Alfa-Omega Team Coordination LS1 Collaboration Seminar, 27 th November 2014 Anna Chrul, IFJ PAN Kraków.

Slides:



Advertisements
Similar presentations
Alfa-Omega Team General information General information (Anna) W Bellows (Alain) DN200 (Andrea) A.A.A. - TE-MSC-CMI Section meeting Feb 19th, 2013.
Advertisements

Nick Brook University of Bristol The LHC Experiments & Lattice EB News Brief overview of the expts  ATLAS  CMS  LHCb  Lattice.
Modifying the interconnection thermal shields during LS1. Graeme Barlow - TE-MSC-CMI1.
Aw Team - summary of LS1 activities CMI Section Meeting, 16th September 2014 Anna Chrul (HNINP/CERN)
Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. W. Zeuner, W. Riegler, R. Lindner, B. Di Girolamo, G. Corti, C. Schaeffer,
Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
05/05/2006P.Fassnacht - LEAF1 INB – Status report RPS, RGE: done! Zoning Traceability.
Beam Vacuum Quality Control Outline  VSC consolidation  VSC support  Organization  Status Cédric Garion on behalf of TE-VSC Cédric Garion TE/VSC Beam.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
News from DESY. Joachim Mnich Plenary ECFA CERN November 20, 2014 XFEL PETRA III & FLASH II Particle Physics DESY Test beam.
Technical Support Activities in PH-ADO-PO
Assembly Organisation and Duration. Work Site Organisation STORAGE SMA18 UNLOADING CLEAN ROOM CERN-SITE CLEANING MANUFACTURE DIRTY TRIAL ASSEMBLY ISO7.
M. Karppinen TE-MSC-ML on behalf of S. Atieh, P. Cruikshank, M. Duret, J-C. Perez, V. Parma, T. Renaglia, S107, S108, Dubna teams Pressure relief valve.
Technology Department 1 Visit to Hall 180: Presentation of the consolidation process Third LHC Splice Review, November 12, 2012.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
All information relating to safety training and awareness can be found at this address:
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
Michel RAYMOND – April 14 th, 2011 Technical Support Activities in PH-ADO-PO Goals for 2011.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
K. Foraz, S. Prodon TS-IC TS workshop – May 2005 Underground logistics K. Foraz, S. Prodon TS-IC.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Cooling & Ventilation feed-back M. Nonis – EN/CV.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project … Courtesy ….
OLAV3 Engineering Integration and installation of experimental beam pipes: the case of LHC 7/8/20111P.Lepeule for VSC group.
RSSO REPORT TE-MSC Andrea Musso – Virginia Prieto Hermosilla (RSSO’s) Acknowledgments - We wish to thanks: Michele Modena (Safety Link Person TE-MSC) for.
TE-CRG-CE OMP Meeting 06 / 11 / 2014TE-CRG-CE OMP Meeting.
ADO-PO Section Meeting Safety Activities Sigi Wenig (LEXGLIMOS) 8 September 2015.
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
MPE Workshop for LS1 / 22 & 23 Nov. 2012, G. D’Angelo TE/MPE-EE ELQA during LS1 train, Special measurements and NCs Magnet replacement: AIV Splices consolidations:
Work Organisation for Splice Consolidation Francesco Bertinelli 20 minutes presentation, 10 minutes discussion: 12 slides First LHC Splice Review, CERN,
Survey activities during LS1 Dominique Missiaen On behalf of the SU section.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
B.Puccio MPE Workshop for LS1 / 22 & 23 Nov Logistics for DYPB activities Bruno PUCCIO (TE/MPE)
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Long.
Quality Assurance Overview Ranko Ostojic 12 Nov 2012.
D. Delikaris, TE-CRG, LSC 25th Meeting Page 2 October 18 th, 2013 LS1 Committee (LSC)- 25 th Meeting D. Delikaris, TE-CRG Cryogenics activities.
TE-CRG Activities D. Delikaris, TE-CRG.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
Proposed integration of cryo BLMs in LHC during LS1 V.Parma, CERN, TE-MSC With contributions/input from: M.Sapinski (BE-BI) Th.Renaglia (EN-MME) N.Bourcey.
Managing the survey activities during the Long Shut-down 1 Dominique Missiaen D. Missiaen, Iwaa14, October 2014, IHEP, Beijing, China1.
WLCG Accounting Task Force Update Julia Andreeva CERN GDB, 8 th of June,
SMB SMB-SE group L. Scibile 1. SMB Mandate The SMB-SE Group is responsible to provide, to operate, maintain and to renovate the civil engineering infrastructures.
LHC Risk Review Installation Progress Francesco Bertinelli – TE/MSC 5 March, 2009 (20 minutes) On behalf of - and with several contributions from – the.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Third LHC Splices Review SMACC Organisation Scope of work (What’s new since Nov 2011) Organization chart update Human resources Budget Unforeseen? Unexpected?
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
SMACC Tenth report [15 min] 13/09/2013
Space Management and Logistics during LS2
Safety in Construction and Upgrade Phases
LS1 Committee January 24th, 2014
MPE main activities planned for LS2
Overview & baseline of LS2 and roadmap for CRG
Update on development of consolidated insulation system and procedures C. Scheuerlein, 4th DISMAC meeting,
Cryostat design Mechanical design: Thermal screens: Specifications:
LS1 status 24/03/2014.
Operations/Control room organization during commissioning
UPPSALA UNIVERSITY_GERSEMI PROJECT
LS3 Study & Readiness Meetings
Work and Service Supervisor
Presentation transcript:

