DCS TCSG November 10th 1999, H.J.Burckhart1 Status of the general purpose I/O system LMB u DCS Architecture u LMB u Local Monitor Box (LMB) u Concept u.

Slides:



Advertisements
Similar presentations
The Control System for the ATLAS Pixel Detector
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
Data Acquisition Risanuri Hidayat.
ESODAC Study for a new ESO Detector Array Controller.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
HCAL RBX PRR 2 March H C A L RBX Monitoring RBX Production Readiness Review Monitoring, Fieldbus and DCS John E. Elias HCAL Electronics Coordinator.
ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct Hardware Status and Plans of the Embedded Local Monitor Board Hardware Status.
Mainz: Contributions to the LArg-Calorimeter Purity monitoring of the liquid argon and temperature measurement in the three cryostats - Old electronics.
DCS LEB Workshop ‘98, Rome, Detector Control System, H.J.Burckhart,1 Detector Control System H.J Burckhart, CERN u Motivation and Scope u Detector and.
Distributed Control Systems Emad Ali Chemical Engineering Department King SAUD University.
ACES 2011 The third common ATLAS CMS Electronics Workshop for LHC upgrades March 9-11, 2011, CERN, Geneva, Switzerland Hardware:  ATMEL ATmega128 microcontroller.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
Cooling: CEDAR PMT & Electronics Tim Jones Liverpool Group.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Smart transmitters.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
ATLAS ATLAS DCS H.J.Burckhart, Muon Electronics Meeting, December 11th Status of Embedded Local Monitor Board (ELMB) Overview Radiation tolerance.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
9th September 2001R. BARILLERE - IT-CO1 Industrial and Custom Front-End solutions for Process Controls.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
Sales Training 3/15/2013 Owner : JOCA Cypress Confidential TI UCD90160 vs. Cypress PSoC 3 Power Supervision Applications More Rails on a One-chip Solution.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
CEDAR PMT Array DCS (Tim). Summary Summary of DCS monitored parameters based on original scheme – Major part of heat dissipation in electronics / PMTs.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATI PRR CERN 4 March the Embedded Local Monitor Board ELMB Design description of the Embedded Local Monitor.
Electronic Systems Support Power Supply Joint Activity Chris Parkman EP Electronic Systems Support (EP-ESS) February 26, 2003.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
1 LHCb meeting Anatoli Konoplyannikov Introduction Which HV to be set before beam will come? Needed Constants PVSS data point type (DPT) format.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
CMS ECAL DCS 10.Oct S.Zelepoukine ICALEPCS CMS ECAL DCS 1 The Detector Control System for the Electromagnetic Calorimeter of the CMS Experiment.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
ATLAS DCS ELMB PRR, CERN, March 2002Fernando Varela ELMB Networks CAN/CANopen Interoperability of the ELMB Usage of the ELMB in ATLAS ELMB Networks Full.
60kW Thermosiphon control system
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
TWEPP Paris, 09 Radiation Tests on the complete system of the instrumentation electronics for the LHC Cryogenics at the CNGS test facility Evangelia Gousiou.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
EtherCAT based RF Interlock System for SwissFEL LLRF 2015 Abstract As part of the overall development effort for SwissFEL's RF and LLRF systems, the RF.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
Progress in the Development of Evaporative Cooling Systems for the ATLAS Inner Silicon Tracker G. Hallewell 1 and V. Vacek 2 1 Centre de Physique des Particules.
TRANSMISSION LINE MULTIPLE FAULT DETECTION AND INDICATION TO EB
The Control and Hardware Monitoring System of the CMS Level-1 Trigger Ildefons Magrans, Computing and Software for Experiments I IEEE Nuclear Science Symposium,
Martin van Beuzekom, Jan Buytaert, Lars Eklund Opto & Power Board (OPB) Summary of the functionality of the opto & power board.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
M. Hansen, CERN S. Lusin, CMS TC / UW
SCADA for Remote Industrial Plant
ATLAS MDT HV – LV Detector Control System (DCS)
Ideas and design concepts, and challenges
How SCADA Systems Work?.
BCTW calibration status and future
Cypress PSoC 3 vs. TI UCD90160 Power Supervision Applications
Radiation- and Magnet field- Tolerant Power Supply System
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

DCS TCSG November 10th 1999, H.J.Burckhart1 Status of the general purpose I/O system LMB u DCS Architecture u LMB u Local Monitor Box (LMB) u Concept u Measurements and Results u Future

DCS TCSG November 10th 1999, H.J.Burckhart2 Subdetectors

DCS TCSG November 10th 1999, H.J.Burckhart3 Detector organization  Hierarchical organisation of quasi independent units (“objects”)  Separation for various reasons (organisational, operational, geometrical, etc.)  Units have to operate stand-alone and integrated  Data flow mainly vertically  Common Infrastructure handled like a subdetector

DCS TCSG November 10th 1999, H.J.Burckhart4 DCS Architecture

DCS TCSG November 10th 1999, H.J.Burckhart5 Hierarchical levels of DCS Supervisor Level operator consoleshift operator, sub-system expert serverdata base, DAQ, External system Subsystem control level SCADA Local Ctrl StationGas, HV, endcap SCADA FE I/O Device Control FE I/O stand-alone systemalignment, gas analyser Fieldbus nodechamber, power supply PLCcooling, gas mixer Sensors, actuators

