Earthquake engineering and real-time early warning: the AMRA perspective. Iunio Iervolino* and Gaetano Manfredi *Assistant Professor of Structural Engineering.

Slides:



Advertisements
Similar presentations
SAFER Seismic EArly Warning For EuRope Seismic Early Warning
Advertisements

Progress on Early Warning Research in Taiwan
WP 4: Real -Time Shake Maps GRSmap a tool for rapid estimation of ground-shaking maps for seismic emergency management in the Campania Region of southern.
SAFER Project final meeting, Potsdam, 3-5 June, 2009 Nicholas Voulgaris Contribution of the Seismological Laboratory National & Kapodistrian University.
INSTITUTE OF EARTHQUAKE ENGINEERING AND ENGINEERING SEISMOLOGY (IZIIS) University SS. Cyril and Methodius Skopje, Republic of Macedonia.
DAPPOLONIA S.p.A Tsunami Early Warning System Info Day UNESCO/IOC, Paris 31 January 2006.
On going development of a seismic alert management system for the Campania region (southern Italy) A.Zollo(1), G. Iannaccone(2),C.Satriano(1), E.Weber(2),
Seismic analysis and design of
2nd year SAFER Project meeting. Armada Hotel, Istanbul, Turkey June, Information-dependent lead time maps for earthquake early warning in the.
Real-Time Estimation of Earthquake Location and Magnitude for Seismic Early Warning in Campania Region, southern Italy A. Zollo and RISSC-Lab Research.
QUIZ 10/28 1.What does the Richter scale measure? 2.What does the Modified Mercalli Scale measure? 3.What scale is used to describe the amount of damage.
Review of Catalogs and Rate Determination in UCERF2 and Plans for UCERF3 Andy Michael.
theory and practice collide The Next Big One: Detecting Earthquakes and Other Rare Events from Community Sensors Matthew Faulkner,
1 McGill University Department of Civil Engineering and Applied Mechanics Montreal, Quebec, Canada.
PEER 2002 PEER Annual Meeting PEER 2002 Annual Meeting uHelmut Krawinkler Seismic Demand Analysis.
PREDICTION OF RESPONSE SPECTRAL PARAMETERS FOR BHUJ EARTHQUAKE (26TH JANUARY 2001) USING COMPONENT ATTENUATION MODELLING TECHNIQUE By DR. SAROSH.H. LODI.
PROGRAMME VI. MATERIAL-TECHNICAL EQUIPPING AND INSTITUTIONAL DEVELOPMENT OF STATE SERVICES PRESENTED BY THE INSTITUTE SEISMOLOGY OF ACADEMY SCIENCES OF.
Operational Earthquake Loss Forecasting in Italy: Preliminary Results I. Iervolino, 1 E. Chioccarelli, 1 M. Giorgio, 2 W. Marzocchi, 3 A. Lombardi, 3 G.
Nirmal Jayaram Nilesh Shome Helmut Krawinkler 2010 SCEC Annual Meeting A statistical analysis of the responses of tall buildings to recorded and simulated.
Earthquake Early Warning Research and Development in California, USA Hauksson E., Boese M., Heaton T., Seismological Laboratory, California Institute of.
Prague, March 18, 2005Antonio Emolo1 Seismic Hazard Assessment for a Characteristic Earthquake Scenario: Integrating Probabilistic and Deterministic Approaches.
Keck Telescope Seismic Upgrade Design Support - Progress Report Frank Kan Andrew Sarawit 4 May 2011 (Revised 5 May 2011)
Tom Heaton Caltech Geophysics and Civil Engineering.
Creating the Virtual Seismologist Tom Heaton, Caltech Georgia Cua, Univ. of Puerto Rico Masumi Yamada, Caltech.
Envelope-based Seismic Early Warning: Virtual Seismologist method G. Cua and T. Heaton Caltech.
The use of risk in design: ATC 58 performance assessment procedure Craig D. Comartin.
Characterization of Ground Motion Hazard PEER Summative Meeting - June 13, 2007 Yousef Bozorgnia PEER Associate Director.
Framework for Performance-Based Earthquake Engineering Helmut Krawinkler, Stanford U. PEER Summative Meeting – June 13, 2007.
Roberto PAOLUCCI Department of Structural Engineering
SECOND EUROPEAN CONFERENCE ON EARTHQUAKE ENGINEERING AND SEISMOLOGY ISTANBUL | Turkey | Aug , 2014 Feasibility study of a nation-wide Early Warning.
SCEC: An NSF + USGS Research Center ShakeAlert CISN Testing Center (CTC) Development Philip Maechling Information Technology Architect Southern California.
