Ian Bailey University of Liverpool / Cockcroft Institute Positron Source Target Development Update Collaborators STFC Daresbury Laboratory, STFC Rutherford.

Slides:



Advertisements
Similar presentations
I.R. Bailey, J.B. Dainton, L.J. Jenner, L.I. Malysheva (University of Liverpool / Cockcroft Institute)
Advertisements

Target Wheel Prototype Progress LC-ABD / LCUK – Apr Leo Jenner & Ian Bailey Cockcroft Daresbury Laboratory.
Photon Collimation For The ILC Positron Target Lei Zang The University of Liverpool Cockcroft Institute 24 th March 2007.
A Study of Mechanical and Magnetic Issues for a Prototype Positron Source Target The positron source for the International Linear Collider (ILC) comprises.
I.R. Bailey, J.B. Dainton, L.J. Jenner, L.I. Malysheva (University of Liverpool / Cockcroft Institute)
30/10/09 Positron Workshop 1 Future Work Plan, Action Items, Future Meetings Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
Ian Bailey University of Liverpool / Cockcroft Institute Target Design and Photon Collimator Overview EUROTeV: WP4 (polarised positron source) PTCD task.
Using Realistic Photon Spectra Mike Jenkins Lancaster University and The Cockcroft Institute.
Ian Bailey Lancaster University / Cockcroft Institute Baseline Target Prototype Status TILC09, Japan.
Mercury Beam Dump Simulations Tristan Davenne Ottone Caretta STFC Rutherford Appleton Laboratory, UK November-2008.
Undulator R & D Jim Clarke STFC Daresbury Laboratory, UK BAW-2 SLAC Jan 2011.
Ian Bailey University of Liverpool / Cockcroft Institute UK EUROTeV Photon Conversion Target Project EUROTeV: WP4 (polarised positron source) PTCD task.
Solid Targets for the Neutrino Factory J R J Bennett Rutherford Appleton Laboratory, Chilton, Didcot, Oxon, OX11 0QX, UK
Ian Bailey Cockcroft Institute/ Lancaster University October 30 th, 2009 Baseline Positron Source Target Experiment Update.
Mike Jenkins Lancaster University and The Cockcroft Institute.
TARGET HALL OVERVIEW I. Bailey Cockcroft Institute / University of Liverpool.
Jan '09Positron Target Status1 Positron Target Prototype - Status Leo Jenner.
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
ILC Target Wheel Rotordynamics Lisle Hagler 5/23/2007 UCRL-PRES This work was performed under the auspices of the U.S. Department of Energy by University.
Prototype Status. 2 Status Update Safety Cage arriving soon Safety Cage arriving soon Torque transducer up and running Torque transducer up and running.
Tues Mar 24LC-ABD / LCUK, Bristol1 Positron Target Prototype - Status Leo Jenner.
Status of the HELICAL contribution to the polarised positron source for the International Linear Collider The positron source for the International Linear.
Mon Oct 27LC-ABD, Dundee1 Positron Target Prototype - Status Leo Jenner.
Tues Mar 24LC-ABD / LCUK, Bristol1 Positron Target Prototype - Status Leo Jenner.
Thu Oct 30ILC Positron Workshop, DL1 Positron Target Prototype – Current Status Leo Jenner Jim Clarke, Ian Bailey Ken Davies, Andy Gallagher, Lei Zang.
Status of Undulator-based Positron Source Baseline Design Leo Jenner, but based largely on a talk given by Jim Clarke to Positron DESY-Zeuthen,
Target Wheel Prototype Progress Zeuthen meeting – Apr 7-9 Leo Jenner & Ian Bailey Cockcroft Daresbury Laboratory.
FETS-HIPSTER (Front End Test Stand – High Intensity Proton Source for Testing Effects of Radiation) Proposal for a new high-intensity proton irradiation.
Radiation Cooling of the ILC positron target LCWS 2014, Belgrade, Serbia 7 th October 2014 Sabine Riemann, DESY, Peter Sievers, CERN/ESS, Andriy Ushakov,
Undulator Based ILC Positron Source Studies Wei Gai Argonne National Laboratory CCAST ILC Accelerator Workshop Beijing, Nov 5 – 7, 2007.
Ian Bailey University of Liverpool / Cockcroft Institute ILC Baseline Target Collaborators STFC Daresbury Laboratory, STFC Rutherforord Appleton Laboratory,
Status: Cooling of the ILC e+ target by thermal radiation POSIPOL 2015, Cockroft Institute, Daresbury, UK 2 nd September 2015 Felix Dietrich (DESY), Sabine.