DCS TCSG November 10th 1999, H.J.Burckhart6 Requirements I/O system u Radiation (10 11 neutrons/cm 2 over 10 years outside of calorimeter) u analogue effects (e.g. loss of gain) u Single Event Upset (e.g. program corruption) u Magnetic field (up to 1000 Gauss in UX15 racks) u Access restriction u I/O points distributed over whole detector volume ( up to 100m distances) u Standardized connections to SCADA u HW: Fieldbus, LAN u SW: OPC, TCP/IP

DCS TCSG November 10th 1999, H.J.Burckhart7 Front-end I/O system Separation in Sub-detector specific and General Purpose I/O system Reasons for General Purpose I/O system: u needed for monitoring common infrastructure u radiation tolerance u high production volume (price) u maintenance u interfacing to SCADA u common software, only configuring needed

DCS TCSG November 10th 1999, H.J.Burckhart8 Concept of LMB u Modular system made out of building blocks (original idea from NIKHEF) u CAN node u I/O unit (e.g. ADC, bit I/O) u signal conditioning (e.g. range, excitation current) u add-on features (e.g. interlocks) u Different packaging (e.g. stand-alone, plug-on board, embedded on existing PCB) u Prototyping in ATLAS (in collaboration with sub- detectors), production in industry u Industrial standard (CAN)

DCS TCSG November 10th 1999, H.J.Burckhart9 LMB Design Features u Radiation Tolerance u selected COTS u over-design performance, allow for degradation u operate at lower values than specified u install at protected and accessible places u replace after n years u Operation in magnetic field u no coils, chokes, transformers, DC/DC u remote power u Limited access u remote diagnostics u remote loading of programs and reset

DCS TCSG November 10th 1999, H.J.Burckhart10 Implementation of LMB u Prototype series produced ( modules) and given to all ATLAS sub-detectors ( + others) u Existing building blocks: u CAN controller module u front end I/O board u multiplexed ADC 16+7 bit, channels u digital I/O ( in preparation) u signal adaptation board u PT100 (4-wire connection) u PTx, NTC (2-wire connection) (LAr, BNL) u voltage, current adapters u interlock circuit (Pixel, Wuppertal)

DCS TCSG November 10th 1999, H.J.Burckhart11 LMB block diagram

DCS TCSG November 10th 1999, H.J.Burckhart12 LMB Front-end board

DCS TCSG November 10th 1999, H.J.Burckhart13 LMB prototype

DCS TCSG November 10th 1999, H.J.Burckhart14 Radiation measurements u 1998 in TCC2, LMB not powered u 79 days, 200 Gy, 2*10 12 neutrons/cm 2 u 2 EEPROM cells changed u substantial gain loss of opto-couplers u 1998 at PROSPERO reactor, neutrons < 4 MeV, LMB read out u 5 hours, 9*10 12 neutrons/cm 2 u substantial gain loss of opto-couplers

DCS TCSG November 10th 1999, H.J.Burckhart15 Radiation measurements (cont.) u 1999 in TCC2, LMB read out u 80 days, 200Gy, 2*10 12 neutrons/cm 2 u different opto-couplers (see plot) u some multiplexer failed after 75 Gy u increased power consumption and some functional problems after 125 Gy and neutrons/cm 2 u 3 cases of program corruption, power on/off cured problem

DCS TCSG November 10th 1999, H.J.Burckhart16 Radiation tests in TCC2 Objectives: long-term stability of operation in a radiation environment behavior of components e.g. optos, EEPROM

DCS TCSG November 10th 1999, H.J.Burckhart17 Radiation test opto-couplers

DCS TCSG November 10th 1999, H.J.Burckhart18 LAr High Precision Temp. Meas.

DCS TCSG November 10th 1999, H.J.Burckhart19 Precision Temperature measurement

DCS TCSG November 10th 1999, H.J.Burckhart20 Precision Temperature measurement

DCS TCSG November 10th 1999, H.J.Burckhart21 Pixel Cooling System u some 100 temperature sensors u some 10 other ADC channels (flow, pressure, etc) u Feedback loops (ADC, DAC) u use LMB for ADC, industrial CAN modules for rest

DCS TCSG November 10th 1999, H.J.Burckhart22 Performance and features of LMB u Resolution 16 bit (0.8mK) u absolute accuracy 4*10 -5 (3mK) u long term stability 50ppm over one month u radiation tolerance basically ok u weak components eliminated u final test to be done u works in magnetic field (9kG) u in-field programmable u CAN standard u low cost (2US$ per ADC_chan)

DCS TCSG November 10th 1999, H.J.Burckhart23 Future LMB Further developments: u Digital I/O u DAC u Bus converters (e.g. JTAG, I2C) u Dedicated functions with custom programs in micro-controller

DCS TCSG November 10th 1999, H.J.Burckhart24 Summary u LMB concept very suited for distributed DCS u Necessary performance achieved u Projected price “very reasonable” u LMB adopted as baseline by some subdetectors u LMB review started (Web: ATLAS->T/DAQ->DCS) u Questions to subdetectors: u what application u what type of modules u number of channels, granularity u packaging (stand alone, plug-on, embedded) u time scale