2014/3/25TTC Meeting Radiation measurement and comparison between VT/CM tests at KEK-STF Kirk.

Slides:



Advertisements
Similar presentations
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Operational Results from STF-VTS and Cryomodule Tests at KEK Eiji Kako (KEK, Japan)
Advertisements

KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
Juliette PLOUIN – CEA/SaclayCARE’08, 3 December /21 Superconducting Cavity activities within HIPPI CARE ‘08 CERN, 2-5 December 2008 Juliette PLOUIN.
E. Kako (KEK) Webex Meeting in May 24th, Status and Disassembly Plan of S1-G Cryomodule.
K. Oishi, K. Kosako and T. Nakamura Institute of Technology, Shimizu Corporation, Japan id=17 SATIF-10.
Accelerator hall of the S- DALINAC – electron energies from 2 to 130 MeV available – cw and pulsed beam operation possible – source for polarized electron.
Dosimetric evaluation of a new design MOSFET detector Per H. Halvorsen* & Stephanie Parker University of North Carolina.
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
R&D on Cavity Integration and Test H. Hayano,
Test infrastructure and test programs at KEK-STF Kirk 2013/3/26TTC meeting
Control configulation for S1G module operation H. Hayano version 1.
SRF Cryomodule 2 Cavity Test Results Andy Hocker TD/SRF Dev Dept. All Experimenters Meeting, 10-OCT-2011.
November LCWS08 S. Fukuda 1 KEK HLRF Status and S1- global S. FUKUDA KEK.
KEKB Crab Development K. Hosoyama (KEK) Crab Cavity for HER Crab Cavity for LER Crab Cavity for KEKB History of Crab Cavity R&D Characteristics of Crab.
E. KAKO (KEK) 2009' Dec. 22 S1-G Webex meeting Global Design Effort 1 Final Results of KEK Cavities for S1-Global Eiji Kako (KEK, Japan)
TTF-II Status & Prospectives Nick Walker DESY 5 th ITRP Meeting – CALTECH.
Summary of Main Linac SCRF-part H. Hayano, ILC08 at UIC.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
E. KAKO (KEK) 2011' May 15 S1-Global Test 1 Fact Test Schedule of S1-Global Cryomodule (June, 2010 – Feb. 2011)
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
28/Jul/ Test Results of the International S1-Global Cryomodule Kirk.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Cavity status; recent KEK activities : Hayano (1)STF CM-1 cavities are; MHI MV/m for CM-1 ILC cryomodule (3-rd VT) MHI MV/m for.
KEK Status Report Kirk 04/Mar/20151LCC 5th SCRF Meeting.
E. KAKO (KEK) 2009' Dec. 2 5 STF Meeting for S1-G Global Design Effort 1 Cavity string assembly at KEK for S1-Global Eiji Kako (KEK, Japan)
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
● Offer the reliable system to the Asian regional facility STF. ● Improve TTF design and demonstrate in the beam line for RDR / TDR. ● Establish industrial.
Horizontal Test Stands and CC2 Results Andy Hocker Testing an alternative ILC cavity design at USPAS (Q 0 =2.23E+02)
G4Beamline Simulated Electron Distribution within the HPRF Cavity 2/15/20121.
E. KAKO (KEK) 2010' Nov. 02 S1-G Webex meeting Global Design Effort 1.
Dec/1/2015WG3 in TTC Meeting Test Result of STF-2 Cryomodule Kirk Jun/2013Jul/2015 Preliminary.
A. Bross MICE CM17 February MuCool RF Program 805 and 201 MHz Studies.
E.Kako (KEK) 2009.Dec. 26 1 S1-Global Cryomodule Overview No connection No beam tube No gate-valve Closed by Blind Flange Gate-valve Pumping system Pumping.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
KEK-STF Vertical Test and Diagnostics Brief History & Future Plan Vertical Test Facility Cavity Diagnostic System Example of MHI#7 Cavity Summary of T-mapping.
Dec/3/2015WG2 in TTC Meeting Field emission / Radiation in V.T. Kirk.
2014/3/25TTC Meeting Beam Operation Experience at Quantum Beam Project in STF Kirk.
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
Summary of Results and Development of Online Monitor for T-mapping/X-ray-mapping in KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Satoh, T. Shishido,
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
Gradient Degradation Experience at Fermilab (NML/CM-1) Elvin Harms TTC Meeting, Beijing 5-8 December 2011.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
1.3 GHz Cavity/Cryomodule Performance Camille M. Ginsburg (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
C100 summary of performance degradation - VTA to Cryomodule Ari Deibert Palczewski SRF Scientist July 5, 2016.
Recent Result for the STF-2 Cryomodule Operation
ILC10 Beijing Global Design Effort
CW couplers; KEK injector couplers Eiji Kako (KEK, Japan)
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Measurement results of cavity gradient degradiation of cERL Main Linac cryomodule under beam operation Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji.
Magnetic shields inside and outside LHe tank in S1-Global cryomodule assembly at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Performance of Slide-jack tuner in STF-2 Cryomodule
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
Beam operation status in C-ADS cryomodule at IMP/IHEP
Microphonics and Energy Jitter
KEK injector cryomodule
Performance Degradation cERL Injector Cryomodule
EU-XFEL summary of performance degradation
FRIB summary of performance degradation - VTA to cryomodule
MAP 2014 Spring Workshop Fermilab May, 2014
TTC meeting, Milano Global Design Effort
Cavity Degradation Experience at S1-Global
MAGiC Shielding Simulations
TTC Meeting, July , Saclay, France.
Summary of the maximum SCRF voltage in XFEL
Presentation transcript:

2014/3/25TTC Meeting Radiation measurement and comparison between VT/CM tests at KEK-STF Kirk

2014/3/25TTC Meeting Radiation Detector in KEK-STF There are two types of detectors, MAR-781 and MAR-782. Specifications: Radiation detected: X-ray and γ-ray Detector type: Silicon semiconductor Energy range: 50 keV to 6 MeV Measurement range: μSv/h mSv/h Accuracy: within ±10% These detectors are used in VT and CT. But, each position is different.

2014/3/25TTC Meeting ① ② ③ ~100cm Floor of pit Center of Beam Axis Floor of pit ~80cm Detector position in VT area Cavity position is 4m below from top plate of cryostat.

2014/3/25TTC Meeting ① ② ③ ~100cm Floor of pit Center of Beam Axis Floor of pit ~80cm Detector position in VT area Cavity position is 4m below from top plate of cryostat. Radiation level depends on material kind and thickness, and distance from a cavity. Representatively, we use “On beam axis” position.

2014/3/25TTC Meeting Detector position in CT area Set positions of radiation detector “S1-Global” cryomodule There is “No” detector on beam axis in CT!

2014/3/25TTC Meeting U X-ray Cryomodule - CCryomodule - A D X-ray M X-ray C1C2C3C4A1A2A3A4 Degradation of Eacc,max Tuner Trouble Tuner Trouble Coupler Vacuum Up-streamDown-stream Comparison of cavity performance E. Kako

2014/3/25TTC Meeting Comparison of cavity performance Degradation of Eacc,max C2 C3 C4 C1 A1 A2 A3 A4 at 25MV/m E. Kako

2014/3/25TTC Meeting Conclusion  There is no simple comparison of radiation level between VT and CT in KEK-STF.  Different location  On axis/Off axis, distance from cavity  Different material and thickness  Cryostat design/material, different thickness  Different operation mode (CW/pulse)  Dependence on time response/accuracy of radiation detector