Key luminosity issues of the positron source Wei Gai.
Positron Source General Update M. Kuriki(Hiroshima U./KEK) ALCW2015, April 2015,Tsukuba/Tokyo, Japan.
Status of target and photon collimator work for polarized e+ LCWS 2014, Belgrade, Serbia 7 th October 2014 Sabine Riemann, Friedrich Staufenbiel, DESY.
Development of a Positron Production Target for the ILC Positron Source Capture Optics Positron beam pipe/ NC rf cavity Target wheel Vacuum feedthrough.
Ian Bailey University of Liverpool / Cockcroft Institute UK Target Update EUROTeV: WP4 (polarised positron source) PTCD task I. Bailey, J. Dainton, L.
Radiation Cooling of the ILC positron target ALCW 2015, KEK, Tsukuba, Japan 24 th April 2015 Felix Dietrich (DESY), Sabine Riemann (DESY), Peter Sievers.
REMOTE-HANDLING OVERVIEW I. Bailey Cockcroft Institute / University of Liverpool.
Eddy current modelling for ILC target ILC meeting 31 st Jan- 3 rd Feb 2007 IHEP-Beijing James Rochford.
Welcome and Introduction to the Workshop Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC Positron Source Collaboration Meeting 29 – 31.
ILC/CLIC e + generation working group Jim Clarke, STFC Daresbury Laboratory and Louis Rinolfi, CERN.
10/9/2007 Global Design Effort 1 Optical Matching Device Jeff Gronberg / LLNL October 9, 2007 Positron source KOM - Daresbury This work performed under.
Ian Bailey Cockcroft Institute/ Lancaster University IWLC October 21 st, 2010 Overview of Undulator-Based Sources for LC.
Parameters of the NF Target Proton Beam pulsed10-50 Hz pulse length1-2  s energy 2-30 GeV average power ~4 MW Target (not a stopping target) mean power.
Status: Cooling of the ILC e+ target by thermal radiation LCWS 2015, Whistler, Canada 3 rd November 2015 Felix Dietrich (DESY), Sabine Riemann (DESY),
F.Staufenbiel / EuCARD 2 / Heat load and stress studies of the ILC collimator G. Moortgat-Pick 1;2 S. Riemann 2, F. Staufenbiel 2, A. Ushakov.
Positron Source Target Update Tom Piggott Jeff Gronberg Lisle Hagler Dain Holdener Marty Roeben This work was performed under the auspices of the U.S.
Photon Conversion Target Wheel Eddy Current Simulations - Update Ian Bailey and Ayash Alrashdi Lancaster University / Cockcroft Institute.
Positron Source Update Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC 08, University of Illinois at Chicago, 17 th November 2008.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim Posipol Workshop, Orsay, France May 23-25, 2007 Work performed.
Ian Bailey Cockcroft Institute/ Lancaster University September 30 th, 2009 Baseline Positron Source Target Experiment Update LCWA09.
ILC Undulator Based Position Source Target System Wei Gai, HEP, ANL TB meeting 8/5/2014.
Oct. 6, ILC Positron Source Group Meeting Short report by S. Riemann September 2006, RAL.
T2K Target status PASI Meeting Fermilab 11 th November Chris Densham STFC Rutherford Appleton Laboratory On behalf of the T2K beam collaboration.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
Progress with Zeuthen Meeting Actions Jim Clarke ASTeC, STFC Daresbury Laboratory.
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim ILC GDE Meeting DESY May 30 – Jun2, 2007 Work performed for.
Photon Collimator and Conversion Target Status I. Bailey University of Liverpool / Cockcroft Institiute Cockcroft Institiute.
Polarised Positron Source Target and Collimator
University of Liverpool / Cockcroft Institute
A Positron Target Concept for the ILC
Pair-Production Target
Positron Update ILC R&D Meeting/ March 12, 07 VB & JCS
CLIC Undulator Option for Polarised Positrons
Future Work Plan and Action Items
ILC RDR baseline schematic (2007 IHEP meeting)
Helical Undulator Insertion Device The heLiCal collaboration
Summary for the Sources working group
Presentation transcript:

Ian Bailey University of Liverpool / Cockcroft Institute Positron Source Target Development Update Collaborators STFC Daresbury Laboratory, STFC Rutherford Appleton Laboratory, STFC ASTeC ANL, DESY, LLNL, SLAC LCWS/ILC 2007, Hamburg

