Technical Centers Department Fermilab Long Range Planning Committee Open Forum On Detector R&D October 30, 2003 R. Ray Facilities Available for Detector.

Slides:



Advertisements
Similar presentations
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Advertisements

sTGC for ATLAS Small Wheel upgrade
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
MINER A NuMI MINER A Director’s Review 10 January 2005 H. Budd Univ. of Rochester Optical Cables and Scintillator Extrusions 10 January MINERvA.
GLAST LAT Silicon Tracker Marcus ZieglerAPS April Meeting The GLAST Silicon Tracker Marcus Ziegler Santa Cruz Institute for Particle Physics University.
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
6/8/2006 Particle Physics Division Technical Centers 1 Vacuum Deposition Thin Film Coatings Facility at Lab 7 Eileen Hahn.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
experimental platform
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
Particle Physics and Astrophysics (PPA) Mechanical Engineering Ken Fouts.
Mechanical Work Plan Discussion Bill Cooper Fermilab.
P3MD Labs Introduction to the facilities of the Purdue Experimental Particle Physics research groups.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Precision Dispensing Purdue takes advantage of the gantry’s precision by fixing a 150 micron inner diameter dispensing tip to an EFD dispensing pressure.
ATLAS Tracker Group PPD Staff Talk 28/Nov/ ATLAS SCT Builders Inc Annual Report Mike Tyndel (Group leader & SCT Project Leader) –Richard Apsimon.
J.S. Suh The Second Korean ILC Workshop Plastic Scintillator Detector for ILC Jun-Suhk Suh KNU/CHEP.
Monitoring of FHEP Teacher Research Internship Fermilab – Summer 2011.
0 The LHCb Hadron Calorimeter Rustem Dzhelyadin, (IHEP, Protvino) INSTR02 Conference, BNPI, Novosibirsk, Russia Contents: Œ Design overview  Trigger with.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
서준석, KPS, R&D of Extruded Plastic Scintillator 서 준석 김 동희, 양 유철, 오 영도, 장 성현, 조 기현, KHAN Adil, MIAN Shabeer Ahmad ( 경북대학교 )
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
Advanced Extruded Scintillator R&D Alan Bross. 2 Alan Bross ANL-UChicago-FNAL CM4 June 26, 2008 Context  The extruded scintillator R&D Program started.
Mikhail Kubantsev - Kansas State University 1 Assembly of a Large Area Microstrip Silicon Tracker Some Experience of Construction of D0 SMT H- disk Silicon.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
Medical Device R&D / manufacturing in Mexico for worldwide markets Summary of Technical Capabilities ZIPTEK MEXICO SA DE CV.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
PHENIX Silicon Vertex Tracker. Mechanical Requirements Stability requirement, short and long25 µm Low radiation length
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
FVTX Wedge Assembly WBS , , , , , David Winter Columbia University FVTX Wedge Manager.
November 11 SESAPS 2006 Samir Guragain 1 Calibration, Installation & Commissioning of Sensors for the Alignment of Muon Endcap Chambers in the CMS Experiment.
Phase 2 Production Discussion We would like to review the conclusions reached at Caltech on US involvement in the phase 2 outer tracker This will be presented.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
July 7, 2008SLAC Annual Program ReviewPage 1 Silicon Tracking / Silicon Readout R&D Richard Partridge SLAC / Brown.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
PMT Tests for HF Upgrade Ugur Akgun. HF PMT Proposed Tests On Every PMT: – Rise Time – Negative Pulse Width – Transit Time – Transit Time spread – Single.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
F Fermilab Vertex Effort From a Fermilab Detector R&D Perspective Marcel Demarteau For the Fermilab ILC Detector & Physics R&D Group ALCPG Vertex Detector.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
ATLAS ITk - Activities Common Mechanics group (Lukasz Zwalinski, Paolo Petagna, … ) Plant →PP1 DEMO & BABY DEMO 14/03/2016C. Rossi - INFN Genova1 Detector.
Mike AlbrowSept 8 th 2005Test Beam for FP420 Vacuum Chambers/Detectors 1 Things we need to test (and why) How we could, together with BTeV people, detectors,
Detector Development Facilities Rick Ford Fermilab Science & Technology Review November
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
Detector R&D Resources Jonathan Lewis Neutrino Detector R&D Workshop 21 January 2016.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
EP-DT Thin Film and Glass Service (TFG)
Detector building Notes of our discussion
HV/HR CMOS in Oxford: Facilities, experience, and interests Arndt, Bortoletto, Huffman, Jaya John, Nickerson, Placket, Shipsey, Vigani.
Advanced hybrid detectors in Oxford: Facilities, experience, and interests Arndt, Bortoletto, Placket, Shipsey.
University of Washington, Seattle
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
Status Caltech meeting – discussions of assembly centers, US responsibilities We will try to organize a PS module assembly workshop at Brown April 30 –
EP-DT Thin Film and Glass Service (TFG)
ALICE PD group meeting Andrea Francescon.
Vertex Detector Mechanical R&D Design Questions and Issues
IFR detector mechanics
ILC Detector Activities in Korea
Electronics Manufacturing Processes
Sidet Facilities A snap shot of space and equipment at Sidet and their current use Projected future uses and upgrades Hogan Nguyen, Fermilab May 22nd 2007.
L H C A T L A S International Collaboration on the LHC Project
5/14/2019 Scintillator extrusion at FERMILAB (Joint FERMILAB-NICADD project) Victor Rykalin Victor Rykalin.
Presentation transcript:

Technical Centers Department Fermilab Long Range Planning Committee Open Forum On Detector R&D October 30, 2003 R. Ray Facilities Available for Detector R&D Not in Technical Division! PPD

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, Engineering and Drafting provided by PPD Mechanical Dept. 89 People: 5 Physicists 9 Engineering Physicists 1 Material Scientist 4 Engineering Associates 1 Engineer 1 Computing Professional 2 Designer/Drafters 66 Techs

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, Silicon Detector Center Team of talented, experienced engineers, designers and technicians Extensive experience with:  Micron precision assembly  Engineering of low-mass, stiff structures  Thermal management issues Extensive equipment and resources  >7000 ft 2 of high-quality clean room space  6000 ft 2 operated as class  1000 ft 2 operated as class 5000  17 CMMs of various accuracies and measurement ranges  1 automated optical measurement system (OGP)  2600 ft 2 of burn-in space  6 Kulicke & Soffa wire bonding machines

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, SiDet Projects BTeV Pixel Detector  62 half-stations  ~400k pixels per half station  total of 23*10 6 pixels  pixel size 400*50  m  Total area of 0.5 m 2 BTeV Strip Detector  Potential new SiDet project  1.5 m 2 of planar silicon strip detectors

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, SiDet Projects CMS TOB Detector  5,928 modules for the CMS Tracker Outer Barrel  8M wire bonds  Single-sided detectors, 500m thick, 122/183m pitch  Modules assembled on 688 rods  Modules build using Aerotech Robot Gantry system  Half of work done here, half at UCSB CMS Forward Pixel Detector  4 disks; each half disk has 12 Aluminum blades  12 Mpixels, pixel size 100x150  m  Plaquette with VHDI, HDI, sensors and readout chips wrapped around blade

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, SiDet Projects Run IIb silicon detectors for CDF and D0  Each detector ~8m 2 of silicon CANCELED Cancellation of Run IIb silicon detectors leaves us with excess capacity at SiDet Could take on additional CMS work Could expand into other areas:  Diamond detectors for beam monitoring  CCD cameras for astronomy/astrophysics …

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, Vacuum Deposition and Thin Film Coatings Facility in Lab 7 Run by Eileen Hahn High demand from outside Fermilab Vacuum deposited thin films of precise thickness from sputtering or evaporation. Film thickness as small as 10 Å with tolerances of 1 Å Applications:  Mirror fiber ends  Cerenkov mirrors  CsI photocathodes  Ti & Ni coated microwave absorbers  Gold coated foils …

