75 Express Lanes Project From NW 170 Street to I-595 Corridor Advisory Committee Meeting Wednesday, July 15.

Slides:



Advertisements
Similar presentations
Click to edit Master title style »Click to edit Master text styles –Second level Third level –Fourth level Fifth level Construction Update 11/13/2012 Larry.
Advertisements

Some things cant wait for traffic Capital Beltway HOT Lanes Project Update – January 2011 New Travel Choices Ahead.
Some things cant wait for traffic Capital Beltway HOT Lanes Project Fairfax County TAC Update – August 16, 2011 New Travel Choices Ahead.
Capital Beltway HOT Lanes Project Project Update March 2009.
Capital Beltway HOT Lanes Project Project Update April 2009.
Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
I-96 Reconstruction/Bridge Repair Project City of Livonia and Redford Township Wayne County May 10, 2013 Association of the Council of Western Wayne Yankee.
Titusville to Edgewater Bike Loop PD&E Study
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
Corridor-Wide Construction Presentation to FDOT Materials Lab
Fountaingrove Parkway Summary of Recommendations November 27, 2007.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.
WELCOME! October 28, 2013 ODOT District 1 & District 2.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Riverside County Transportation Commission 91 Project Update California Transportation Commission December 10, 2014.
FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland.
Conference Center of the Americas US SOUTHERN COMMAND
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Redwood Road & 35th Avenue Traffic Study. Problems Observed: High collision rate along the corridor was found at McArthur Boulevard intersection, with.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
April 6, 2015 I-4 Ultimate Project Overview. Agenda Overview of I-4 Ultimate How to stay informed Studies and communication Responses to questions provided.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
I-65 Added Travel Lanes Project in Tippecanoe County
75 Express Lanes Segments A&B Construction From NW 170 Street to South of Miramar Parkway Community Meeting Presentation Tuesday April 28, 2015.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
Less Stop More Go EXPRESS LANES Travel Choices and Strategies to Relieve Congestion Presentation to FDOT’s Annual ITS Working Group Meeting March 2008.
The Miami Intermodal Center September 23, 2009 Is Becoming a Reality!
Transpo 2012 The Future of Traffic Incident Management, October 30, 2012 Javier Rodriguez, P.E., ITS Operations Engineer Joe Snyder, TMC Manager FDOT District.
Current Construction Projects Major Projects Pinellas County.
What are Managed Lanes What are Express Lanes What are HOT Lanes Regional Express Lanes Network I-95 Express I-595 Express I-75 Express.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
75 Express Lanes Project From NW 170 Street to I-595 TIM Meeting Wednesday, September 2.
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Project Update: Airport Freeway, I-820 and I-35W Townhall Meeting for State Representatives Stephanie Klick and Jonathan Stickland Monday, May 12.
Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve B) to US-19 North of SR 688/Ulmerton.
Park Lane ZOM Location Map. Park Lane ZOM Aerial.
I-495 NORTHERN SECTION SHOULDER USE PROJECT State Project No , P101, C501 CITIZEN’S INFORMATION MEETING UPC NOVEMBER 19, 2013.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
I-15 Express Lanes Project January 2012 I-15 Express Lanes Project January 2012.
Premium Transit District 4, Office of Modal Development Making the Connection.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
Program Manager Administrator
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.
I-465 at I-65 Interchange Modification Public Meeting 6 p.m., Thursday, August 14 South Grove Intermediate School, Beech Grove, IN.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
I-225 Rail Line Chuck Culig, Project Manager Tuesday, April 2, 2013 RTD Board of Directors Update.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
Project Status Update I-680 Southbound HOV Gap Closure Project Environmental Phase September 2011 PARSONS.
US26: Cornelius Pass Rd -185th Ave
Citrus Park Drive Extension
Florida Transportation Commission FY 2009
Contract 60X10 Informational Meeting Weber I-55
Harbour Island Force Main Replacement
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
Metropolitan District | mndot.gov
Presentation transcript:

75 Express Lanes Project From NW 170 Street to I-595 Corridor Advisory Committee Meeting Wednesday, July 15

Project Team I-75 Express Fiorella Alvarez- Construction Public Information Officer Antonio Castro, P.E. – FDOT Construction Project Manager Paul Lampley, P.E. – FDOT Construction Program Manager Raj Rangaswamy, P.E. – CEI Senior Project Engineer, Target Engineering Yami Yaqub. – CEI Project Administrator, Target Engineering Ed Perez, P.E. – CEI Senior Project Engineer, Corradino Group Aurelio Matos, P.E. – CEI Senior Project Engineer, APCTE Scott Gombar, P.E. – CEI Senior Project Engineer, Eisman and Russo

