SENIOR DESIGN PROJECT by Tal Wigdor Standard Setup Procedures for OKUMA CNC Lathe Machine at BFGoodrich, Inc.
Table of Contents Project Objective Problem Description Development of Setup Standard Setup & Setup Time Table Recommendation
Project Objective Develop standard setup procedures for an OKUMA CNC.
No standardized setup time Variability between setup times Different methods of setup Experienced operator Problem Description
Development of Setup Understand the procedures of the machine shop Collect data Create step by step procedures Standardize the setup process Document the setup process Time measurement
Standard Setup & Setup Time Table Obtain proper parts to be machined Install the segments Inspect and reset zero Time Table
Recommendations Appropriate training Safety seminar Safety precautions Reduce setup time Implicate setup procedures Reduce amount of separate setups
Finally Any Questions ?