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, Vacuum Deposition and Thin Film Coatings Other capabilities:  Fiber and connector polishing (P3)  Fiber splicing  Plasma etch cleaning  Vacuum baking and annealing (1000° C)  RGA and outgassing analysis

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, CNC Routing Facility Facility in Lab 8 run by Phyllis Deering for precision cutting, drilling and milling of plastic, wood, G-10, carbon fiber, etc. Parts vary from fractions of an inch to 17’ long.  Two 12’ x 5’ Thermwood routing machines  High-speed 16’ x 5’ Gerber routing machine  Dual table 17’ x 5’ Axxiom routing machine Recent large jobs include:  Optical fiber manifolds for MINOS  CMS muon honeycomb panels, copper cooling plates  GLAST scintillator tile production and assembly

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, Lab 3 Carbon fiber facility and high-quality lab space run by John Krider  2700 ft 2 of clean room space that can be operated at class 1000  CMM with large active volume (1.5 x 1.5 x 4 m 3 )  Ongoing work on BTeV straws, CKM straws in vacuum, beam instrumentation Carbon Fiber Facility (Dave Butler):  Autoclave oven with 12 x 18 x 48 in 3 active area  6 x 6 x 12 ft 3 walk in oven for large carbon fiber structures  Recent work includes carbon fiber cylinders for D0 fiber tracker, numerous supports and widgets for silicon detectors including stave support, bulkheads and support cylinders for Run IIb detectors.

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, Machine Development and Maintenance Facility in Lab 8, run by John Korienek, to design and build specialized machines and equipment. Self contained group with designer, drafting, electronics, programming and machining capabilities. Recent work and current projects include:  D0 fiber mounting machine  Fiber polishing machines  CMS magnetic field mapping machine  Optical Transition Radiator for BD  Cartridge support system for Apache Point Observatory  Many more …

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, Detector Support Center Lab 6 facility run by Karen Kephart Provides technical and mechanical support to experimenters involved in detector construction and prototyping in Lab 6 and in the field. Facilities include:  Wire chamber winding machines  Plastics/scintillator shop  PMT test facility Recent Projects include:  CKM vacuum veto prototype  CDF COT  BTeV straws  GLAST scintillator tiles  Chambers for Beams Division, …

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, PMT Test Facility Facility designed to study the response of PMTs for light levels of a few pe’s to millions of pe’s. Mantained by Hogan Nguyen. It consists of a liquid dye contained in a quartz vessel, pumped into flourescence by a nitrogen laser. The flourescence light is viewed by 2 Pin Photodiodes and a quartz optical fiber carrying light to a dark box containing a PMT. The laser light intensity arriving at the dye can be adjusted by a variable filter wheel. The 2 Pin diodes are digitized by a 20-bit Burr-Brown ADC (0.5 fc/count sensitivity). The linearity of the Pin Diode Burr-Brown ADC combination is better than 0.5% over the entire dynamic range.

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, Scintillation Detector Development Facility in Labs 5 & 6 run by Anna Pla for detector and scintillator R&D Recent work includes:  Extruded scintillator strips for MINOS - process development and QC  K2K scintillator strips  LiF R&D for neutron detection Recently commissioned a new extrusion facility in Lab 5 in collaboration with NICADD

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, SCINTILLATOR EXTRUSION FACILITY Detector R&D, prototyping, Scintillator R&D : Berstorff ZE40 UTS 40-mm twin screw extruder 200 HP, 1200 rpm 25 – 135 kg / h Route 1 and 2 Leistritz Micro 18 GL mm twin screw 500 rpm Up to 3 kg / h Route 1 Morgan-Press G-100T Injection molding machine Up to 100 cm 3 Polystyrene pellets Dopants and additives Inert gas (nitrogen) EXTRUDER (40-mm twin screw) Pelletize (scintillating pellets) Profile extrusion (scintillator bar/strip) Injection molding 12

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, Final Word PPD also has vast mechanical engineering and design resources in the Mechanical Department (Mike Crisler)  Cryo and vacuum engineering, design and support  Finite Element Analysis  Process Engineering, etc. The Technical Centers Department has the people, resources and facilities for conducting state-of-the-art detector R&D. Come and talk to us!