June 29, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Summer Standards Meeting Hyatt Regency San Francisco, California.

Slides:



Advertisements
Similar presentations
1 IEEE Power Engineering Society IEEE Standard 762: Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity.
Advertisements

Sub-Committee 13 API SC13 Drilling Completion and Fracturing Fluids June 13, 2012 Westminster, Colorado Paul Scott, Chair Johnna Smith, Secretary David.
2013 Exploration & Production Standards Conference Subcommittee 10 June 25 & 26, 2013 Capitol Hyatt Regency Washington D.C.
TG-8, Drilling Fluid Materials ( Xanthan WG) Develop addendum to current xanthan gum specifications in API 13A/ISO that address anomalies observed.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
1 API SC6 Winter Meeting Update on CSOEM MARG Activities Tim Haeberle Chief Consulting Engineer – Materials and Processes GE Oil & Gas 4 February 2015.
January 26, 2011 TG 3: Oil Mud Testing Procedures While we welcome open participation, non- task group members are asked to hold questions and comments.
SPEC 13A Sec. 16 Drilling-grade Starch
1 Accredited Standards Committee C63 ® - EMC ANSI ASC C63 Subcommittee 7 Spectrum Etiquette Report to C63 H. Stephen Berger Chair, SC7 November 13, 2014.
TG2: Publications SC13 – Report on Work Groups and Publications Sheraton Chicago Hotel & Towers Chicago, Illinois June 19, 2014.
TG # 6 API SC13 Meeting Winter Standards Meeting January 24 – 28, 2011 Fort Worth, Texas.
API 6A 21 st Edition WG Update API Subcommittee SC-6 Plenary Valves and Wellhead Equipment June 19 th 2014.
SC13 API SC13 Drilling Completion and Fracturing Fluids Jan 26, 2011 Fort Worth, TX Paul Scott, Chair Johnna Smith, Secretary David Ekas Vice-Chair.
SC13 Summer 2011 API SC13 Drilling Completion and Fracturing Fluids June 29, 2011 San Francisco, CA Paul Scott, Chair Johnna Smith, Secretary David Ekas.
TG7 Issues on RP 13D Rheology and Hydraulics Mario Zamora Exploration & Production Standards Conference API Subcommittee 13 June 27 – July 1, 2011.
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
API SC13 TG08 WG05 SPEC 13A Sec. 16 Drilling-grade Starch SC13 – Drilling Completion and Fracturing Fluids June 17, 2014.
Rolling Resistance Standards Work at ISO (TC31 WG6) Prepared for GRB Review 19 Sep 2011 Angela Wolynski WG6 Convenor Informal document GRB (54th.
SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
2010 API Summer Standardization Conference Task Group 8, Work Group 4 Report to TG 8 6/29/2010.
SC13 –TG 2 PUBLICATIONS ISO / TC67 / SC3 / WG1 Worthington Renaissance – Ft. Worth, TX 26 Jan 2011 – 8:00 am.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
Task Group 8, Work Group _ API Reference Materials Work Group Work Group Members: BAKER HUGHES INC.; Don Krause* CHEVRON : Keith Morton HALLIBURTON – BAROID.
SC13 –TG 2 PUBLICATIONS ISO / TC67 / SC3 / WG1 Hyatt Regency – San Francisco 29 Jun 2011 – 8:00 am.
San Francisco, CA. SC8 Liaison Report
January 26, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Winter Standards Meeting Renaissance Worthington Hotel, Fort Worth,
1 Accredited Standards Committee C63 ® - EMC ANSI ASC C63 Subcommittee 7 Spectrum Etiquette Report to C63 H. Stephen Berger Chair, SC7 May 1, 2014.
2016 E&P Winter Standards Meeting API 10D Re-Write Work Group Austin, Tx Jan 18-22, 2016.
WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements 2016 Exploration & Production Winter Standards Meeting Austin, TX Joe Shine – Chair.
WG or TG # API SC13TG 10 API 19C Meeting July 15, 2014 Rapid City, South Dakota.
2016 Exploration & Production Winter Standards Conference Subcommittee Workgroup formed to address rewrite:
WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements 2016 Exploration & Production Summer Standards Meeting Washington D.C. Joe Shine –
API 2017 Exploration and Production Winter Standards Meeting
API SC 10, Work Group 13 Update:
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
API SC 10, Work Group Update:
API SC19 HPHT Template (Proposed as SC19TR1)
TG Chair: Mark Brinsden Shell
API SC 10, Work Group 3 Update:
API Subcommittee on Well Cements (SC-10) Triaxial Mechanical Properties Testing of Oilwell Cements 2016 Summer Meeting Report.
Updates from SC18 Summer Meeting
Brent Estes, Chair Carl Stouffer, Secretary Saleh Al-Amari, Vice-Chair
API SC 10 Task Group on Stage Cementing Collars TG Charge Proposal
2017 API Subcommittee 13 on Drilling, Completion and Fracturing Fluids
API SC13TG 10 API 19C Meeting July 16, 2014
2017 Exploration & Production Winter Standards Meeting
Have Instrument, make method; How new methods are made and validated
API RP 17A - Discussion Points
SC-10 Oil Well Cements WG-08; Static Gel Strength Testing Phase IV
API SC6 Valves and Wellhead Equipment
2016 Exploration & Production Standards Conference Subcommittee 10
ISO TC64/SC4/WG2 May 2011 status
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
Impact on SC 6 Documents by Kenneth Young
SC13TG08 Drilling Fluid Materials
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API Subcommittee on Well Cements (SC-10) Triaxial Mechanical Properties Testing of Oilwell Cements 2018 Winter Meeting Progress Report.
API Subcommittee 13 on Drilling, Completion and Fracturing Fluids
WG on Composite Cements: Calgary Meeting 2017
Saleh Al-Ammari SC13 Chair
Saleh Al-Ammari SC13 Chair
2016 Exploration & Production Summer Standards Conference
API Subcommittee 13 on Drilling, Completion and Fracturing Fluids
North America Automated Test Equipment Committee
CSOEM Materials Advisory Resource Group
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
Presentation transcript:

June 29, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Summer Standards Meeting Hyatt Regency San Francisco, California June , 2011

June 29, 2011 TG Charge: Recommend needed changes and develop test procedures for field and laboratory testing of oil- based drilling fluids (results usually published in API RP 13B-2 / ISO and RP 13I / ISO 10416) TG3: Oil Mud Testing Procedures

June 29, 2011 Marvin Pless / Baker Hughes – Chair David Dino / Elementis – Secretary Brent Estes/ Chevron Larry Mitchell / OFITE Paul Scott / ConocoPhillips Tom Shumate / Baroid Catalin Ivan / ExxonMobil Tim Wilkin / M-I TG3 Members

June 29, 2011 WG1: Oil Mud Chemical Analysis Tom Shumate Chair – Baroid - Hibernation WG2: HPHT Direct Indicating Viscometers Keith Morton Chair - Chevron WG3: Particle Size Distribution Testing of OBM / SBM Greg Perez Chair - Halliburton WG4: Measurement of NAF Internal Phase Activity Modifiers Brent Estes Chair - Chevron TG3 Report To SC13

June 29, 2011 TG3 / WG2 HPHT Direct Indicating Viscometers Chairperson Keith Morton / Chevron WG Charge: Develop a recommended operating practice for concentric cylinder viscometers capable of viscosity measurements at pressures greater than 10,000 psig used to characterize the rheological properties of WBM and OBM at elevated temperatures.

June 29, 2011 TG3 / WG2 HPHT Direct Indicating Viscometers Status: Procedure has been revised by Keith Morton but still lacks introduction providing overview for user WG Chair / TG Chair to submit draft to publication TG by August 1, 2011

June 29, 2011 TG3 / WG3 Particle Size Distribution Testing of OBMs/SBMs Chairperson Greg Perez / Halliburton WG Charge: Propose a method(s) for determining PSD’s of NAF’s to be included in API RP13I.

June 29, 2011 TG3 / WG3 Particle Size Distribution Testing of OBMs/SBMs Work Group Members: Tim WilkinM-I Swaco Stephen Ward-SmithMalvern Keith MortonChevron Nathan TarverNewpark Carl LaCombeNOV Fluids Chris SteeleElkem Saleh Al-AmmariAramco Patricia PottsBaker Hughes

June 29, 2011 TG3 / WG3 Particle Size Distribution Testing of OBMs/SBMs WG considerations: Wettability of solids Homogenization methods Obscuration values Generalized parameters to avoid exclusion of existing equipment Adaptability of procedure for use at the rig site – HS&E issues with solvents commonly used for OBM PSD

June 29, 2011 TG3 / WG3 Particle Size Distribution Testing of OBMs/SBMs WG meetings decision: Limit WG scope to fully dispersed sample systems WG action items: Review SOP utilized by laboratories as a basis for establishing procedure for round robin testing Distribute sample to participating laboratories for round robin testing Identify replacement WG chairman as Greg Perez has a new role at Halliburton/Baroid

June 29, 2011 Chairperson Brent Estes/ Chevron WG Charge: Validate activity measurements for estimating concentrations of activity modifiers in NAFs and recommend a methodology for using activity measurements to estimate the soluble activity modifiers to allow calculations for low gravity / high gravity solids content in NAFs. TG3 / WG4 Measurement of NAF Internal Phase Activity Modifiers

June 29, 2011 TG3 / WG4 Measurement of NAF Internal Phase Activity Modifiers Work Group Members: William Benton Cabot David BreedenNewpark Kim Burrows Halliburton / Baroid Andres Diaz BP David EkasMarathon Brent EstesChevron Carl Lacombe NOV Fluids Joe PerezBaker Hughes Randy RayM-I SWACO Paul ScottConocoPhillips Shannon StocksExxonMobil

June 29, 2011 TG3 / WG4 Measurement of NAF Internal Phase Activity Modifiers Held two work group meetings since Winter SC13 meetings in Fort Worth, Texas Established a list of activity modifiers (7) to test. Developed round robin test matrix to determine accuracy and repeatability of hygrometers on select activity modifiers. Next meeting planned for first of August to review results from 1 st round robin tests. Recruiting additional members with laboratories to participate in round robin testing.

June 29, 2011 TG3 / WG4 Measurement of NAF Internal Phase Activity Modifiers Activity Modifiers: Calcium Nitrate Potassium Acetate Sodium Acetate Sodium Formate Potassium Formate Cesium Formate Polyglycerine Does anyone have any to add?

June 29, 2011 Particle Plugging Test Revision for Inclusion in RP13B-2 Met with TG4/WG2, Ceramic PPT Procedure Re-Write New procedure is applicable to RP13B-1, RP13B-2 and 13I WG2 chaired by Larry Mitchell has completed its revisions and will submit to TG2 Publications for final editing/formatting Formatted addendum to be sent to TG3 and TG4 by Cheryl Stark / TG2 for final review followed by electronic ballot for SC13 approval

June 29, 2011 TG3: Oil Mud Testing Procedures Announcement ISO (API RP13B-2) has been published – Thank You Cheryl! Old Business ??? New Business Ron Bland Adjourn