1. 2 FIFA SWC 2010™ ACSA state of readiness presentation 2 March 2010.

Slides:



Advertisements
Similar presentations
CRUISE LINE TOURISM STEERING COMMITTEE MEETING OUTCOMES OF THE WORKSHOP & PROGRESS 24 TH MARCH 2009.
Advertisements

1 DEPARTMENT OF PUBLIC WORKS PROGRESS REPORT ROAD MAINTENANCE, JOB CREATION AND POTHOLES by ACTING DDG: PROJECTS (OBED MOLOTSI) 01 November 2011.
Consultative meeting on Municipal and Primary Health Services MUNICIPAL HEALTH STATUS National Department of Health Presenter: Aneliswa Cele Venue: Sandton.
WHAT IS THE HDA? The Housing Development Agency (HDA) is a national public development agency established by an Act of Parliament (Act 23 of 2008). The.
Main mode to work - % of commuters Western Cape Eastern Cape Northern Cape Free.
HDA’s revised strategic direction and Annual Performance Plan 2013/14 March 2013.
2010 FIFA World Cup SAPIA readiness submission 19 May 2010.
PRESENTATION TO THE PORTFOLIO COMMITTEE – 29 JANUARY 2008 (BY SI SELEPE DDG/ACDP) DAC 2010 ARTS AND CULTURE PROGRAMME FOR THE AFRICAN CONTINENT.
Economic Research Southern Africa Infrastructure Workshop May World Cup: Infrastructure Challenges National Treasury.
9/2/09 DEPARTMENT OF TOURISM UPDATE 2010 SOCCER WORLD CUP.
Leading the Public Service to Higher Productivity Status quo with regard to the representation of persons with disabilities in the Public Service and women.
Presented by Themba P Wakashe Director-General REPORT ON THE UNSPENT BUDGET 2009/10 TO STANDING COMMITTEE ON APPROPRIATIONS.
TECHNICAL OVERSIGHT MONITORING AND SUPPORT VISITS ON REGIONAL PROJECTS: 2014/15 Prepared by: R. Gillmer Chief Engineer : Technical Support 21 August 2014.
1. 2 SOUTH AFRICAN SPORTS COMMISSION REPORT TO THE PORTFOLIO COMMITTEE ON THE ACTIVITIES OF THE SASC IN THE FINANCIAL YEAR 15 NOVEMBER 2004.
1Confidential and Not for Publication PROGRESS ON DELIVERY AGREEMENT FOR OUTCOME 8: SUSTAINABLE HUMAN SETTLEMENTS AND IMPROVED QUALITY OF HOUSEHOLD LIFE.
1 POLICY,STRATEGY and IMPLEMENTATION NATIONAL DEPARTMENT OF TRANSPORT.
Aviation Sub-Sector Task Team Presentation to Potfolio Committee on Transport 2 March 2010.
Mbombela State of Readiness: 2010 FIFA Soccer World Cup Tournament.
1 Water Services to Schools and Clinics Programme 20 June 2007 Presentation to Select Committee on Education and Recreation By DWAF.
EPWP PRESENTATION TO PORTFOLIO COMMITTEE. Principles informing IDT’s role Adding value to government development agenda Delivery of measurable sustainable.
Fibre Processing and Manufacturing SETA (FP&M SETA ) Discretionary Grants : PROGRESS TO DATE.
PROGRESS REPORT ROLE OF PROVINCES ON THE DEVELOPMENT OF INDIGENOUS LANGUAGES ACTING DIRECTOR-GENERAL VELISWA BADUZA (MS) ARTS AND CULTURE NATIONAL LANGUAGE.
World Cup Readiness Presentation to the Joint Committee 19 May 2010.
TRANSPORT OPERATIONAL PLANS FOR THE FIFA 2010 World Cup TM 18 MAY 2010.
Select Committee on Appropriations Wednesday, 29 August 2012 Committee Room M46, Marks Building Presentation by Mr MG Seitisho LOCAL GOVERNMENT TURNAROUND.
SARS Journey towards the 2010 Soccer World Cup Stakeholder Meeting Megawatt Park 23 rd April 2008.
National Land Transport Act Regulations on Public Transport for the 2010 FIFA World Cup 16 March 2010.
South Africa 2010 – Germany 2006 The Program: - InWEnt is a German government agency dealing with capacity building worldwide - Co-operation between colleagues.
2010 MARKETING STRATEGY 7 JULY Some facts about 2010 Record 204 countries participating visitors expected in SA 4 out of 5 visitors indicate.
MANGAUNG HOST CITY PRESENTATION TO LOCAL GOVERNMENT AND SPORTS PORTFOLIO COMMITTEE GEORGE MOHLAKOANA PARLIAMENT 29 AUGUST 2006.
