SENIOR DESIGN PROJECT by Tal Wigdor Standard Setup Procedures for OKUMA CNC Lathe Machine at BFGoodrich, Inc.

Slides:



Advertisements
Similar presentations
Basic safety rules and procedures for controlling hazardous energy
Advertisements

2 Careers in Machining Technology Chapter Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives List the.
2 3 There are two basic areas where there is a need to have resources available. Internal:  Financial  Personnel  Assets  Time External  Consultants.
AG Mech Safety Skills. Objectives To understand the safety skills used in AG Mech. To understand the safety skills used in AG Mech. To understand the.
Driver Inservice Child Safety Restraint Systems on School Buses.
EDEXCEL LEVEL 2 BTEC FIRST DIPLOMA FOR ICT PRACTITIONERS
State Machine Design Procedure
1 HYDROSTATIC TESTING Approved for Public Release.
Be prepared before it happens!! Have procedures and policies in place before you have to respond to a retrieval. Training- Have personnel that are.
Welcome to Finger Lakes Conveyors Located on Route 414, in Waterloo, New York Introduction Shop Tour Shop Tour Welding Assembly Machining Engineering.
By: Keith Fitzsimmons IE 500 Final Project – Fall 2014 Lathe Maintenance Ontology (LMO)
1 THAI TOKO ENGINEERING CO.,LTD. Safety management procedure.
McGraw-Hill/Irwin McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Final Report Document. Format Title Page Executive Summary Table of Contents Introduction Mission Statement Main PDS items Brief justification of the.
Who Wins The Ironman? Best Swimmer, Cyclist, or Runner A Project Demonstration by Dr. Moffit.
Human Resource Auditing
Training Needs Analysis
Computer-Controlled Machine Tool Operator, Metal Lab 1: Employment & Skills Overview.
1 times table 2 times table 3 times table 4 times table 5 times table
Fabrication II By Ryan Sharp and Andrew Keisic. Topics How to machine a simple part. Things to Keep in Mind When Designing Parts Tooling Setup CNC.
Scientific Evaluation: Being Objective
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 Characterizing the Existing Network Designing and Supporting Computer Networks.
SAFE 645 Principles of Occupational Safety Machine Guarding Basics for Metal & Woodworking Machinery Click for a general introduction to this presentation.
Module J Audits and Inspections Patricia E. Koziol 1Module J Final Version 1-May-2010.
Programming Style and Documentation Objective(s) F To become familiar with Java Style and Documentation Guidelines.
C HU H AI C OLLEGE O F H IGHER E DUCATION D EPARTMENT O F C OMPUTER S CIENCE Preparation of Final Year Project Report Bachelor of Science in Computer Science.
Workshop Mark Heggli Innovative Hydrology, Inc. Consultant to the World Bank Expert Real-time Hydrology Information Systems Module 6: Training, Operations.
Behavior Management: Applications for Teachers (5 th Ed.) Thomas J. Zirpoli Copyright © 2008 by Pearson Education, Inc. All rights reserved. 1 CHAPTER.
Mechanical Integrity Written Procedures. Lesson Objectives  Describe Required Written Procedures for Establishing an MI Program  List Acceptable Sources.
MACHINE SHOP OVERVIEW FOR SENIOR DESIGN. HOURS MONDAY THRU FRIDAY 8:00AM – 4:30PM SHOP STAFF MONDAY THRU FRIDAY 4:30PM – 9:00PM STUDENT STAFF WEEKEND.
GOALS & OBJECTIVES Set forth criteria for safe torch down roof system applications. Define & understand acceptable thermal barriers. Educate on safe torch.
14: Reporting and Presenting Results Copyright © 2008 by the McGraw-Hill Companies, Inc. All rights reserved. Hair/Wolfinbarger/Ortinau/Bush, Essentials.
IFTA BEST PRACTICES LAW ENFORCEMENT GUIDE BY IFTA LAW ENFORCEMENT COMMITTEE.
STAGE #5: CLOSING 5 Process Stages of Project Management.
7 Service Information and Work Orders Chapter Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives After.
Relates to machining and turning centers. Commonly taught in basic CNC courses: 3Parentheses [()] allow messages 3Control ignores anything inside 3Must.
ATSRAC TASK 6 W IRE S YSTEMS H ARMONIZATION W ORKING G ROUP.
Chapter 5 Evidence and Documentation McGraw-Hill/IrwinCopyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Project management Topic 8 Quality Review. Overview of processes Prepare for Quality Review Questions list Meeting Agenda Review Meeting Sign-off Product.
C HU H AI C OLLEGE O F H IGHER E DUCATION D EPARTMENT O F C OMPUTER S CIENCE Preparation of Final Year Project Report Bachelor of Science in Computer Science.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
DO NOW /15/15 Daphnia are freshwater organisms sometimes referred to as “water fleas.” Design an experiment that could be used to test the effects.
Tables Learning Support
The Scientific Method Ms. Spera.  The knowledge obtained by, observing natural events and conditions in order to discover facts and formulate laws or.
Chapt. 6 – Job Analysis Job analysis – the identification and description of what is happening on the job Why is it Important? – Essential to sound compensation.
Graphing Data: Information Data Table: a way to organize data in columns so it is neat and readable Title: a brief way to describe the content of a book,
STAMP ACCOUNTABILITY MANAGEMENT Pacific Area Finance Training February 2008.
The copyright to this material belongs to the Korea Occupational Safety and Health Agency. Unauthorized use and distribution are prohibited. If an individual.
LO.2.2 MB1 How can you simplify an experienced maintenance procedure in order to produce a maintenance plan that is more efficient and easier to follow?
Target Credential Certificate of Completion Expected Completion Time
Distributive Property of Multiplication 306 x 2
Type your title here. Type your name here..
Aim: How can we display data in an experiment?
Quality Management Systems (QMS)
Flooding Walkdown Guidance
CNC Operator Safety Machine Maintenance Material Prep Machine Setup
Times Tables.
office product key|
Spearman Rank Order Correlation Example
ريكاوري (بازگشت به حالت اوليه)
SERVICE AUDITORS REPORT IFTA, INC. FUNDS NETTING PROCESS
<Insert Picture Here>
Company Ivestigation 박기원.
NOTEBOOK SETUP Science
IMPLEMENTATION ,EVALUATION AND MAINTENANCE OF MIS
3 times tables.
6 times tables.
Trevor Chase Barton Candi CIS
Integer Programming Chapter 5.
Presentation transcript:

SENIOR DESIGN PROJECT by Tal Wigdor Standard Setup Procedures for OKUMA CNC Lathe Machine at BFGoodrich, Inc.

Table of Contents Project Objective Problem Description Development of Setup Standard Setup & Setup Time Table Recommendation

Project Objective Develop standard setup procedures for an OKUMA CNC.

No standardized setup time Variability between setup times Different methods of setup Experienced operator Problem Description

Development of Setup Understand the procedures of the machine shop Collect data Create step by step procedures Standardize the setup process Document the setup process Time measurement

Standard Setup & Setup Time Table Obtain proper parts to be machined Install the segments Inspect and reset zero Time Table

Recommendations Appropriate training Safety seminar Safety precautions Reduce setup time Implicate setup procedures Reduce amount of separate setups

Finally Any Questions ?