.1 CTR StartComplete

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Performance Review Cost and schedule efficiency (Compared to plan) Significant Problems Developing Problems Efficiency Adequate Performance Cost Schedule -$428K -$499K Baseline: $20,796.2K (w/out fee) Completion Estimate: $20,761.0K % Complete: 33 % Spent : 35 Baseline: $20,796.2K (w/out fee) Completion Estimate: $20,761.0K % Complete: 33 % Spent : 35 Contract: MOH-2 Ktr: Mega Hertz (CPAF) as of Jan 93

I n t e g r i t y - S e r v i c e - E x c e l l e n c e EAC Graph Purpose: Tests realism of completion estimates Compares baseline Budget at Completion (BAC) to Contractor's Estimate at Completion (EAC) using Cumulative CPI as a control measure Primary value: EAC should be at or above Cum CPI Statistically, Cum CPI forecast represents the LOWEST cost at which a contract will complete EAC’s below Cum CPI should be questioned for believability Secondary value: Does contract have enough money? If contract is experiencing unrecoverable costs, EAC should be higher than BAC Additionally, BAC’s lower than Cum CPI indicate need for money

I n t e g r i t y - S e r v i c e - E x c e l l e n c e EAC Graph Another realism test for completion estimates is TCPI vs CPI TCPI and CPI should be within 5% of each other for a believable Completion Estimate. If differ by more than 10% the Estimate is underestimated TCPI can be based on both the Budget or the Estimate TCPI: To-Complete Cost Performance Index TCPI is an indicator of how efficient the contractor needs to be from now on in order to finish the contract at the BAC or EAC. Since CPI reflects the historical efficiency, it is very difficult to make large changes between the two. TCPI: To-Complete Cost Performance Index TCPI is an indicator of how efficient the contractor needs to be from now on in order to finish the contract at the BAC or EAC. Since CPI reflects the historical efficiency, it is very difficult to make large changes between the two. BAC - BCWP EAC - ACWP TCPI = TCPI is the CPI of the remaining work

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Traditional Cost Variance/EAC Analysis Chart (CPI Chart) Useful data to predict whether the contract will come in at estimate.

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Traditional EAC Realism Chart (EAC Chart Modified to Include Cum CPI) Useful data to assess the believability of the PM or Contractor’s estimate to complete.

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Confidence in Contract Value Will contract complete at baseline value? Cost Over Run Potential Cost Over Run Potential Cost Under Run ( ) CPI CUM TCPI BAC 1x 100 Percent Difference Current Efficiency / Required Efficiency Acceptable Baseline: $20,796.2K (w/out fee) Completion Estimate: $20,761.0K % Complete: 33 % Spent : 35 Baseline: $20,796.2K (w/out fee) Completion Estimate: $20,761.0K % Complete: 33 % Spent : 35 Contract: MOH-2 Ktr: Mega Hertz (CPAF) as of Jan 93

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Confidence in Estimate Will contract complete at contractor’s current estimate? No Confidence Questionable ( ) CPI CUM TCPI EAC 1x 100 No Confidence Percent Difference Current Efficiency / Required Efficiency Acceptable Baseline: $20,796.2K (w/out fee) Completion Estimate: $20,761.0K % Complete: 33 % Spent : 35 Baseline: $20,796.2K (w/out fee) Completion Estimate: $20,761.0K % Complete: 33 % Spent : 35 Contract: MOH-2 Ktr: Mega Hertz (CPAF) as of Jan 93

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Alternate Confidence Chart

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Expected Completion Estimate Comparison of Contract Budget Baseline (CBB) to Contractor, PM and SAF/AQXR Completion Estimates CBB = Contract Value less Fee May include Over Target Baseline (OTB) data Exception basis for contracts with large cost overruns to date For Earned Value purposes only, the value of the Work Plan is set higher than the CBB. Not a contractual change Remaining work is replanned and cost and schedule variances usually reset to 0 Definite contract cost overrun of at least the OTB amount If root cause not corrected, overrun could be even higher

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Example: B-1 CMUP DSUP - Expected Completion Estimate Contract Budget Baseline: Mega Hertz Estimate: PM Estimate: AQXR Low: AQXR High: % Complete: 33 $20.8M $20.7M $22.0M* $22.4M $23.1M $20$22 $24 * PM’s estimate includes all items currently on contract, as well as estimated additional costs for future contract modifications expected due to GFE delays and reduced raw materials availability. Mega Hertz and AQXR estimates include only those items currently on contract.

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Sample Program - EVMS Issues Cost variance trend continues to degrade Contractor and SPO completion estimates statistically unrealistic. Completion estimates assume remaining work will be performed at a cost efficiency of 1.04 Historical Cost efficiency To date = month avg = 0.951, 6-month avg = Work remaining = $13.9M Cost to complete estimate = $13.4M AQXR Questions: Contractor has historically performed all work at higher cost than planned Completion estimate assumes all remaining work can be completed for less than planned costs Assuming the estimates are realistic, and all cost variances to date are unrecoverable, what measures are in place to complete the remaining $13.9M of work for $13.4M?

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Portfolio Evaluation XX Portfolio Pgm A Pgm B Pgm C MOH-2 Pgm E Pgm H Pgm F Pgm G Pgm A Pgm B Pgm C MOH-2 Pgm E Pgm H Pgm F Pgm G Ahead Of Sched Cost Overrun Ahead Of Sched Cost Underrun Behind Sched Cost Overrun Behind Sched Cost Underrun Pgm A Pgm B Pgm C MOH-2 Pgm E Pgm F Pgm G Pgm H PM Action PEO Action SAE Action

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Historical Performance

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Other Uses for EV Crosscut Analysis Evaluate management between portfolios Evaluate management between contractors Identify Systemic Management Problems Poor Cost Estimating Requirements Creep Funding Instability Technical Risk Economic Assumptions Poor Management (Uncontrolled cost/schedule growth)

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Conclusion: Role of Earned Value in Portfolio Management Place importance on solid program management Baseline management is key Why should I believe your EAC? What is the biggest impediment on your critical path? Impact of Contract Performance (Earned Value) on funding Will this program create either a bill (overrun) or source (underrun) for current year execution? Programmatic decisions are based on historical data, latest Earned Value data and Obligations & Expenditures Executives Role: Drive Organizational Behavior – Earned Value helps!