Versatile Link The Versatile Transceiver Towards Production Readiness Csaba Soos on behalf of Manoel Barros Marin, Stéphane Détraz, Lauri Olanterä, Christophe.

Slides:



Advertisements
Similar presentations
The Versatile Link Feasibility Demonstration (Project phase II)
Advertisements

Optical Transceivers: Evaluation of Commercial Optical TRx Luis Amaral CERN – PH/ESE/BE – Opto 10/04/
Versatile Link System Status Report Annie Xiang on behalf of WP1.1 Group SMU Physics March, 2010 ____________________________.
Small Form-factor Versatile Transceiver (SF-VTRx)
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Fast Detector Readout T. Flick University Wuppertal 3. Detector Workshop of the Helmholtz Alliance "Physics at the Terascale" Heidelberg 2010.
Follow-up meeting of the Administrative Agreement between FCT and CERN Vicente Leitão, Pedro (PH/ESE-ME, joined in May 2013) Supervisor: Moreira, Paulo.
Tullio Grassi ATLAS–CMS Power Working Group 31 March 2010 DC-DC converters and Power Supplies requirements for CMS HCAL Phase 1 Upgrade.
A 10Gbps SMPTE 292M compatible optical interface July Sony Corporation.
*Supported by the EU FP7-PEOPLE-2012-ITN project nr , INFIERI, "Intelligent Fast Interconnected and Efficient Devices for Frontier Exploitation in.
First test results with the Gigabit Link Interface Board (GLIB) Paschalis VICHOUDIS CERN PH-ESE-BE on behalf of the GLIB team (M. Barros Marin,
Status of opto R&D at SMU Jingbo Ye Dept. of Physics SMU For the opto WG workshop at CERN, March 8 th, 2011.
16 Sep 2008 Versatile Link Status Report F. Vasey on behalf of the project steering board With input from C. Issever J. Troska.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Calorimeter upgrade meeting Olivier Duarte Upgrade calo FE review Comments : Digital.
Versatile Link Project Description
On behalf of the GBT team
SPS Beam Position Monitors: MOPOS Front-End Electronics Jose Luis Gonzalez BE/BI 22/11/2013.
Versatile Link FPGA-based Bit-Error-Ratio Tester for SEU-hardened Optical Links Csaba SOOS, Stéphane DETRAZ, Sérgio SILVA, Paulo MOREIRA, Spyridon PAPADOPOULOS,
1 L0 Calorimeter Trigger LHCb Bologna CSN1 Assisi, 22/9/04 U. Marconi INFN Sezione di Bologna.
Versatile Link The Versatile Transceiver Development Status Csaba Soos, Vincent Bobillier, Stéphane Détraz, Spyros Papadopoulos, Christophe Sigaud, Pavel.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
High-Speed Serial Optical Link Test Bench Using FPGA with Embedded Transceivers Serial optical data transmission provides a solution to High Energy Physics.
Optical Links CERN Versatile Link Project VL – Oxford involvement CERN VL+ for ATLAS/CMS phase II upgrade – Introduction and aims – Oxford workpackage:
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Mid-term review presentation 3rd August 2010 Ioannis.
Evaluation of Multi-Gbps Optical Transceivers for Use in Future HEP Experiments Luis Amaral CERN – PH/ESE/BE – Opto 16/09/2008.
A Network Architecture for Bidirectional Data Transfer in High- Energy Physics Experiments Using Electroabsorption Modulators PAPADOPOULOS, S. 1,2, DARWAZEH,
CMS HL-LHC EM Calorimeter Upgrade M. Hansen, CERN.
Etam Noah, CERN15 th September 2004Qualification of the CMS Digital Optohybrid Outline: CMS optical digital control links DOH components DOH history and.
The L0 Calorimeter Trigger U. Marconi On behalf of the Bologna Group CSN1, Catania 16/9/02.
Versatile Link Link Model Simulation and Power Penalty Specification of the Versatile Link System Annie Xiang, Datao Gong, Lin Zhu, Chonghan Liu, Tiankuan.
Optical Gigabit Ethernet Group F.O.R.E. Final Presentation Chris Abbott, Ronen Adato, David Larado 4/21/2005.
Characterization of Semiconductor Lasers for Radiation Hard High Speed Transceivers Sérgio Silva, Luís Amaral, Stephane Detraz, Paulo Moreira, Spyridon.
The GBT, a Proposed Architecture for Multi-Gb/s Data Transmission in High Energy Physics P. Moreira CERN – Geneva, Switzerland Topic Workshop on Electronics.
J.Ye / SMU Sept.4, 2007 Joint ATLAS CMS Opto-electronics working group, subgroup C 1 Report from sub-group C, Optical Link Evaluation Criteria and Test.
