Hydrologic Design Reading: Applied Hydrology Sections 13-1, 13-2.

Slides:



Advertisements
Similar presentations
Flood Risk Analysis – the USACE Approach
Advertisements

Introduction to modelling extremes
WFM-6204: Hydrologic Statistics
Hydrologic Statistics Reading: Chapter 11, Sections 12-1 and 12-2 of Applied Hydrology 04/04/2006.
Probabilistic Analysis of Hydrological Loads to Optimize the Design of Flood Control Systems B. Klein, M. Pahlow, Y. Hundecha, C. Gattke and A. Schumann.
Quantity of Water and Wastewater CE 547. Probability Quantity of Water Types of Wastewater Sources of Wastewater Population Projection Deriving Design.
4 th International Symposium on Flood Defence Generation of Severe Flood Scenarios by Stochastic Rainfall in Combination with a Rainfall Runoff Model U.
Sensitivity Analysis In deterministic analysis, single fixed values (typically, mean values) of representative samples or strength parameters or slope.
Hydrologic Statistics
Water Resources Planning and Management Daene C. McKinney River Basin Modeling.
Engineering Economic Analysis Canadian Edition
I am sure you have heard about the farmer in Sidell, Illinois. After that fiasco with the cheese being left standing alone taking the blame for polluting.
Hydrologic Design and Design Storms Venkatesh Merwade, School of Civil Engineering, Purdue University Some slides are taken from Dr. David Maidment, University.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering Reservoirs Balancing Supply and Demand Ashokan Kensico Hillview Croton Reservoir Spillway.
Precipitation statistics Cumulative probability of events Exceedance probability Return period Depth-Duration-Frequency Analysis.
WFM 5201: Data Management and Statistical Analysis
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering Reservoirs Balancing Supply and Demand Ashokan Kensico Hillview Croton Reservoir Spillway.
Statistics and Probability Theory Prof. Dr. Michael Havbro Faber
Balancing Supply and Demand
Hydrologic Design and Design Storms
Kansas City Industrial Council Hydrology and Hydraulics
Water Management Presentations Summary Determine climate and weather extremes that are crucial in resource management and policy making Precipitation extremes.
Analyses of Rainfall Hydrology and Water Resources RG744
Flood Frequency Analysis
Water Resources Planning and Management Daene C. McKinney Simulating System Performance.
History and Evolution of the PMP/PMF
Reliability Analysis Procedures for Infrastructure Facilities Andrzej S. Nowak University of Nebraska - Lincoln Outline  Causes of Uncertainty  Load.
Hydrologic Design and Design Storms Readings: Applied Hydrology Sections /18/2005.
Estimation of Areal Precipitation from point measurements Most often interested in quantifying rainfall over an entire watershed. Has to be inferred from.
I am sure you have heard about the farmer in Sidell, Illinois. After that fiasco with the cheese being left standing alone taking the blame for the failure.
Extreme Value Analysis What is extreme value analysis?  Different statistical distributions that are used to more accurately describe the extremes of.
WFM 5201: Data Management and Statistical Analysis © Dr. Akm Saiful IslamDr. Akm Saiful Islam WFM 5201: Data Management and Statistical Analysis Akm Saiful.
CE 3354 ENGINEERING HYDROLOGY Lecture 6: Probability Estimation Modeling.
IRP Approach to Water Supply Alternatives for Duck River Watershed: Presentation to XII TN Water Resources Symposium William W. Wade Energy and Water.
FREQUENCY ANALYSIS.
Frequency Analysis and Data Reading: Applied Hydrology Sections
Engineering Economic Analysis Canadian Edition
Hydrologic Design Storms
CE 424 HYDROLOGY 1 Instructor: Dr. Saleh A. AlHassoun.
Engineering Hydrology (ECIV 4323)
Extreme values and risk Adam Butler Biomathematics & Statistics Scotland CCTC meeting, September 2007.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
Design Storms CE 365K Hydraulic Engineering Design Spring 2015.
1 / 12 Michael Beer, Vladik Kreinovich COMPARING INTERVALS AND MOMENTS FOR THE QUANTIFICATION OF COARSE INFORMATION M. Beer University of Liverpool V.
Hydraulics is defined as the study of fluid behavior, at rest and in motion Properly designed piping with sound hydraulics can: - Greatly reduce maintenance.
From Fread, D.L., Flood routing models and the Manning n.
CE 3354 ENGINEERING HYDROLOGY Lecture 6: Probability Estimation Modeling.
Uncertainty and Reliability Analysis D Nagesh Kumar, IISc Water Resources Planning and Management: M6L2 Stochastic Optimization.
Water Resources Planning and Management Daene C. McKinney System Performance Indicators.
MRC-MDBC STRATEGIC LIAISON PROGRAM BASIN DEVELOPMENT PLANNING TRAINING MODULE 3 SCENARIO-BASED PLANNING for the MEKONG BASIN Napakuang, Lao PDR 8-11 December.
Narnarayan Shashtri Institute of Technology SUBJECT :– HYDROLOGY AND WATER RESOURCES ENGINEERING TOPIC :-HYDROLOGIC ANALYSIS GROUP MEMBER Patel Darshak.
CRFS Technical Meeting LC Operations Update November 14, 2012.
UNIT – III FLOODS Types of floods Following are the various types of floods: 1.Probable Maximum Flood (PMF):This is the flood resulting from the most sever.
Predicting the hydrologic implications of land use change in forested catchments Dennis P. Lettenmaier Department of Civil and Environmental Engineering.
Analyses of Rainfall Hydrology and Water Resources RG744 Institute of Space Technology October 09, 2015.
Application of Extreme Value Theory (EVT) in River Morphology
Supplementary Chapter B Optimization Models with Uncertainty
Hydrological Statistics
Extreme Events Extreme events are defined as “most unusual” climatic events at a given place (natural and anthropogenic causes) “Most unusual” can be.
Engineering Hydrology (ECIV 4323)
Flood Frequency Analysis
Hazards Planning and Risk Management Flood Frequency Analysis
Statistics & Flood Frequency Chapter 3 – Part 1
Detention Pond and Channel Stabilization for Bartholomew Park
Hydrologic Statistics
Flood Frequency Analysis
Floods and Flood Routing
Engineering Hydrology (ECIV 4323)
1. Engineering Hydrology by H.M. Raghunath
Engineering Hydrology (ECIV 4323)
Presentation transcript:

Hydrologic Design Reading: Applied Hydrology Sections 13-1, 13-2

2 Hydrologic design Water control – Peak flows, erosion, pollution, etc. Water management – Domestic and industrial use, irrigation, instream flows, etc Tasks – Determine design inflow – Route the design inflow – Find the output check if it is sufficient to meet the demands (for management) Check if the outflow is at safe level (for control)

3 Hydrologic design scale Hydrologic design scale – range in magnitude of the design variable within which a value must be selected Design considerations – Safety – Cost Do not design small structures for large peak values (not cost effective) Do not design large structures for small peak values (unsafe) Balance between safety and cost.

4 Estimated Limiting Value (ELV) Lower limit on design value – 0 Upper limit on design value – ELV ELV – largest magnitude possible for a hydrologic event at a given location, based on the best available hydrologic information. – Length of record – Reliability of information – Accuracy of analysis Probable Maximum Precipitation (PMP) / Probable Maximum Flood (PMF)

Probable Maximum Precipitation Most recent report 1999

6

7 TxDOT Recommendations

8 Hydrologic design level Hydrologic design level – magnitude of the hydrologic event to be considered for the design or a structure or project. Three approaches for determining design level – Empirical/probabilistic – Risk analysis – Hydroeconomic analysis

9 Empirical/Probabilitic P(most extreme event of last N years will be exceeded once in next n years) P(largest flood of last N years will be exceeded in n=N years) = 0.5 Drought lasting m years is worst in N year record. What is the probability that a worse drought will occur in next n years? – # sequences of length m in N years = N-m+1 – # sequences of length m in n years = n-m+1

10 Example If the critical drought of the record, as determined from 40 yrs of data, lasted 5 yrs, what is the chance that a more severe drought will occur during the next 20 yrs? Solution: N = 40, m = 5 and n = 20

11 Risk Analysis Uncertainty in hydrology – Inherent - stochastic nature of hydrologic phenomena – Model – approximations in equations – Parameter – estimation of coefficients in equations Consideration of Risk – Structure may fail if event exceeds T–year design magnitude – R = P(event occurs at least once in n years) Natural inherent risk of failure

12 Example Expected life of culvert = 10 yrs Acceptable risk of 10 % for the culvert capacity Find the design return period What is the chance that the culvert designed for an event of 95 yr return period will have its capacity exceeded at least once in 50 yrs? The chance that the capacity will not be exceeded during the next 50 yrs is = 0.59

13 Hydroeconomic Analysis Probability distribution of hydrologic event and damage associated with its occurrence are known As the design period increases, capital cost increases, but the cost associated with expected damages decreases. In hydroeconomic analysis, find return period that has minimum total (capital + damage) cost.

14