Presentation of the Property Rates Debt to the Port Folio Committee on Cooperative Governance & Traditional Affairs 25 October 2011 Presented by: Cathy.
2010 FIFA World Cup South Africa RUSTENBURG ESI Feedback 8 April 2010.
1 IMPLEMENTATION OF THE PAJA DEPARTMENT OF JUSTICE AND CONSTITUTIONAL DEVELOPMENT.
Themba Wakashe Director - General Department of Arts and Culture 2009 / 10 DIVISION OF REVENUE BILL PRESENTATION TO SELECT COMMITTEE ON FINANCE NCOP 3.
EPWP Progress Reports to Portfolio Committee Presented by: Stanley Henderson DDG: EPWP 01 March
National Department of Health Joint Parliamentary public hearings on the state of readiness for the 2010 FIFA World Cup 18 May
PROGRESS REPORT ON TURNARROUND PLAN 2015 PRESENTATION BY: PACOFS MANAGEMENT TO DAC FINAL REPORT UPDATES
SCHOOL SPORT PRESENTATION TO PORTFOLIO COMMITTEE 27 JULY 2010.
THUBELISHA HOMES CLOSURE REPORT Presented to the Portfolio Committee on 8 July 2009.
1. PRESENTATION TO THE SELECT COMMITTEE ON APPROPRIATIONS Public Hearing on Division of Revenue Bill March
QUARTERLY PERFORMANCE OF THE MUNICIPAL INFRASTRUCTURE GRANT (MIG) – 2005/06 AND 2006/07 FINANCIAL YEARS Presentation to the Select Committee On Finance.
1 Overview The Expanded Public Works Programme (EPWP) 17 Aug 2010 EPWP incentive update for Select Committee on Public Services.
ASATA PRESENTATION 23 June Some facts about 2010 Record 204 countries participating visitors expected in SA 4 out of 5 visitors indicate.
BRIEFING ON SCHOLAR TRANSPORT TO THE PARLIAMENTARY PORTFOLIO COMMITTEE ON TRANSPORT By Mr George Mahlalela Director General 12 April April 2011.
1 Select Committee on Economic Development Progress relating to the implementation of Integrated National Electrification Programme (INEP)
Progress on Implementation of the Comprehensive HIV and AIDS Plan February 2004.
RFP FOR DEVELOPMENT OF TRAINING MATERIAL, PROVISION OF BASE LINE TRAINING AND PROMOTION OF SASSA IN-HOUSE CORE TRAINING COMPETENCE.
THE NATIONAL CLIMATE CHANGE RESPONSE POLICY NATIONAL CLIMATE CHANGE RESPONSE POLICY CLIMATE CHANGE ADAPTATION The relevance of Adapting to Climate Change:
Commission on Restitution of Land Rights
Select Committee on Communications and Public Enterprises
Airport Slot Coordination & its Role in the CDM Process
PRESENTATION TO THE TRANSPORT PORTFOLIO COMMITTEE BUS SUBSIDY BUDGET SHORTFALL 2008/09 03 FEBRUARY
Contents Progress status SAPO`s role as distribution partner
PRESENTATION TO THE PORTFOLIO COMMITTEE ON DEFENCE
PRESENTATION TO THE PORTFOLIO COMMITTEE ON PUBLIC SERVICE AND ADMINISTRATION Oversight Report on the Verification of Qualifications in the Public Service.
National Department of Health Presentation to the Standing Committee on Appropriations Public Hearings on the Adjustments Appropriation Bill 05 November.
DBE PRESENTATION TO THE SELECT COMMITTEE – DBE AND SRSA 15 MARCH 2017
PORTFOLIO COMMITTE PRESENTATION
Registration and Enrolment Processes 2015 Academic Year
PORTFOLIO COMMITTEE MEETING
Briefing to the Portfolio Committee on Expanded Public Works Programme
Sales Process March 2017.
FINANCIAL MISCONDUCT PRESENTATION TO PORTFOLIO COMMITTEE ON PUBLIC SERVICE AND ADMINISTRATION/MONITORING AND EVALUATION MARCH 2018.
Expanded Public Works Programme (EPWP) for the Social Sector – Conditional Grant Presentation to the Select Committee on Appropriations | National.
STRATEGY TO REDUCE CASE BACKLOGS TO THE PORTFOLIO COMMITTEE ON POLICE
SELECT COMMITTEE ON LAND AND NATURAL RESOURCES
Progress report on the roll out of GIAMA
IMPLEMENTATION OF IPID RECOMMENDATIONS
PRESENTATION ON THE CONDITIONAL GRANT TO THE SELECT COMMITTEE
SELECT COMMITTEE ON EDUCATION
Presentation transcript:

1

2 FIFA SWC 2010™ ACSA state of readiness presentation 2 March 2010

3 Introduction Airport operational plans – progress and update Operational Plans Venue Transport Operational Plans Air / Land interface Military air-force base – MoU Fuel – Jet A1 Temporary facilities – status Information outstanding Airline slot applications and approval Abuse of slots – block booking Team facilitation agreement with OC / FIFA External Risks Conclusion

4 Airport Operational plan update: ACSA Airports operational plans have been revised after the December 5 th FIFA final draw A daily demand forecast tool (based on approved slots) has been developed The plans are including the revised capacity declaration study done by the appointed DoT consultants Information on airline slot applications have commenced, but they have raised more questions regarding movements. A substantial amount of slots are currently blocked / reserved. This is a cause of concern. There has been some requests from various international charter operators but no confirmation from ATNS with regards receipt of slot applications during the event.

5 RSA vs. France 22 June, 2010 Bloemfontein – 16h00

6

7

8 Current daily traffic

9

10

11 Airport Operational plan update: ACSA has engaged the organising committee through established forum of bi- weekly meetings to share detail updates of planning. On-going discussion with regards the provision of VIP facilities not within the State Protocol mandate ACSA has commenced the training and roll-out of the customer care programme which includes identified various basic language training. The customer care programme will include the FIFA volunteers selected to work at airports. Final stages of negotiation with labour unions and the Department of Labour with regards exemption to ‘Basic conditions of employment act’. Confirmed 24 hour airport operations at airports as per the confirmed match schedule. Engagement with airport stakeholders to gear up for 24 hour operations has begun

12 Venue Transport Operational Plan update (VTOP’s): The venue transport operational plans (VTOP’s), in conjunction with host cities been finalised and submitted to the DoT as 2 nd drafts. The VTOP’s have been revised as per the updated operational plans since the final draw on 5 Dec ACSA is engaging with both public and private transport operators to finalise transport operations at airports A task team has been established to agree on an operational document, which will be the guideline to landside operations during the event. All VTOP’s are completed except Gauteng. ACSA is concerned about the readiness of City of Johannesburg, City of Tshwane and Rustenburg.

13

14 Traffic Circle Overflow Parking Bus Holding Area Road Upgrade Overflow Parking Area Airport Staff “Break” Area Typical Venue Transport Operational Plan (VTOP) Layout – Air / Land interface George Airport

15 Airport Operational plan update: The final airport operational plans will be signed off by the industry for inclusion into the host city plans. Fuel: ACSA is currently a member of the Department of Energy task team established to ensure uninterrupted fuel supply during the event. ACSA has undertaken a capacity supply and demand study with regards fuel consumption and available stock. ACSA has sufficient capacity to STOCK fuel. The supply of Jet Fuel MUST be guaranteed over the world cup period The task team is the overall custodian of ensuring supply to meet the demand.