New Small Wheel muon trigger optical module New Small Wheel muon trigger optical module S. Hou 2014/08/29 Academia Sinica.
Versatile Link The Versatile Transceiver Feasibility Demonstration (Project phase II update) Csaba Soos, Jan Troska, Stéphane Détraz, Spyros Papadopoulos,
HF Front-end status Tullio Grassi 11 Dec Overview The HF FEE will change entirely, including the backplane. Only the cable plant (fiber, copper)
4 March 2009 Versatile Link Project Status F. Vasey on behalf of the project steering board With input from C. Issever J. Troska.
Implementing a 10 Gb/s VCSEL Driven Transmitter for Short Range Applications Irfan N. Ali Michael C. Clowers David S. Fink Sean K. Garrison Jeff A. Magee.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
Paulo Moreira On behalf of the GBT collaboration 2015 – 02 – 23
Links from experiments to DAQ systems Jorgen Christiansen PH-ESE 1.
Level-1 Data Driver Card (L1DDC) HEP May 2014 Naxos 08/05/2014HEP 2014, NAXOS Panagiotis Gkountoumis National Technical University of Athens.
A high speed serializer ASIC for ATLAS Liquid Argon calorimeter upgrade Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group Department of.
1 The Link-On-Chip (LOC) Project at SMU 1.Overview. 2.Status 3.Current work on LOCs6. 4.Plan and summary Jingbo Ye Department of Physics SMU Dallas, Texas.
CMS Upgrade Workshop – Nov 20, H C A L Upgrade Workshop CMS HCAL Working Group FE Electronics: New GOL Nov 20, 2007 HCAL personnel interested in.
1 Preparation to test the Versatile Link in a point to point configuration 1.Versatile Link WP 1.1: test the Versatile Link in a point to point (p2p) configuration.
The Versatile Link System-level Component Tests
Plans and Progress on the FPGA+ADC Card Pack Chris Tully Princeton University Upgrade Workshop, Fermilab October 28, 2009.
Welcome to the 4th meeting of the xTCA Interest Group M. Joos, PH/ESE1 Agenda: Next Meeting: During the TWEPP 2012 conference in Oxford SpeakerTitle M.
Dirk Wiedner 16 th February OT/ITCALO MUON RICH1/TT RICH2 +TFC system.
Opto Working Group Meeting Summary Tuesday 8 March 2011 Tobias Flick and Francois Vasey.
11 Apr The Versatile Link Project CERN CERN Jan Troska, Francois Vasey, et al. Jan Troska, Francois Vasey, et al. Oxford Oxford.
J. Ye SMU Joint ATLAS-CMS Opto-electronics working group, April 10-11, 2008 CERN 1 Test Results on LOC1 and Design considerations for LOC2 LOC1 test results:
Performance characteristics of COTS 10Gb/s Optical Links for SLHC Experiments Jan Troska, Markus Axer, Karl Gill, Robert Grabit, Raquel Macias Jareno,
BLM System R2E and Availability Workshop, B.Dehning 1 Bernd Dehning CERN BE-BI
1 Status report on the LAr optical link 1.Introduction and a short review. 2.The ASIC development. 3.Optical interface. 4.Conclusions and thoughts Jingbo.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Optical Communications for Future Trackers ANL/FNAL/UC/VWS Meeting Nov., 2011 Alan Prosser CD/ESE Fermilab 1.
Jitter and BER measurements on the CuOF prototype G. Dellacasa, G. Mazza – INFN Torino CMS Muom Barrel Workshop CERN, February 25th, 2011.
NA62 GigaTracKer Working Group meeting December 13, 2011 Matthew Noy & Michel Morel Status of test for GTK carrier and components.
1 S. Russo, F. Ameli KM3Net WP3-WP5 Joint Meeting :: Paris :: February 2009 Copper backbone data transmission system: first results.
1 Roger Rusack The University of Minnesota. Projects  Past Projects  11,000 channels of 0.8 Gbs for the CMS crystal calorimeter readout.  1,500 channels.
Martin van Beuzekom, Jan Buytaert, Lars Eklund Opto & Power Board (OPB) Summary of the functionality of the opto & power board.
Current STS Readout Concept 1 FEB 8 STS-XYTER Electrical Interface SLVS/LVDS pairs/FEB ROB GBTx / VL Optical Interface 4 MM fibers /ROB DPB.
Next generation rad-hard links
ACEOLE WP4 Status Report
Optical data transmission for
On Behalf of the GBT Project Collaboration
The Role of Light in High Speed Digital Design
Presentation transcript:

Versatile Link The Versatile Transceiver Towards Production Readiness Csaba Soos on behalf of Manoel Barros Marin, Stéphane Détraz, Lauri Olanterä, Christophe Sigaud, Sarah Storey, Jan Troska, François Vasey, Paschalis Vichoudis CERN PH-ESE-BE

Versatile Link 2 Outline ● Introduction ● VTRx and VTTx prototypes ● Test results ● Towards production ● Strategy ● Production testing ● Something new ● Summary Versatile Transceiver - Towards Production ReadinessTWEPP 2012

Versatile Link Versatile Link Project 3 ● Optical layer linking front-end to back-end up to 150 m distant. ● 5 Gbps ● Two Point-to-point solutions ● 850 nm Multimode ● 1310 nm Single-mode ● Front-end pluggable module ● Rad-hard front-end ● Joint Project Proposal submitted to ATLAS & CMS upgrade steering groups in 2007 and endorsed in 2008 ● Project Kick-off: April 2008 ● Phase I: Proof of Concept (18mo) ● Phase II: Feasibility Study (18mo) ● (Consolidation) ● Phase III: Pre-prodn. readiness (18mo) Versatile Transceiver - Towards Production ReadinessTWEPP 2012

Versatile Link Fully Functional Prototypes VariantLaser DriverTOSAROSAPicture Single-mode VTRx GBLD v4 Edge Emitter Laser InGaAs GBTIA v1 Multi-mode VTRx GBLD v4850 nm VCSEL GaAs GBTIA v1 Multi-mode VTTx GBLD v4850 nm VCSEL- TWEPP 2012Versatile Transceiver - Towards Production Readiness4

Versatile Link Single-mode VTRx TWEPP 2012Versatile Transceiver - Towards Production Readiness5 ParameterNormalizationV3V4 OMAOMA/300uW Eye HeightEye Height/(0.6*OMA) ERER/ /T r (1/T r )/(1/70ps) /T f (1/T f )/(1/70ps) /T j (1/T j )/(1/0.25UI) /D j (1/D j )/(1/0.12UI) Note: Bit rate = 4.8 Gb/s, UI = 208 ps TX Eye RX Eye TX Eye of 2011 vintage

Versatile Link Multi-mode VTRx TWEPP 2012Versatile Transceiver - Towards Production Readiness6 ParameterNormalizationV3V4 OMAOMA/300uW Eye HeightEye Height/(0.6*OMA) ERER/ /T r (1/T r )/(1/70ps) /T f (1/T f )/(1/70ps) /T j (1/T j )/(1/0.25UI) /D j (1/D j )/(1/0.12UI) Note: Bit rate = 4.8 Gb/s, UI = 208 ps TX Eye RX Eye TX Eye of 2011 vintage