Outline: Lecture 4 Risk Assessment I.The concepts of risk and hazard II.Shaking hazard of Afghanistan III.Seismic zone maps IV.Construction practice What.
December 3-4, 2007Earthquake Readiness Workshop Seismic Design Considerations Mike Sheehan.
Performance-Based Earthquake Engineering
CISN Earthquake Early Warning UC BerkeleyCaltechSCEC/USC U.S. Geological Survey Real-time testing of algorithms statewide Richard Allen, UC Berkeley.
Seismic Hazard Assessment for the Kingdom of Saudi Arabia
Earthquake Hazard Session 1 Mr. James Daniell Risk Analysis
FEASIBILITY STUDY OF A REGIONAL EEW SYSTEM FOR THE EASTERN CARIBBEAN REGION ZUCCOLO Elisa, SALAZAR Walter, DI SARNO Luigi, FARRELL Anthony, GIBBS Tony,
Performance-based Earthquake Engineering – A Very Short Introduction (why taking Dynamics of Structures) Dr. ZhiQiang Chen UMKC Spring,2011.
U.S. Department of the Interior U.S. Geological Survey U.S. Department of the Interior U.S. Geological Survey Natural Hazards Science – Reducing the World’s.
Invited Workshop on Strong-Motion Record Processing Convened by The Consortium of Organizations for Strong-Motion Observation Systems (COSMOS) Pacific.
Disaster Mitigation and Management Organization
1 지진하중을 받는 구조물의 MR 댐퍼의 동특성을 고려한 반능동 신경망제어 Heon-Jae Lee 1), Hyung-Jo Jung 2), Ju-Won Oh 3), In-Won Lee 4) 1) Graduate Student, Dept. of Civil and Environmental.
Creating the Virtual Seismologist Tom Heaton, Caltech Georgia Cua, ETH, Switzerland Masumi Yamada, Kyoto Univ Maren Böse, Caltech.
EERI Seminar on Next Generation Attenuation Models Role of SCEC Ground Motion Simulation Validation Technical Activity Group (GMSV TAG) in SEISM Project.
Structural Dynamics & Vibration Control Lab. 1 Kang-Min Choi, Ph.D. Candidate, KAIST, Korea Jung-Hyun Hong, Graduate Student, KAIST, Korea Ji-Seong Jo,
Large Earthquake Rapid Finite Rupture Model Products Thorne Lay (UCSC) USGS/IRIS/NSF International Workshop on the Utilization of Seismographic Networks.
NEEDS FOR PERFORMANCE-BASED GEOTECHNICAL EARTHQUAKE ENGINEERING
Epistemic Uncertainty on the Median Ground Motion of Next-Generation Attenuation (NGA) Models Brian Chiou and Robert Youngs The Next Generation of Research.
Structural Dynamics & Vibration Control Lab., KAIST 1 Structural Vibration Control Using Semiactive Tuned Mass Damper Han-Rok Ji, Graduate Student, KAIST,
SCEC: An NSF + USGS Research Center Evaluation of Earthquake Early Warnings as External Earthquake Forecasts Philip Maechling Information Technology Architect.
Probabilistic seismic hazard assessment for the pseudo-negative stiffness control of a steel base-isolated building: A comparative study with bilinear.
GROUND MOTION SIMULATIONS AT RAPID RESPONSE SITES IN ISTANBUL, TURKEY Mathilde Bøttger Sørensen 1, Nelson Pulido 2, Anibal Ojeda 3, Kuvvet Atakan 1, Mustafa.
4th International Conference on Earthquake Engineering Taipei, Taiwan October 12-13, 2006 Site-specific Prediction of Seismic Ground Motion with Bayesian.
Measuring Earthquakes Logarithmic scales and human perception.
Ground Motions and Liquefaction – The Loading Part of the Equation
IShake System: Earthquake Detection with Smartphones Presenter: Jize Zhang Da Huo Original Paper:Reilly, Jack, et al. "Mobile phones as seismologic sensors:
Gaetano Festa, Aldo Zollo, Simona Colombelli, Matteo Picozzi, Alessandro Caruso Dipartimento di Fisica; Università di Napoli Federico II.
ShakeAlert CISN Testing Center (CTC) Development
British Seismology Meeting 5th – 7th April 2017, Reading, UK
Eduardo Ismael Hernández UPAEP University, MEXICO
Margaret Hellweg, Richard Allen, Maren Böse,
Management of Earthquake Risks using Condition Indicators
Chapter 12-2 Studying Earthquakes.
Creating the Virtual Seismologist
Engineering Geology and Seismology
Earthquake and Tsunami Program Governor’s Office of Emergency Services
Dr. Praveen K. Malhotra, P.E.
AMRA’s contribution to WP4
Presentation transcript:

Earthquake engineering and real-time early warning: the AMRA perspective. Iunio Iervolino* and Gaetano Manfredi *Assistant Professor of Structural Engineering Department of Structural Engineering, University of Naples Federico II, Italy. SAFER Project Final Meeting – Potsdam 3-5 June 2009

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 Regional Earthquake Early Warning Systems and the ISNet Irpinia Seismic Network (Italy) Commonly used to give distributed estimates of the ground motion right after the event: SHAKEMAPS.

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 Source-to-site distance Seismic network Ground motion at the site IM (i.e. PGA) Structural/non-structural performance/loss EDP (i.e. Maximum Interstory Drift Ratio) Epicenter Signal at the network stations Site-Specific Warning by Regional Networks: Hybrid EEWS BECAUSE OF REAL-TIME SEISMOLOGY!

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 RTS: Rapid estimation of event magnitude MTMT Seismologists (i.e. Allen & Kanamori, 2003) claim it is possible to estimate the magnitude from the predominant period ( ) of the first 4 sec of the P-wave velocity recording

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 RTS: Rapid estimation of event location Other seismologists (i.e. Zollo et al., 2007) claim it is possible to locate the hypocenter with negligible uncertainty within 4 sec from the event origin time Triggered Stations Epicenter

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 PDF of magnitude conditional on the measures of the seismic instruments PDF of distance due to rapid localization method Ordinary Attenuation relationship Distribution of PGA at the site conditional on the measures of the seismic instruments Real-Time Probabilistic Hazard Analysis (RTPSHA) for Hybrid EEWS Negligible uncertainty Iervolino et al., Convertito et al., 2008.

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 Magnitudes distribution Gutenberg-Richter Magnitude Measurements [s] The mean of the tau network measurements is all we need to estimate the magnitude! Iervolino et al., 2007.

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June stations t = 6s 23 stations t = 9s 28 stations t = 11s 30 stations t = 12s M=6 R=110km Event Simulation 2 stations t = 5s

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June stazioni25 stazioni 27 stazioni 4 stazioni 1 stazione Simulazione Hazard M=6; R=110km

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 Real-Time Probabilistic Seismic Hazard Analysis (RTPSHA) - Summary Naples Estimation of Distance Estimation of PGA at the site Estimation of Magnitude

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 Is the Bayesian estimator appropriate also if it tends to underestimate the magnitude? Iervolino et al., 2009.

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 False and Missed Alarm Probabilities Iervolino et al., 2006.

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 PGAc Pc ALARM ! Because the probability that PGA exceeds the limit value is too high When to activate security measures? Decisional Rules

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 Estimation of PGA at the site Time-Dependent Uncertainty in Early Warning Iervolino et al., 2009.

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 Estimation of PGA at the site Which uncertainty really matters in prediction of engineering ground motion parameters? Iervolino et al., 2009.

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 Design Targets False Alarm Probability Lead Time Performances/ Consequences Low Perception Impact(e.g. Elevator) Low Perception Impact (e.g. Elevator) Medium Perception Impact (e.g.Trasportation Interruption High Perception Impact (e.g. Lifelines Interruption )

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 Engineering Requirements of EEWS Quantitative real-time assessment of seismic risk (losses for specific application) Time dependent decision making (quantification of trade-off between lead-time and costs of missed/false alarms) Automated decision for structural control system Consequence-based approach

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 Lead-time maps for the case-study region can be superimposed to real-time risk reduction actions for specific structural systems. These security measures can be classified according to the time required to be carried out.

