European Commission - Directorate-General for Research 19.11.02Warsaw.doc The Sixth Framework Programme (2002-2006) A new Research Framework Programme.

Slides:



Advertisements
Similar presentations
European Commission - Directorate-General for Research IP short.doc 1 FP6 Integrated Projects FP6 Integrated Projects A new instrument for supporting.
Advertisements

European Commission - Directorate-General for Research Networks of Excellence NoEshort.doc 1 FP6 Networks of Excellence A new instrument for.
European Commission - Directorate-General for Research Instr.short.doc 1 Instruments for implementing FP6 priority themes Instruments for implementing.
Information and Communication Technologies (ICT) in the Seventh Framework Programme Coordination actions ICT Calls Jan- March 2012.
European Commission DG Research Co-operative Research Training Session on Ifigeneia Pottaki Research & SMEs DG Research - European Commission Training.
European Commission DG Research SMcL Brussels SME-NCP 23 October 2002 THE 6th FRAMEWORK PROGRAMME Economic & Technological Intelligence S. McLaughlin.
Science, research and development European Commission THE FIFTH FRAMEWORK PROGRAMME B. Magis ACT/campagneinfo/slides/AG/AG6/5FP/conparEN.ppt.
1 Nuclear Fission and Radiation Protection In FP6 Towards a new way of working Hans Forsström European Commission DG Research Directorate J, Unit 4: Nuclear.
Information and Communication Technologies (ICT) in the Seventh Framework Programme Large-scale integrating projects (IPs)
Information and Communication Technologies (ICT) in the Seventh Framework Programme Support actions.
Stefano Fontana European Commission DG RTD Research for the benefit of SMEs SMEs in the.
Funding Schemes. Legal and Financial Rules in the 7th Framework Programme PHOENIX Training Laulasmaa, 1 Sept 2007.
1 Conference, How does research integration work? 17 June 2008 The issue of ‘research integration’ and the role of IPs and NoE in the social sciences and.
European research under FP7 for Small and Medium Enterprises Bari, 16 September 2006 Gianluca Coluccio European Commission ▪ DG Research Unit M4: Research.
Provisional FP7-ICT InfoDay, Torino, 11/12/ The ICT Theme in FP7 How to submit a proposal 2. The Funding schemes.
1 7th Framework Programme Specific Programme “Ideas” European Commission Directorate B November 2005.
“ERA-NET” 24 April Cooperation and coordination of national or regional research and innovation activities (i.e. programmes) FP6 Launch Conference.
Istanbul, 24 April 2003 European Commission - Directorate General for Research DGRTD- Dir B.3 Dr. If.Pottaki SMEs & Research SMEs and Research under the.
Call ref.: FP ACC-SSA-2 (10/2004) Contract Negotiation - Sofia - Bulgaria 10 February, Mrs Marina ZANCHI DG Research Directorate N International.
©M. Horvat, BIT, AT - Nr. 1 How to participate in the 6th EU Framework Programme Manfred Horvat BIT - Bureau for International Research and Technology.
Sixth Framework Programme INTRODUCTION . Contents Contents of FP6 Instruments in FP6 Financing Budgets Timetable Highlights.
1 Framework Programme 7 Guide for Applicants
FP6 Project Organisation. Participating in FP6 How Projects Are Organised FP6 research projects are almost always collaborative 1 and implemented using.
Work Programme for the specific programme for research, technological development and demonstration "Integrating and strengthening the European Research.
RTD-B.4 - Regions of Knowledge and Research Potential Regional Dimension of the 7th Framework Programme Regions of Knowledge Objectives and Activities.
Implementation Instruments for FP6 Thematic Priorities Joseph Prieur - Aeronautics DG Research- Space &Transport.
FP 6 Priority 7: Citizens and Governance in a knowledge-based Society Polish FP6 Launch Conference Warsaw, 26 November 2002 Dr. Peter Fisch DG Research.
Megan Richards RTD FP6 Kick Off Meeting Priority 7 and 8 11 November 2004 Sixth Framework Programme MANAGING FP6 CONTRACTS.
Josefina Lindblom European Commission DG Research - Unit T4: SMEs SMEs in the.
“Thematic Priority 3” Draft Evaluation of IP + NoE.
European Commission Research 1 The 6th FRAMEWORK PROGRAMME - New instruments for Old Mike W Rogers European Commission with thanks.
1 The 6 th European Research Framework Program Future & Emerging Technologies 3 rd QIPC call information event: 17 February 2004 Bratislava Dr. Gustav.
