SAFER WP6: Dissemination of Results and End-Users Interface Lead Partner NOA, Athens Contributing partners: GFZ, AMRA, Cedim AG and all partners
WP6.1:Dissemination of results Establishemnt of a web site structured and managed by AMRA ( Steadily updated Currently there are 30 SAFER publications, expected to increase 20 presentations 15 technical articles A long-number of deliverables in the reserved area
WP6.1:Dissemination of results Production of an informative SAFER brochure. Preparation of a special booklet about the main achievements in the 5 test-areas. Schedule to publish a special book on seismic early warning, of international standards (Springer), based mainly on SAFER results.
WP6.2:Interface with end users Creation of an End Users Group (EUG) with representatives from the SAFER test- sites EUG special meetings and discussions organized within the frame of the annual general SAFER meetings Production of a special report about the status of civil protection as regards seismic early warning (prepared by NOA).
WP6.3: Production of a Dynamic Decision Support Module: DDSM General software frame of a DDSM for scenario simulation and rapid response (Cedim AG) In detail test and assessment of the DDSM`s operational capabilities for at least one of the above cities (CedimAG): the Cairo case
WP6.4: Synergy with other EU funded projects Contineous update and contact with other relevant EU projects running in parallel to SAFER. Representatives attend SAFER and vice- versa EU-Projects: NERIES, TRANSFER, SEAHELLARC etc. USA-Project: CSEP (SAFER WP5).