State Road (SR) 826 from W. Flagler Street to I-75 and I-75 from SR 826 to I-595 (Total 28 miles) D4 Segment : I-75 from NW 170 Street to I-595 (15 miles) D6 Segment: SR 826 from W Flagler Street to NW 154 Street and I-75 from SR 826 to NW 170 Street (13 miles) Projects Limits

I-75 Express Overview From NW 170 Street (Miami-Dade County) to I-595 (Broward County) I-75 Express Project Limits

Scope of Work Constructing Express Lanes in the existing I-75 median Constructing ingress and egress points throughout the corridor Constructing direct connections to 595 Express, Palmetto Express and Homestead Extension of Florida’s Turnpike (HEFT) Reconstructing interchanges along the corridor Constructing sound barrier walls at various locations Installing additional traffic cameras, dynamic message signs and toll gantries Adding new signals, signage, lighting and landscaping I-75 Express Corridor wide

75 Express Lanes Typical Section Express Lanes – Centered in existing I-75 median Separated from the General Purpose Lanes – Two northbound and two southbound lanes Separated by concrete barrier wall – Full width paved shoulders I-75 Express

Express Lanes Entrance & Exit Ramps NOT TO SCALE I-75 Mainline I-75 Express

75 Express Lanes Entrance and Exit ramps I-75 Express Please visit our webpage to download the Entrance and Exit ramps guide

Segment E Overview Estimated construction completion date: Summer 2017 Construction cost: $75 million CEI: Target Engineering Group, Inc. Design-Build Team: Dragados USA/Parsons Brinckerhoff I-75 Express From North of Griffin Road to I-595

Segment E Construction update Current activities Building future Express Lanes in the existing median Excavating ponds for future drainage Building new bridge to connect 75 Express to 595 Express Installing drilled shafts for sign structures Future activities Complete and paint sound barrier walls Continue new bridge construction Build Express Lanes in the existing median

Connection Bridge to 595 Express Lanes

Upcoming Ramp Closures for Bridge Construction The ramp from southbound I-75 (from Naples) to eastbound 595 Express Lanes will be closed on Friday, July 24 is scheduled to reopen in summer Motorists will be able to access the 595 Express Lanes at the next entrance ramp on eastbound I-595, just west of 136 Avenue. The ramp from westbound 595 Express to I-75 northbound (to Naples) will be relocated to its final configuration, just north of the existing temporary ramp. Message boards will be placed to direct motorists to the new ramp location.

Segment D Overview Estimated construction completion date: Summer 2018 Construction cost: $80 million CEI: Target Engineering Group, Inc. Design-Build Team: Ranger Construction/Wantman Group I-75 Express From South of Sheridan Street to North of Griffin Road

Segment D Construction update Current activities Constructing sound barrier walls Sheridan Street Bridge Phase 1 construction Excavating ponds Future activities Full Closure of I-75 at Sheridan Street in July Sound barrier wall panel installation Drainage activities along segment Continue building Express lanes in existing median

New Improvement Features C-11 Canal Bridge I-75 Express

Sheridan Street Interchange I-75 Express

Upcoming Closures for Sheridan Bridge Construction All lanes of southbound I-75 at Sheridan Street will be closed on Thursday, July 30 to allow crews pour concrete bridge deck. Motorists will be detoured to take the exit ramp at Sheridan Street West (Exit 11B), continue westbound on Sheridan Street then turn left at Dykes Road and continue to eastbound Pines Boulevard to re-enter I-75 southbound using the Pines Boulevard on-ramp. Please follow the posted detour. All lanes of I-75 northbound at Sheridan Street will be closed on Monday, August 10 to allow crews pour concrete bridge deck. Motorists will be detoured to take the exit ramp at Sheridan Street East (Exit 11A), continue eastbound on Sheridan Street then turn left at Flamingo Road, then continue north to Griffin Road and continue westbound on Griffin Road to re-enter I-75 northbound using the Griffin Road on-ramp. Please follow the posted detour.

Segment C Overview Estimated construction completion date: Summer 2018 Construction cost: $85 million CEI: A&P Consulting Transportation Engineers Design-Build Team: Ranger Construction/Wantman Group I-75 Express From South of Miramar Parkway to South of Sheridan Street

Segment C Construction update Current activities Continuing new Pembroke Road bridge construction Continuing Miramar Parkway Bridge phase 2 construction Excavating ponds at Miramar Parkway and Pines Blvd Building future Express Lanes within existing median Constructing swale areas on the outside Completed all sound barrier wall construction Future activities Miramar Parkway Bridge phase 3 construction Continue new Pembroke Road bridge construction Anticipated bridges completion by late 2016 C-4 Canal crossing construction within existing median