1 SMEs – a priority for FP6 Barend Verachtert DG Research Unit B3 - Research and SMEs.
Unit N4 Conference 6FP Bucharest - 13 February, 2004 HOW TO PREPARE AND MANAGE EU PROPOSALS AND CONTRACTS Yves Motteu.
24 April 2003 FP6 and the new Thematic Priority Instruments FP6 Launch Conference - Istanbul Leonidas Karapiperis European Commission Research DG.
Participation in 7FP Anna Pikalova National Research University “Higher School of Economics” National Contact Points “Mobility” & “INCO”
How to take part in the FP6 Nuclear Fission and Radiation Protection Programme How to take part in the FP6 Nuclear Fission and Radiation Protection Programme.
1 Direction scientifique Networks of Excellence objectives  Reinforce or strengthen scientific and technological excellence on a given research topic.
1 7th Framework Programme “Ideas” 2   Basic research has an important impact on economic performance   Europe is not making the most of its research.
The Seventh Framework Programme for Research and Technological Development (FP7) supporting innovation Epp Tohver-Bulavs 07. November 2007, Tallinn.
Warszawa 18 luty th Framework Programme NMP - 2nd Calls Integrated Projects for SMEs Hervé Péro, Christophe Lesniak DG Research.
1 7 th Research Framework Programme Rules for the Participation.
Poznan 19 April Kwietnia 2005 Poznan FP6 The Next Calls for 2005 Technology Platforms FP7.
Participation and dissemination Rules and Contracts FP6.
European Commission - DG Research - Directorate B – “Structuring the European Research Area” Jean-David MALO – Bucharest, February 12-13, NOT LEGALLY.
European Commission Research 1 Participation in the EU 6th Framework Programme for Research and Technological Development Peter Härtwich, DG Research,
11 November 2002 “FP6 Integrated Projects” Leonidas Karapiperis Research DG europa.eu.int/comm/research/fp6/networks-ip.html.
Megan RichardsHeysel 6FP launch conference 11,12, 13 November /11/2002 Rules for Participation and contractual issues for Integrated Projects in.
Alun JONES EU Network Manager European Agency for Safety and Health at Work 6 th Framework Programme on Research.
FP7 /1 EUROPEAN COMMISSION - DG Research Building a Europe of Knowledge Towards the SeventhFrameworkProgramme
Financial Guidelines FP6 – IST Directorate C 1 st Evaluation proposals co-ordinators Briefing 17 July 2003.
1 Priority 3 NMP: generalities Renzo TOMELLINI Head of Unit “Nanosciences and Nanotechnologies” Directorate “Industrial Technologies” Research Directorate-general.
Commission proposal for a new LIFE Regulation ( ) Presentation to Directors Meeting DK 22 May 2012.
Jela Tvrdonova, The EU priorities:  Use the Leader approach for introducing innovation in the thematic axis  better governance at the local level.
The IST Programme in Framework 6 Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW UK phone fax
NATIONAL DOCUMENTATION CENTRE Athens, 18 December 2002 HELLENIC KICK-OFF EVENT 6th Framework Programme Maria Theofilatou.
1 STREPS INTELLIGENT HERITAGE IN FP6. “Traditional Instruments in FP6 ” An outline of the implementation of Specific Targeted Research Projects (STREPs)
E u r o p e a n C o m m i s s i o n - W a r s a w 2002 Sixth Framework Programme Instruments.
Jörg Niehoff European Commission DG Research - Unit T4: SMEs SMEs in the.
Sixth Framework Programme : Contracts è Legal Framework & General Principles è Contract Structure è Collective Approach l signature and entry.
10 February “FP6 Networks of excellence” Colette Renier Research DG.
The 7th Framework Programme for Research: Strategy of international cooperation activities Robert Burmanjer Head of Unit, “International Scientific Cooperation.
11 October Integrated Projects (IP) “FP6 Integrated Projects” A provisional description of integrated projects as an instrument for implementing.
Richard Escritt, Director – Coordination of Community Actions DG Research, European Commission “The development of the ERA: Experiences from FP6 and reflections.
2. The funding schemes ICT Proposer’s Day Köln, 1 February 2007 The ICT Theme in FP7 How to participate to ICT in FP 7.
1 NOE INTELLIGENT HERITAGE IN FP6. “FP6 Networks of excellence” An instrument for tackling the fragmentation of European research (as of October 2002)
Participation and dissemination Rules
The 6th Framework Programme
Strengthening the foundations of ERA
Presentation transcript:

European Commission - Directorate-General for Research Warsaw.doc The Sixth Framework Programme ( ) A new Research Framework Programme (FP) designed to help realise the European Research Area (ERA) europa.eu.int/comm/research/fp6/ 1 The Sixth Framework Programme

European Commission - Directorate-General for Research Warsaw.doc What is the European Research Area? ULong-term goal of ERA, launched at Lisbon summit 2½ years ago +to create a true “internal market” for research in Europe UWhy do we need ERA? +Europe will fall far short of its economic potential unless it reverses decades of technological underperformance +but for that to happen, Europe must first tackle deep- rooted structural weaknesses in its research and innovation systems +hence ERA 2 The Sixth Framework Programme

European Commission - Directorate-General for Research Warsaw.doc What are these structural weaknesses? UUnderinvestment in the research system +both financial and human +particularly by the business sector UUnfriendly environment for research and innovation +regulatory shortcomings +financial weaknesses +weak culture of entrepreneurship +networking failures +unfriendly social environment… UExcessive fragmentation of public research +coupled to low levels of cooperation and coordination between countries on policies and programmes 3 The Sixth Framework Programme

European Commission - Directorate-General for Research Warsaw.doc Why FP6 became a tool to realise ERA? UThe FP is the only funding arm of EU research policy +primary mission of new FP must therefore be to help realise ERA UPrevious FPs had, however, a different mission +were not designed to tackle our structural weaknesses +were instead designed to support network-building and high quality research  though often failed to mobilise the critical mass needed to achieve ambitious objectives of European dimension +were also overly complex and excessively bureaucratic in their implementation UTherefore, to address its new mission, the concept of the FP had to be totally rethought 4 The Sixth Framework Programme

European Commission - Directorate-General for Research Warsaw.doc Key features of FP6 (1) U For its objective-driven thematic components +much greater concentration on a limited number of topics of strategic importance to Europe  where the research needs to be carried out at the European level +using new more effective instruments capable of mobilising the activities and resources necessary to achieve ambitious objectives of European dimension  integrated projects, networks of excellence, Article 169 Note: these new instruments are the principal innovation in the thematic components of FP6 5 The Sixth Framework Programme

European Commission - Directorate-General for Research Warsaw.doc Key features of FP6 (2) U Better balance between objective-driven thematic research and actions to reinforce Europe’s research base +expanded and better targeted training & mobility actions +new bottom-up action to support emerging S&T (“NEST”) +expanded support for research infrastructures +mainstreaming of most international cooperation, innovation and SME support measures +new science and society action +expanded range of measures to support open coordination in research policy-making +new scheme (“ERA-NET”) to support the networking and mutual opening of national programmes 6 The Sixth Framework Programme

European Commission - Directorate-General for Research Warsaw.doc Key features of FP6 (3) U Simplified and streamlined implementation +to reduce overheads of participating +to speed up procedures +to increase flexibility and autonomy of contractors UFull integration of the associated candidate countries +research is first policy area where these countries are fully integrated into the EU 7 The Sixth Framework Programme

European Commission - Directorate-General for Research Warsaw.doc FP6 budget € billion Focusing and integrating Community research (“thematic”) Structuring ERA (“underpinning”) Strengthening the foundations of ERA 320 (“coordinating”) Euratom (“nuclear”) U€17.5 billion (compared to €14.96 billion in FP5) +an increase of 9% in real terms (a satisfactory result) 8 The Sixth Framework Programme