ILC RDR Baseline Positron Source RDR Parameters Relevant for Target  Centre of undulator to target: 500m  Active (K=0.92, period=1.21mm) undulator length: 147m  Photon beam power: 131kW  First harmonic: 10MeV  Beam spot: >1.7 mm rms

Beam Spot Characteristics SPECTRA (v7) simulation (Simple simulation of a continuous undulator without misalignments, collimation or electron beam jitter.) mean: 1.9 mm sd: 1.0 mm power-weighted beam spot rms: 2.2 mm

Baseline Target Design Wheel rim speed (100m/s) fixed by thermal load (~8% of photon beam power) Rotation reduces pulse energy density (averaged over beam spot) from ~900J/g to ~24J/g Cooled by internal water-cooling channel Wheel diameter (~1m) fixed by radiation damage and capture optics Materials fixed by thermal and mechanical properties and pair-production cross- section (Ti6%Al4%V) Wheel geometry (~30mm radial width) constrained by eddy currents. 20cm between target and rf cavity. Axial thickness ~0.4 radiation lengths. T. Piggott, LLNL Drive motor and water union are mounted on opposite ends of through-shaft.

Baseline Target Activities Design underpinned by simulations –Thermal and structural –Vibrational and rotordynamics –Capture optics effects –Activation and radiation damage (see talk by Andriy Ushakov) –(Polarisation transfer) (Remote-handling solutions) Alternative target materials Target prototyping

Thermal Studies W. Stein, LLNL TOPAZ-3D and DYNA-3D simulations  Rapid energy deposition generates a pressure shock wave  Maximum stress is experienced at the back surface of the target  For older beam parameters (small beam spot), peak stress was ~4x10 8 Pa  This is a factor of two below the yield stress  Simulation is being re- evaluated with updated parameters and target design at LLNL.

Flywheel Critical Speeds (Stainless Steel Drive Shaft) Nominal Design Basis Bearing + Mount Stiffnesses Support Translational Stiffness = 1,000,000 lbf/inSupport Rotational Stiffness = 10,000 lbf*in/rad Forward Whirl Backward Whirl Sources of Rotor Excitation Lorentz 5/rev 1/rev Major Critical Speeds Tilt 2400 RPM Cylindrical 3300 RPM Operating Speed Range Rotor Whirl Frequency (rad/s) Drive Shaft Outer Diameter = 2.0 in. Bearing Center-to-Center Span = 14.0 in. 1/rev 5/rev 1 st Major Critical Speed 2 nd Major Critical Speed L. Hagler, T. Piggott, LLNL Similar plots exist for Ti drive shafts, etc.

Activation Simulations Majority of work is being carried out at DESY (see Andriy Ushakov’s talk) At DL - new target geometry (mostly) migrated to FLUKA T-489 FLUKA benchmarking experiment carried out at CERN / SLAC Simulations will begin at DL shortly to augment DESY n/c rf cavity motor assembly target wheel (including water channel) flux concentrator L. Fernandez-Hernando, DL

Eddy Current Modelling Capture optics induce eddy currents in the target wheel. Eddy current simulations have been carried out by LLNL, Cornell, ANL(FEMLAB) and RAL (OPERA): –SLAC Cu disc experiment –2m diameter wheel (older design), s/c OMD field –1m diameter wheel, 1T field, up to 2000rpm 2m results were presented at Beijing Positron Source meeting in Jan ’07 –Eddy current power losses of order 100kW –~factor 4 difference in results from RAL and ANL Agreed to study 1m diameter wheel using standardised geometry and parameters.

1m Wheel Eddy Current Simulations Target wheel Coils J. Rochford, RAL For 1T field at 2000rpm RAL predicts ~6.6kW ANL predicts ~9.5kW Cornell? LLNL? Difference not yet understood…  Alternative capture optics, alternative materials, prototyping

Ceramics as Alternative Target Materials Reference MaterialsMachinable CeramicsNitrides Titanium Alloy Ti-6Al-4V Grade 5 Annealed Isotropic Graphite IG-43 “Macor” Machinable Glass- ceramic “Shapal-M” Machinable Aluminium Nitride AlN Aluminium Nitride Si 3 N 4 Silicon Nitride (Hot Pressed) “Sialon” Solid Solution BN Boron Nitride Heat Capacity J/kg. K – 2000 Expansion Coefficient /K x x x x x x –3.7 x – 36 x Density Kg/ m Radiation Length mm Thermal Conductivity W/m.K – 50 Electrical Resistivity Ohm.m 1.78 x x > x >10 11 >10 10 >10 9 Max. Use Temperature ºC Melting Point ~ – 1900 In non-oxidising atmosphere 1000 – 1800 In non-oxidising atmosphere Tensile Strength MPa Yield 880 UTS Compressive Strength MPaYield – 120 Elastic Modulus GPa P. Loveridge, RAL