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 Application of RTPSHA on our school of engineering

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 Event Detection Structure Specific Alert Regional alert Map Real-Time estimation of Magnitude and Location Developed with the group of Aldo Zollo Operating since July ID: utente PW: ergohttp:// :5800/

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 Event detected on 19/11/2008 – 8.17 PM

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 A school classrom equipped with an EEWS terminal: how to set the alarm threshold Lets consider a simple school class equipped with a ringer and suppose that the students are trained to shelter under the desks when the alarm is issued.

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 What causes loss? a)Structural collapse (DS) b)No structural damage, but collapse of lighting (NDS) a)No structural damage, no lighting damage (loss due to false alarm) Total expectaion theorem: The total expected loss is the summation of the expected losses corresonding to these three cases!

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 Real-Time loss assessment Extending the hazard approach it is possible to determine the expected losses condiotioned to the measurements of the seismic network in the case of alarming or not Expected Loss 1. Loss probability depending on the alarming decision 2. Structural damage probability depending on buildings seismic response 3. Seismic response probability depending on hazard 4. Real-time hazard analysis Iervolino et al., 2009.

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June Loss functions No alarm loss Alarm loss (reduced because of security action) No shelteringSheltering of students under desks

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 Expected loss as a function of the seismic instruments measures Expected Loss [] [s] No alarm Alarm Optimal Alarm threshold Iervolino et al., 2009.

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 Early Warning and Structural Control Passive Control: to modify, the stiffnes and/orthe damping so as to achieve a better structural response; Semi-Active Control: to modify just-in-time the dynamic characteristics of the structure as to achieve the optimal response; Active Control: based on the availability of large force actuators able to counterbalance inertial forces due to seismic excitation.

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 This model may be used to study other systems… A structure equipped with a semi-active control device activable by the EEWS: feasibility.

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 PASSIVE DEVICE Variable-Orifice Viscous Dampers

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 Real-Time performance analysis 3. Seismic response probability depending on hazard 4. Real-time hazard analysis Expected Structural performance Iervolino et al., 2009b.

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 Benefit of The EEWS in terms of reduction of Drift Response Iervolino et al., 2009b.

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 Benefit of The EEWS in terms of reduction of Peak Floor Acceleration Iervolino et al., 2009b.

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 Response improvement in respect to the structure without the EEWS

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 Design and Feasibility issues for the engineering use of EEWS for structural control Maximization of the lead time is not the only design target, in some case it is not even the principal design objective; The uncertainties related to the real-time estimations of earthquake features have to be integrated with the models of seismic response of facilities to protect; False and missed alarm probabilities have to be optimized; The alarm thresholds have to be set on the basis of expected losses;

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 References Iervolino I., Giorgio M., Galasso C., Manfredi G. (2009) Uncertainty in early warning predictions of engineering ground motion parameters: what really matters? Geophysical Research Letters, DOI: /2008GL036644, in press. Convertito V., Iervolino I., Giorgio M., Manfredi G., Zollo A. (2008). Prediction of response spectra via real-time earthquake measurements. Soil Dyn Earthquake Eng, 28: 492–505. Iervolino I., Convertito V., Giorgio M., Manfredi G., Zollo A. (2006). Real-time risk analysis for hybrid earthquake early warning systems. Journal of earthquake Engineering, 10: 867–885. Iervolino I., Giorgio M., Manfredi G. (2007). Expected loss-based alarm threshold set for earthquake early warning systems. Earthquake Engn Struct Dyn, 36: 1151–1168.

Iunio Iervolino – Structural engineering and real-time early warning: the SAFER-WP3 perspective. 1 st year: Real-Time Risk Analysis2 nd year: Engineering Issues3 rd year: Structural Applications SAFER Project Final Meeting – Potsdam, 3 – 5 June 2009 Early Warning Special Issue Tentative Title: Prospects and applications of earthquake early warning, real-time risk management, rapid response and loss mitigation; Topics: Risk analysis, system performance evaluation and feasibility studies, design of earthquake engineering applications of EEW, civil protection via EEW; SDEE Editor in chief: Mustafa Erdik; Guest editors: Iunio Iervolino and Aldo Zollo; Expected publication date: Jan 2010.