16 Airport Operational plan update - SAAF: Airports Company South Africa has engaged the SANDF – SAAF for the proposed use of military bases that are currently in co-operative existence at BFN and PLZ airports respectively. Also the use of military bases for diversions and / or long-term parking particularly on match day. Facilitation of VVIP’s at the military bases Site visits have been undertaken to identified alternate-use military bases, to inspect available facilities that could be made available by the SAAF. SACAA to approve the use of military bases identified. A Memorandum of Understanding will be entered between ACSA and the SANDF This will be offered to the various airline operators as alternative diversion or parking airfields

17 Temporary facilities: Siemens has been appointed to provide temporary terminal facilities at Bloemfontein and Port Elizabeth airports. These two airports were are constrained from having sufficient terminal capacity to handle the match-day volumes. These temporary facility structures have been utilised at previous global events for airports to increase processing capacity. These temporary structures have the capacity to process 350 additional 350 passengers arriving or departing passengers per hour. There will be additional airline and airport customer service staff deployed to man these temporary facilities

18.. BLOEMFONTEIN AIRPORT Satellite View Temporary Terminal

19 BLOEMFONTEIN AIRPORT Satellite View

20 BLOEMFONTEIN AIRPORT External 3D View – Air Side

21 BLOEMFONTEIN AIRPORT External 3D View – Arrivals

22 BLOEMFONTEIN AIRPORT Internal 3D View – Screening Area

23 BLOEMFONTEIN AIRPORT Internal 3D View – Check In Area

24 BLOEMFONTEIN AIRPORT Internal 3D View – Waiting Area

25 BLOEMFONTEIN AIRPORT Internal 3D View – Baggage Reclaim

26 Temporary Facilities at Port Elizabeth Airport

Soccer World Cup Facts: 32 Teams 64 Games: Gauteng-21 Games Western Cape-8 Games Eastern Cape-8 Games KwaZulu Natal-7 Games North West-6 Games Free State-6 Games Mpumalanga-4 Games Limpopo-4 Games Team base Camp Locations: (to be confirmed) Gauteng (59%), KwaZulu Natal (16%), Western Cape (10%), North West (10%), Mpumalanga (3%), Northern Cape (1%), Eastern Cape, Limpopo, Free State (0%).

28 Information Outstanding: Final Team Base Camp information now available Finalisation of Team and VIP facilitation processes with LOC and FIFA Finalisation of ticket sales indicating the volume of international spectator purchases Confirmation of accommodation by spectator groups Finalisation of airline slot uptake for the period of the world cup.

29 External Risks Jet A1 Fuel Supply – The supply of fuel to replenish stock MUST be guaranteed throughout the period of the tournament Public (Land)Transport Arrangements must be finalised - The national, provincial and local transport authorities must finalise their plans to transport fans from the transport nodal points to each host city airport, from the airports to the stadia, and from the stadia to airports in a co-odinated and organised manner 24 Hour Service from ATNS – Air traffic Navigation Services must commit to being able to provide 24 hour service especially during the group stages of the tournament. Security Threats – the risk of security incidents associated with hosting an global event of this magnitude

30 Conclusion ACSA Airport operational plans are 90% complete and will continuously be updated as more information becomes available (e.g. Slot confirmation, Team Base Camp confirmation, Spectator accommodation) The Air/Land interface ( facilitation of fans from the airport to the stadium and visa versa) This is a MAJOR CONCERN esp. In Gauteng where there are 3 metros who are not co-ordinating their efforts Agreement that there be a deadline for slot acceptance by airline with punitive measures in place thereafter The lack of information regarding ticket sales and from which countries the highest demands. Long-haul land based transport plans (Intercity and Inter-provincial).

31 THANK YOU