Ceramics as Alternative Target Materials P. Loveridge, RAL CarbidesOxides B 4 C Boron Carbide (Hot Pressed) SiC Silicon Carbide (Reaction Bonded) SiC Silicon Carbide (Hot Pressed) WC 94 / Co 6 Tungsten Carbide / Cobalt BeO 99.5% Beryllia Al 2 O % Alumina ZrO 2 / MgO Zirconia (Magnesia stabilised) YO 99.9% Yttrium Oxide Heat Capacity J/kg. K Expansion Coefficient /K5.6 x –4.6 x x –5.0 x –9.0 x x – 10 x x DensityKg/m Radiation Length mm Thermal Conductivity W/m. K – – – Electrical Resistivity Ohm. m – x >10 12 See note10 12 Max. Use Temperatur e ºC Melts at ~2400 ºC Tensile Strength MPa >300 Compressive Strength MPa > Elastic Modulus GPa –

Prototype Target Wheel Experiment Aim to construct and test a prototype to establish the mechanical stability of the target wheel assembly in the field of a strong magnet (~1T). Does not include internal water-cooling channels. Does not include vacuum vessel or vacuum testing. Due to begin assembly of wheel at DL in Summer ’07. Commissioning and balancing of the prototype wheel should be complete September ’07. Experiment scheduled to finish May ’08. Will benchmark eddy current and rotordynamic simulations. Originally envisaged as the first stage of a series of prototypes…depending on funding.

Target Prototype Design Mechanical stability and eddy current tests Sectional view 1m diameter Ti6%Al4%V wheel with slightly simplified structure compared to current baseline target wheel. Prototype consistent with baseline vacuum feedthrough and water cooling designs. Motor being sized for angular velocities up to ~2000rpm. Construction at DL scheduled to be complete in August Expect eddy current power losses up to ~10kW.

Prototype Target Wheel (with Belt Drive) K. Davies, DL Shows vacuum feedthroughs replaced with cheaper (and stiffer) Plummer block assemblies. It has not yet been decided whether to use a direct-drive or belt-drive motor. Instrumentation includes: torque sensor, remote temperature gauges and accelerometers. Equilibrium temperature of wheel in air using 1.5T field at 2000rpm ~ 500K !

Target Prototyping Status Project is funded Space has been allocated at DL Magnet has been sourced – model GMW water-cooled electromagnet –variable pole gap (0mm->160mm) Design should be complete ~mid-June Design consistent with – Water-cooled rotating vacuum feedthroughs (Rigaku RMS-F1-HS-50- W-C MagnaSeal) – Rotating water union (Deublin 55 series) Instrumentation and DAQ being designed (Andy Gallagher - DL, Leo Jenner - Liverpool) Draft document outlining experimental programme has been written and circulated

Photon Collimator N. Golubeva and V. Balandin, DESY A. Mikhailichenko, Cornell Copper Niobium EGS4 simulation - collimator sideview Purpose of collimator Scrape beam Adjust beam polarisation

FLUKA Photon Collimator Simulations Simulations started in FLUKA Calculating energy deposition, peak and average heating. Investigating cooling solutions. In the longer term will evaluate activation and polariation. Lei Zang, University of Liverpool

Summary and Future Activities Thermal + structural Updated studies underway at LLNL Larger beam spot may relax constraints on wheel speed Rotordynamics Ongoing studies for both prototype wheel and baseline design Capture optics effects / eddy currents Need to resolve mismatch between RAL and ANL results. Simulations of pulsed magnets and CARMEN simulation of spoke effects are expected soon. SIMULATIONS Current vertical r.h. design will be written up as a report Summer ‘07 Little UK funding available to fund this activity at RAL for the coming financial year. REMOTE-HANDLING Design for prototype to measure eddy current effects in target rim is well- advanced. Solutions need to be found to keep the magnet cool when operating at high field (radiative and conductive heating of pole caps). Instrumentation needs to be finalised. Experiment should be taking data in Autumn ’07. TARGET-PROTOTYPING