European Commission - Directorate-General for Research Warsaw.doc Structure of FP6* Q excluding Euratom (7%)  of which, 15% for SMEs 9 The Sixth Framework Programme

European Commission - Directorate-General for Research Warsaw.doc Timetable of FP6 UFebruary 2001 Commission proposals for FP6 UMarch 2002 Invitation to submit EoIs UJune 2002 EP/Council co-decision on FP6 USeptember 2002 Results of EoI exercise published USeptember 2002 Council decisions on SPs U17 December 2002 Initial calls for proposals UMarch-June 2003 First deadlines 10 The Sixth Framework Programme

European Commission - Directorate-General for Research Warsaw.doc “Instruments for implementing FP6 priority themes” A classification of the instruments available to implement the priority thematic areas of the Sixth Framework Programme europa.eu.int/comm/research/fp6/networks-ip.html 1 Instruments for implementing FP6 priority themes

European Commission - Directorate-General for Research Warsaw.doc A wider range of better differentiated instruments U“New” instruments +integrated projects +networks of excellence +article 169 (joint implementation of national programmes) U“Traditional” instruments +specific targeted research projects +coordination actions +specific support actions 2 Instruments for implementing FP6 priority themes

European Commission - Directorate-General for Research Warsaw.doc Principles guiding their design USimplification and streamlining +to minimise the overheads for all concerned +to speed up procedures, especially time-to-contract UIncreased legal and financial security +to avoid weaknesses of FP5 instruments UFlexibility and adaptability +to enable projects to adapt to changing circumstances, both in the science and in the partnership UIncreased management autonomy +to eliminate unnecessary micromanagement UWhile preserving public accountability and protecting interests of the Community 3 Instruments for implementing FP6 priority themes

European Commission - Directorate-General for Research Warsaw.doc Integrated projects UDesigned to generate the knowledge required to implement the priority themes of FP6 +by integrating the critical mass of activities and resources needed +to achieve ambitious clearly defined scientific and technological objectives UEssentially therefore an instrument for supporting objective-driven research of a European dimension +where the main deliverable is new knowledge 4 Instruments for implementing FP6 priority themes

European Commission - Directorate-General for Research Warsaw.doc Networks of excellence UDesigned to strengthen Europe’s excellence on a particular research topic +by integrating the critical mass of expertise needed to provide European leadership and be a world force +through a joint programme of activities  aimed primarily at creating a durable integration of the research capacities of the network partners UEssentially therefore an instrument for tackling the fragmentation of European research +where main deliverable is a durable structuring and shaping of how research is carried out in Europe UEach NoE also has a mission to spread excellence +where training is an essential component 5 Instruments for implementing FP6 priority themes

European Commission - Directorate-General for Research Warsaw.doc Article 169 UEnables the Community to participate in research programmes carried out jointly by a number of MS UPotentially a most powerful instrument +169s integrate national programmes UHowever, may be difficult to use in large numbers +each requires a co-initiative by national programmes and the Commission to generate a proposal +followed by long and complex decision-making, involving a co-decision of Parliament and Council USo far untried +the Commission has now presented a pilot proposal 6 Instruments for implementing FP6 priority themes

European Commission - Directorate-General for Research Warsaw.doc “Traditional” instruments URetained to smooth the transition from FP5 to FP6 +particularly for smaller research actors, including SMEs, and for participants from candidate countries UAlso to support research activities of more limited scope and ambition UThree “traditional” instruments +specific targeted research projects  evolved form of FP5 RTD and demonstration projects +coordination actions  evolved form of FP5 concerted actions/thematic networks +specific support actions  evolved form of FP5 accompanying measures 7 Instruments for implementing FP6 priority themes

European Commission - Directorate-General for Research Warsaw.doc Classification of the instruments 8 Instruments for implementing FP6 priority themes

European Commission - Directorate-General for Research Warsaw.doc “FP6 Integrated Projects” A new instrument for supporting objective-driven research of European dimension (as of November 2002) europa.eu.int/comm/research/fp6/networks-ip.html 1 FP6 Integrated Projects

European Commission - Directorate-General for Research Warsaw.doc What is their purpose? UDesigned to generate the knowledge required to implement the priority themes +by integrating the critical mass of activities and resources needed +to achieve ambitious clearly defined scientific and technological objectives UEssentially therefore an instrument for supporting objective-driven research of a European dimension +where the main deliverable is new knowledge 2 FP6 Integrated Projects