Miramar Parkway Bridge Construction update Current Status Phase 1 completed Eastbound traffic detoured to newly constructed section Phase 2 started - demolition of existing eastbound bridge completed and pile operations commenced Future activities New end bents and piers construction

Phase One: Constructing a portion of the new bridge, south of the existing bridge. Miramar Parkway Interchange Construction Phasing I-75 Express EASTBOUND WESTBOUND NOT TO SCALE WORK ZONE

Phase Two: Shifting eastbound traffic onto the new bridge section constructed in Phase One, demolition of the eastbound section of the existing bridge, and construction of the middle section of the new bridge. Miramar Parkway Interchange Construction Phasing I-75 Express EASTBOUND WESTBOUND NOT TO SCALE WORK ZONE

Miramar Parkway Bridge – Phase 2 Demolition

Phase Three: Shifting westbound traffic onto the new bridge middle section constructed in Phase Two, demolition of the westbound section of the existing bridge, and construction of the final section of the bridge. Miramar Parkway Interchange Construction Phasing I-75 Express EASTBOUND WESTBOUND NOT TO SCALE WORK ZONE

Phase Four: Stripe lanes to final configuration. Miramar Parkway Interchange Construction Phasing I-75 Express EASTBOUND WESTBOUND NOT TO SCALE

Pembroke Road Bridge Construction update Current Status All concrete piles have been driven Constructed intermediate bridge piers MSE wall on east and west side under construction Broward County constructing bridge approaches Future activities Broward County complete bridge approaches Completion of bridge end bents Erect beams and pour bridge decks Anticipated bridge completion by late 2016

Pembroke Road Bridge

Segments A & B Overview Estimated construction completion date: Spring 2019 Construction cost: $234 million CEI: The Corradino Group Design-Build Team: Community Asphalt/Wantman Group I-75 Express From NW 170 Street (Miami-Dade County) to South of Miramar Parkway

Segments A&B Construction update Current activities Constructing Snake Creek canal bridge Excavating ponds along segment Building Express Lanes within existing median Clearing vegetation along several communities Future activities Complete sound barrier wall installation Continue Express Lanes bridges and ramps Continue building Express lanes in existing median

Snake Creek canal bridge

Proposed I-75/HEFT Interchange I-75 Express Northbound Turnpike to Northbound I-75Southbound I-75 to Southbound TurnpikeSouthbound I-75 Express to Southbound TurnpikeSouthbound I-75 to Northbound TurnpikeSouthbound Turnpike to Southbound I-75 & Miami Gardens DriveSouthbound Turnpike to Northbound I-75Southbound Turnpike to Northbound I-75 ExpressNorthbound I-75 to Northbound TurnpikeMiami Gardens Drive to Northbound TurnpikeNorthbound Turnpike to Northbound I-75 Express Existing Movement to RemainNew MovementExisting Movement to RemainNew Movement N

Ground Mounted Sound Barrier Walls To be completed by 2017 Direct coordination with affected communities Hours of construction – Daytime work only – No weekend work I-75 Express

Shoulder Mounted Sound Barrier Walls Shoulder mounted Sound Barrier Walls Completed with roadway construction Direct coordination with affected communities I-75 Express

Sound Barrier Wall Location Segment E Benefited communities Highland Ranch Estates New River Estates Woodgate Condos Vista Filare Royal Palm Forest Oak I-75 Express

Sound Barrier Wall Location Segment D Benefited communities Sheridan Glen The Crossbow Waverly Hundred Falcon’s Lea Waterford Hawkes Bluff Ivanhoe Estates Chelsea I-75 Express

Sound Barrier Wall Location Benefited communities Windsor at Miramar Villas at Nautica Cobblestone Townhomes Towngate Segment C I-75 Express

Sound Barrier Wall Locations Benefited communities Royal Landings West Lakes Estates Century Gardens Lakes on the Green Marbella Park West Riviera Isles Huntington Courtyards at Nautica Segments A & B I-75 Express

What to Expect Lane closures during non-peak hours Signage will be placed to guide motorists Public Information updates via electronic mail, postcards and project website Heavy equipment and construction crews in and around area Trucks and construction vehicles entering and exiting the work zones I-75 Express

Projected Express Lane Openings Partial Express Lanes Opening (North of Griffin Rd to I-595) in Spring 2017 Full Express Lanes Opening (NW 170 th Street to I-595) in Summer 2018 Construction Completion in Spring 2019 Construction Schedule I-75 Express

Stay Informed Sign up for Construction Updates and Lane Closure Information: I-75 Express Project Public Information Officer Fiorella Alvarez (954) Next Corridor Advisory Meeting will be on Wednesday, August 26 at 10 a.m. I-75 Express

For more information please visit our website at Stay Informed

We welcome your questions. I-75 Express