Alfa-Omega Team Coordination LS1 Collaboration Seminar, 27 th November 2014 Anna Chrul, IFJ PAN Kraków

Alfa-Omega Team Max. resources during LS1: 36 persons (4 Staff, 2 FSU, 30 Collaborators) NTUA (11) WUT (11) JINR Dubna (7)FSU (2) LS1 Collaboration Seminar

LS1 Collaboration Seminar To support management to supervise and coordinate the work of the Alfa-Omega team, i.e.: - to ensure safety and develop technical trainings, grant access rights to the LHC sites for all team members, - coordination of weekly and daily activities for all teams, - technical supervision and problems analysis. Technical link with others sections/groups when necessary, logistic issues… - following up activities and exchange information with other SMACC teams to identify issues which might have impact to Alfa-Omega work, - editing of all technical procedures related to A&O activities, but also: - follow-up of teams integration, leading the members to become familiar with the environment. In addition, solving every-day problems; helping to get more familiar with CERN, thanks to visits in ATLAS, CMS, ALICE, LHCb... In general: to lead all Alfa-Omega team responsibles to organize work of the team respecting the schedule but with priority given to safety and quality. WP4: Follow up of the opening and closure of the ICs

W-bellows openings/closures ICs to close Time frame: August 2013 – June ICs to open (regular openings for the train and performed in parallel special openings “on request”) Time frame: April – November 2013 Andrea Musso - LSC May 17th, 2013 Before LS1: preparation of procedures and dedicated tooling, training on mock up in Bld.180. more than more than 100 ICs to re-open and close for NCs treatment Time frame: June – September 2014 LS1 Collaboration Seminar

Thermal Screens Upgrade ~1900 In the dedicated workshop in Bld.183 ~1900 thermal screens sets were upgraded (a clamp installed instead of the welded lyra; hinge, aluminum bride and snap fasteners were added between the upper and lower shield) M-bellows Protections Consolidation ~5000 ~5000 pcs of M-bellows protections were modified in Workshop (SMI2) ~100 ~100 pcs considered as radioactive – modified in Workshop Bld.109 ~40800 ~40800 inserts installed! ~8500 In the tunnel ~8500 holes were punched in the cryostat’s thermal screens to prepare the installation of upgraded shields. LS1 Collaboration Seminar

A.Chrul, 22/10/2014 Safety Relief Valves (DN200) installation missing DN200 installed in sec.23, sec.45 (partially), sec.78, sec DN200 installed on cryo-magnets exchanged during LS1 2 2 additional DN200 installed for CryoBLM (sec.45 and sec.78) LS1 Collaboration Seminar

Other activities during LS1 Non-standard openings: undulators QBUI.5L4 and QUBI.5R4; QBQM.4R2 Support for CryoBLM installation: QBBI.9R7 and QQBI.9L5 Support for ELQA Helium Spill Test in sec.45 Support for CRG Group (Bld.180) Support for RP samples removal in sec.45 Re-organization of Bld.189 (the storage area for cryo-magnets components) LS1 Collaboration Seminar

Thank you! LS1 Collaboration Seminar