European Commission - Directorate-General for Research Warsaw.doc What activities can be supported? UActivities integrated by an IP may cover the full research spectrum +must contain a research component +may contain technological development and demonstration components +may contain a training component +must ensure the effective management of knowledge, and when appropriate its exploitation  all within a unified project management structure 3 FP6 Integrated Projects

European Commission - Directorate-General for Research Warsaw.doc What is the scale of critical mass? UConcerning resources: each IP must assemble the critical mass needed to achieve its ambitious goals +activities integrated may range up to € several tens of millions  but no minimum threshold, provided necessary ambition and critical mass is achieved UConcerning its partnership: minimum of three participants from three different countries +but in practice likely to be substantially more UConcerning its duration: typically three to five years +but more if necessary to deliver its objectives 4 FP6 Integrated Projects

European Commission - Directorate-General for Research Warsaw.doc UCommunity support will be in the form of a “grant to the budget” UPaid as a contribution to actual costs +that are necessary for the project +determined according to the usual accounting conventions of each participant +recorded in the accounts of the participants  or, if provided in the contract, in the accounts of third parties +excluding indirect taxes, interest… (Note: As each participant is free to use its own accounting conventions, there will be no pre-defined cost categories as in FP5.) What type of financial regime? 5 FP6 Integrated Projects

European Commission - Directorate-General for Research Warsaw.doc UA family of three simplified cost models +FC:full direct and full indirect costs +FCF:full direct costs plus 20% (excluding subcontracts) for related indirect costs +ACF:additional direct costs plus 20% (excluding subcontracts) for related indirect costs UThe FCF model will be an option for SMEs only UThe ACF model is available only for public bodies and individuals (Note: An organisation will normally use the same model in all FP6 instruments.) What are the cost models? 6 FP6 Integrated Projects

European Commission - Directorate-General for Research Warsaw.doc UFor full-cost participants, maximum rates are +50% for RTD components +35% for any demonstration component +100% for any training component +100% for consortium management UACF participants are supported at up to 100% of additional costs for all components of the project +except for consortium management, which may be at 100% of full costs UConsortium management costs chargeable at 100% may not exceed 7% of the Community contribution What are the rates of support? 7 FP6 Integrated Projects

European Commission - Directorate-General for Research Warsaw.doc UAnnual advances UAnnual settlement of payments +each participant to provide a summary cost statement supported by  a management-level justification of costs  a certificate by an independent auditor stating the total costs incurred What is the payments regime? 8 FP6 Integrated Projects

European Commission - Directorate-General for Research Warsaw.doc Flexibility and autonomy of implementation UFor the implementation plan, each year, the consortium +proposes a detailed plan for the coming 18 months +and may propose to update the overall plan  both need approval of the Commission to enter into force UFor the Community contribution +the contract will not specify its distribution between participants nor between activities UFor changes in the consortium +the consortium may itself decide to take in new participants (though without additional funding)  the contract will specify when this must involve a competitive call +the Commission may decide to launch calls to add activities and participants (with additional funding) 9 FP6 Integrated Projects

European Commission - Directorate-General for Research Warsaw.doc Payments and reporting schedule (example of a 4 year contract) Activity report Reported costs Activity reportDetailed work plan Reported costsAdjusted advance Activity reportDetailed work plan Reported costsAdjusted advance Activity report Reported costs Detailed work plan Adjusted advance Detailed work plan Initial advance Months 10 FP6 Integrated Projects

European Commission - Directorate-General for Research Warsaw.doc Evaluation process USimplified proposal-making +reflecting evolutionary nature of the project UEvaluation by a strengthened peer-review system +possibly involving two-stage submission and hearings of applicants… UKey evaluation criteria include +S&T excellence of the proposed project +scale of ambition and potential impact +critical mass in terms of both activities and resources +effectiveness of knowledge management +quality of project management 11 FP6 Integrated Projects

European Commission - Directorate-General for Research Warsaw.doc “FP6 Networks of Excellence” A new instrument for tackling the fragmentation of European research (as of November 2002) europa.eu.int/comm/research/fp6/networks-ip.html 1 Networks of Excellence