Versatile Link Multi-mode VTTx TWEPP 2012Versatile Transceiver - Towards Production Readiness7 ParameterNormalizationCh1Ch2 OMAOMA/300uW Eye HeightEye Height/(0.6*OMA) ERER/ /T r (1/T r )/(1/70ps) /T f (1/T f )/(1/70ps) /T j (1/T j )/(1/0.25UI) /D j (1/D j )/(1/0.12UI) Note: Bit rate = 4.8 Gb/s, UI = 208 ps TX Eye Channel 2 TX Eye Channel 1

Versatile Link Towards Production ● Next steps ● Propose purchasing strategy for LHCb, CMS HCAL, CMS Pix phI, ATLAS SmWh and ATLAS LArg upgrade ● Quantities: 7750 VTTx, 1150 MM VTRx, 200 SM VTRx, 3000 SM TOSA ● Cost estimates (CHF): VTTx 149, MM VTRx 199, SM VTRx 249 ● Firm prices by mid 2013 ● Procurement procedure with tentative schedule ● Quality assurance ● Qualification (all components) ● Lot acceptance/validation (all components) ● Production testing (all manufactured modules) ● Test procedures for the above are being prepared TWEPP 2012Versatile Transceiver - Towards Production Readiness8

Versatile Link Production Test Procedure ● Verify that manufactured modules meet the Versatile Link Specifications, Part 2.1 (EDMS ) ● Static: Light-current curve (LI) ● Dynamic: Transmit Optical Eye (TP2), Receive Electrical Eye (TP4), Receiver sensitivity (BER) ● Test cycle should be optimized ● No changes in electrical/optical connections between cycles ● Target bit error rate of instead of ● Measuring transmitter while receiver sensitivity is measured ● Test automation and report generation ● Results to be stored in a database TWEPP 2012Versatile Transceiver - Towards Production Readiness9

Versatile Link Instrument-based Test System TWEPP 2012Versatile Transceiver - Towards Production Readiness10 Oscilloscope Pattern generator & error detector DUT Ref. TRx Variable Optical Attenuator & Power Meter

Versatile Link FPGA-based Test System TWEPP 2012Versatile Transceiver - Towards Production Readiness11 Oscilloscope Reference RX FPGA + DUT Variable Optical Attenuator + Power Meter

Versatile Link Small Footprint VTRx ● CMS tracker Phase II upgrade ● Need low profile optical interface for the new front-end hybrid TWEPP 2012Versatile Transceiver - Towards Production Readiness12 ● Footprint constraint ● 45 x 15 x 8 mm 3 ● Must include serializer (GBTX, 10 x 10 mm 2 ) ● Keep stand-alone module concept ● Easier prototyping and maintenance ● Reuse work done in the framework of the Versatile Link project

Versatile Link SF-VTRx Prototype TWEPP 2012Versatile Transceiver - Towards Production Readiness13 SF-VTRx versus Multi-mode VTRx SF-VTRx and its test board TX Eye RX Eye

Versatile Link Summary ● Versatile Link moves to pre-production readiness phase ● Fully functional VTRx and VTTx prototypes have been manufactured and tested ● Specifications are met ● Test procedure is being established ● Test setup is being discussed ● New VTRx form factor has been introduced: SF-VTRx ● Further size reduction might be needed ● That will be difficult to achieve using standard LC TOSA/ROSA parts ● More aggressive packaging options will be investigated Versatile Transceiver - Towards Production Readiness14TWEPP 2012

Versatile Link

Test system TWEPP 2012Versatile Transceiver - Towards Production Readiness16 ● Pattern generator and error detector (PG and ED) ● Bench-top instrument, or ● FPGA-based (e.g. GLIB) ● Precision clock source ● High-speed oscilloscope ● Sampling scope with optical head ● Real-time scope with reference receiver ● Variable Optical Attenuator (VOA) ● Optical Power Meter (PM) ● High-speed analog switch ● Optical switch

Versatile Link LC TOSA/ROSA Clip ● Customized commercial solution TWEPP 2012Versatile Transceiver - Towards Production Readiness17