King Fahd University of Petroleum and Minerals CEM 512 Value Engineering Term Project Turbine Fuel Gas Heater Prepared by: Ahmed S. Al Zahrani ID# 200295.

Slides:



Advertisements
Similar presentations
King Fahd University Of Petroleum & Minerals Value Engineering Study For Car Parking Shade Presented By Ali M. Moussa For CEM 512 :Value Engineering Dr.
Advertisements

Power Plant Construction and QA/QC Section 2.3– Steam Generators
ENERGY FROM WASTES A TRANSFORMATION PROGRAMME Transforming waste and carbonaceous materials into emission free fuel, potable water and energy, through.
Root Cause Analysis Enhancement Jan 21, 2006 Presented by: Mohammed A. Al-Dossary Construction Engineering & Management Quality Management CEM 515 Term.
DISTRICT HEATING: AN OVERVIEW PRESENTED BY: NIELSEN SYSTEMS APRIL 8, 2011.
Heating Control Devices
Dr. Sadi Assaf Professor Construction Engineering and Management
VALUE ENGINEERING Prepared By Mohammed Abdul Hafeez Us Shan PLUMBING OF A VILLA In Relevance to CEM 512 This Project is Prepared for Honorable Dr. SAADI.
King Fahd university of Petroleum and Minerals Construction Engineering and Management Department CEM 512 Unused Space in Mosque To: Prof. Sadi Assaf Prepared.
PLANT DESIGN (I) Prof. Dr. Hasan farag.
Power Plant Construction and QA/QC Section 2.4– Boiler Auxiliaries
ENERGY CONVERSION ES 832a Eric Savory Lecture 12 – Large-scale plants Department of Mechanical and Material Engineering.
Objectives: Understand importance of utility and maintenance system in industry/plant.
Group Meeting #1 January 29 th, 2013 Michael Bentel Jeremy David Erik Peterson Arpit Shah 1.
V.E. of Selecting Flooring Materials KING FAHAD UNIVERSITY OF PETROLEUM & MINERALS College of Environmental Design Construction Engineering & Management.
RETScreen® Energy Efficiency Projects
بسم الله الرحمن الرحيم. King Saud University College of Engineering Department of Industrial Engineering King Saud University College of Engineering Department.
Cost Implications of Architectural Design Variables Ahmed S. Al Zahrani December 2005 King Fahd University of Petroleum & Minerals Department of Construction.
POWER GENERATION TECHNOLOGIES
Combined_Cycle_Power_Plant Prepared by: Nimesh Gajjar.
Engineering Technology Division
CEM 515 Assignment #4 Prepared By Ali S. Fagihi EWPD Rotating Equipment Condition Monitoring Program Workflow Processes.
 Industrial societies spend huge amounts of energy.  Much of it is supply by electricity which comes from generators in power stations.
CNG STATION & GARAGE MODIFICATION CODES & STANDARDS Graham Barker Business Development Manager.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
LAPTOP SELECTION Using Value Engineering By Mazen A. Al-Juaid August 13, 2005 CEM 512 Value Engineering.
Diesel Power Plant Mr.B.Ramesh, M.E.,(Ph.D) By
Engineering Technology Division
Gas Turbine Power Plant
Where We Go Wrong - With Compressors Dick Hawrelak Presented to ES-317y in 1999 at UWO.
Overview of Energy Efficiency & Renewable Energy (Draft version) Prepared by Natural Resources Canada in association with Indian and Northern Affairs Canada.
Operation and Maintenance
Vapor and Combined Power Cycles (2)
CEM512 / 043; King Fahd University of Petroleum and Minerals Department of Construction Engineering and Management Value Engineering CEM512 Term.
Gas Turbine Theory and Construction
Honors Env Sci 7 Dec 2009 Today: This is the only day in class you will have to work on lab reports – please ask questions and get as much done as possible.
KING FAHD UNIVERSITY OF PETROLEUM & MINERALS DHAHRAN, SAUDI ARABIA ARE-512 Life Cycle Costing – Cost Data Bank For By G. C. SOFAT S.K. TYAGI Presented.
“Development of Dairy Cluster in Gujarat under BEE -SME Program "
The way of the future Tomorrows resources Today. Definitions Sustainable Technology ? Purpose: To advance the understanding, development and application.
Organization Structure
Practical Energy Conservation Tips for Steam Propulsion Ships.
Generating Electricity
PRESENTED BY: J.MIKE TYSON S.RAVIKUMAR S.SAKTHI M.SATHISHKUMAR.
Unit 2 -Gas And Diesel Power Plants
Definition of Geothermal Heat Geothermal heat is power from heat stored in the earth.
DRAFT. Introduction  Mechanical Power Reciprocating Engines Turbines Turbines are compact machines (high power to weight ratio, having less balancing.
11. 2 Steam Energy Energy that comes from the push of steam.
TQM Study For Telecom Towers King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality.
Safe Operation Of Farm Equipment
Carl Vance Combustion Air Pre-heater Design Review Presentation ME 486 3/13/03.
Spent Fuel Pool Island Southern California Edison, San Diego Gas & Electric, Cities of Anaheim and Riverside CDP Application #: August 13, 2015.
Energy. Energy and you People of all ages use energy and have the opportunity to reduce their environmental impact through energy efficient behaviors.
1 Cryogenic Design and the 4 He Evaporative Purifier David G. Haase, et al., North Carolina State University.
RON DIPPIPO CHAPTER 21 ENERGY FROM THE EARTH. SUMMARY Ron Dippipo, geothermal energy consultant, Describes the benefits of using renewable energy sources.
DR. REBECCA STEINMAN CHAPTER 22 GOOD CHEMISTRY. SUMMARY Dr. Rebecca Steinman, geothermal energy consultant, Helps nuclear power plants meet federal regulations.
L I NGAYA'S INSTT. OF MGT. AND TECHNOLOGY, FBD. THERMAL POWER PLANT OVERVIEW.
Content: Introduction A Simple Gas Turbine Plant & It’s Working Plant Layout Types according to Cycle 1. Open Cycle Gas Turbine Plants 2. Close Cycle.
Gas Turbine Power Plant
My Internship at Saudi Aramco Company
CACTUS MOON EDUCATION, LLC
Steam / condensate system Condenser
Industrial Assessment Center Database
Gas Power Plant - Layout and Operation
THERMAL ENGINEERING SYSTEMS
Power Plant Technology Combined Cycle and Renewable Energy Power Systems (Assignment 1) by Mohamad Firdaus Basrawi, Dr. (Eng) Mechanical Engineering Faculty.
Desuperheater Heat Transfer Device Manufactured by Maniks
“Desuperheater” High Efficient Energy conservation Device for Refrigeration Use
Potable Water For Villa Complex
Term Project: Challenges in supplying Energy to Central Region
Presentation transcript:

King Fahd University of Petroleum and Minerals CEM 512 Value Engineering Term Project Turbine Fuel Gas Heater Prepared by: Ahmed S. Al Zahrani ID# To: Dr. Sady Assaf August 8, 2005

OUTLINE INTRODUCTION JOB PLAN Information Phase Creative Phase Judicial Phase Development Phase Presentation &Implementation Phase Summary

INTRODUCTION In gas compression plant, the compressors are driven by a combustion gas turbine. For best turbine performance, the fuel gas temperature should be at certain temperature (120 – 140 deg F). Electric Coil heater that provide sufficient heat to fuel gas. The objective is to find better heating medium using Value Engineering Technique.

INFORMATION PHASE The information sources: – Equipment Manual – Plant Operating Manual – Material Control Group – Planners – Colleagues

Performance Criteria Objectives & Desired Criteria: – To give sufficient heat to fuel gas to be in the acceptable range. – To control and maintain that desired condition. Desired Features & Criteria: – Minimum construction cost. – Easy Control and Operation. – Safe Operation. – Easy Maintenance.

Cost Information Cost, $Item 30,000Electric Coil 5,000Wiring & Installation 5,000Instrumentation 40,000Total

Function Identification WHAT DOES IT NOW DO? WHAT MUST IT DO? NOUNVERB HeatSupply TemperatureControl NOUNVERB HeatSupply TemperatureControl PerformanceEnhance MaintenanceMinimize

Function Identification To Meet The Required Condition To Increase Temperature Have Heating Medium WHY? FUNCTION HOW?

Beside the Electric Heater: Steam Jacket. Exchange Heat Between Hot Lube Oil and FG. Exchange Heat Between Process Gas and FG. Eliminate the Heater. CREATIVE PHASE

JUDICIAL PHASE Assigned Weight Raw Score Goals, Criteria, Functions, Features 103A. Construction Cost 72B. Safety 31C. Easy Maintenance 31D. Easy Operation & Control DCB D-1A-1A-2A B-1 B C-1C HOW IMPORTANT 3. Major Preference 2. Medium Preference 1. Minor Preference

JUDICIAL PHASE TOTAL OperationMaintenanceSafetyCost IDEAS Proposed Idea: Electric Heater Steam Jacket Heat Exchange with Lube Oil Heat Exchange with Process Gas Eliminate Heater

JUDICIAL PHASE RankDISADVANTAGESADVANTAGESIDEA 2 High Cost, Difficult Maintenance Easy operationElectric Heater 1Difficult Operation Low Cost, Safe, Easy Maintenance Steam Jacket 3 Not Safe, Difficult Maintenance Low Cost, Easy Operation Heat Exchanging with Lube Oil 4 Not Safe, Difficult Maintenance Low Cost, Easy Operation Heat Exchanging with Process Gas 5 Not Reliable, Affect the turbine Performance No CostEliminate Heating

DEVELOPMENT PHASE INTIAL COSTS, $ ELECTRICAL HEATER40,000 STEAM JACKET7,500 SAVINGS32,500 LIFE CYCLE COSTS, $ ELECTRICAL HEATER7,000 STEAM JACKET3,000 SAVINGS4,000

Will be presented to the operation Manager. Decision will be taken by the Manager. Implementation will be done by Maintenance Division. Presentation & Implementation