European Commission - Directorate-General for Research Warsaw.doc What is their purpose? UDesigned to strengthen Europe’s excellence on a particular research topic +by integrating the critical mass of expertise needed to provide European leadership and be a world force +through a joint programme of activities  aimed primarily at creating a durable integration of the research capacities of the network partners  while at the same time advancing knowledge on the topic UEssentially therefore an instrument for tackling the fragmentation of European research +where the main deliverable is a durable structuring and shaping of how research is carried out in Europe UEach NoE also has a mission to spread excellence 2 Networks of Excellence

European Commission - Directorate-General for Research Warsaw.doc What is a joint programme of activities? UThe JPA consists of a range of “additional” activities +integrating activities  coordinated programming of the partners’ activities  sharing of research platforms/tools/facilities/infrastructure  joint management of the knowledge portfolio  staff exchanges, possibly relocation of staff and equipment  reinforced electronic communications +joint research activities  a programme of joint research to support the network’s goals +activities to spread excellence  training programme of researchers and other key staff  dissemination and communication +all within a unified management structure 3 Networks of Excellence

European Commission - Directorate-General for Research Warsaw.doc What is the scale of critical mass? UConcerning expertise: the network must assemble the critical mass needed to achieve its ambitious goals +will vary from topic to topic +larger networks may involve several hundreds of researchers  but networks may be much smaller, provided necessary ambition and critical mass is achieved UConcerning its partnership: in general at least six +legal minimum of three from three different countries UConcerning duration of Community support: typically five years +but up to seven years, if justified to create a durable integration 4 Networks of Excellence

European Commission - Directorate-General for Research Warsaw.doc What type of financial regime? UCommunity support targeted at overcoming the barriers to a durable integration +barriers are mainly organisational, cultural and human  cannot be quantified in normal accounting terms UHas led to the concept of providing an incentive for integration +taking the form of a fixed grant +calculated mainly on basis of number of “researchers”  that make up the research capacities of the partners on the topic of the network  where a “researcher” has a PhD or at least four years research experience +with a bonus for registered doctoral students 5 Networks of Excellence

European Commission - Directorate-General for Research Warsaw.doc Illustrative grant calculation UThe average annual grant to a network could vary with the number of “researchers” as follows: UIn this illustration, a network of 200 “researchers” supported over 5 years would be granted €17.5 million (plus any bonus for doctoral students) 6 Networks of Excellence

European Commission - Directorate-General for Research Warsaw.doc What is the payments regime? UAnnual advances UAnnual settlements paid on the basis of results +i.e. will depend on a progressive advance towards a durable integration +with an additional check that costs greater than the value of the grant are incurred in implementing the JPA UA results-based payments regime necessitates a robust system of output monitoring +with annual reviews, involving external experts  triggering a yellow flag/red flag, if a review is failed 7 Networks of Excellence

European Commission - Directorate-General for Research Warsaw.doc Flexibility and autonomy UFor the JPA, each year, the network +proposes a detailed JPA for the coming 18 months +and may propose to update the overall JPA  both need approval of the Commission to enter into force UFor the allocation of the Community grant +the partnership will have freedom to distribute it between partners and between activities UFor changes in the network partnership +the partnership may itself decide to take in new partners (though without additional financing) +the Commission may decide to launch calls to add partners (with additional financing) 8 Networks of Excellence

European Commission - Directorate-General for Research Warsaw.doc Evaluation process USimplified proposal-making +reflecting evolutionary nature of the network UEvaluation by a strengthened peer review system +possible two-stage submission, hearings of applicants… UKey evaluation criteria include +potential impact on strengthening Europe’s excellence  extent, depth and lasting nature of the expected integration  ability of the JPA to deliver this integration +collective excellence of the network partners +contribution to spreading excellence +management and governance of the network 9 Networks of Excellence

European Commission - Directorate-General for Research Warsaw.doc Governance of the network UA network’s governance must ensure institutional engagement by the partner organisations +through e.g. a “governing council” of senior representatives from the partners  to facilitate the integration of the partners’ activities 10 Networks of Excellence