ARISSat-1 from 2010 to 2011 Dayton AMSAT Forum 2011 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager.

Slides:



Advertisements
Similar presentations
AMSAT-NA FOX Satellite Program Review, Status, and Future JERRY BUXTON, NØJY AMSAT VP-ENGINEERING.
Advertisements

Overview of this presentation: Introduction to the BLUEsat Project What are the objectives of this thesis project Overview of testing and integration.
LE005-R2 Mode-UV Linear Transponder William Leijenaar,PE1RAH.
International Space Station. What is ARISS? The ARISS program is a cooperative venture of NASA, the ARRL and AMSAT and other international space agencies.
The ARISS S Band Beacon/Transponder Project. S Band Beacon There is a new S Band beacon and transponder being planned for the ISS-Ham station. This device.
National Aeronautics and Space Administration — Balloon Program 2009 Bridging the Gap to Space The Micro-Instrumentation Package: A Solution for Lightweight.
Software Defined Radio Testbed Team may11-18 Members: Alex Dolan, Mohammad Khan, Ahmet Unsal Adviser: Dr. Aditya Ramamoorthy.
DIGITAL COMMUNICATIONS.  The modern world is dependent on digital communications.  Radio, television and telephone systems were essentially analog in.
Amateur Radio on the International Space Station (ARISS)
Team R3D3 Critical Design Review Kate Kennedy Greg McQuie Nicole Ela Henk Wolda Marisa Antuna Devon Campbell Tyler Smith 10/04/11.
C2V2 Technical Requirements and Constraints
Simulating A Satellite CSGC Mission Operations Team Cameron HatcherJames Burkert Brandon BobianAleks Jarosz.
Satellite communications and the environment of space Images: NASA.
 Owen Garriott, W5LFL was the first person to carry a ham radio into space.  He tried to get a ham radio on the earlier Skylab mission, but NASA rejected.
1 SD Recorder OS-TM-V701A for Driving Security Surveillance.
Continuing Embry- Riddle’s CubeSat Satellite Development Program Presented by Clayton G. Jacobs Embry-Riddle Aeronautical University, Prescott EagleSat.
Press Briefing 2 August 2000 Frank H. Bauer,
Tony Monteiro, AA2TX VP, Engineering AMSAT Forum Dayton Hamvention 2011 AMSAT FOX.
AMSAT Fox-1 Overview AMSAT Engineering Team 2011 Space Symposium.
ARISSat-1 Critical Design Review Orlando, Feb 15, 2010 Mechanical Bob Davis,
AMSAT Fox Satellite Program Tony Monteiro, AA2TX VP, Engineering AMSAT Forum Dayton Hamvention 2012.
ARISSat-1 Control Panel and Safety Circuitry Jerry Zdenek
Belgian User Support & Operations Centre Ham Video On-orbit Functional Commissioning - B.USOC Contribution ARISS Workshop 3 – 5 April 2014 ESTEC.
ISS-HAM Slow Scan Television (SSTV) Project A joint AMSAT-NA And MAREX-NA Project.
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
ARISSat-1 Critical Design Review Orlando, Feb 15, 2010 Inter-Connect Board (ICB) Jerry Zdenek
22/06/101 The FUNcube Project RSGB-October /06/102 Introduction Background information about AMSAT and AMSAT-UK Brief history of “OSCAR” satellites.
ARISSat-1 ARRL and TAPR Digital Communications Conference September 16, 2011.
Louisiana State University (LSU) NSF PACER Program Physics & Aerospace Catalyst Experiences A. M. Espinal Mena, V.Gónzalez Nadal, J. Díaz Valerio Faculty.
ARISSat-1 Critical Design Review Orlando, Feb 15, 2010 U/v Transponder Bill Ress – N6GHz
Amateur Satellites Pt. II How to work the easy sats on a budget.
Solar Energy Solar Energy and NASA NASA developed solar cells for the space program NASA developed solar cells for the space program Used to recharge.
ARISSat-1 Overview ARISSat-1 Team Space Symposium 2010.
USNA-203 Space Communications International Educational Network … Classroom Experience Navy SERB: 28 Aug 2002 Lt Col Billy R. Smith, Jr., USAF USNA Small.
Citizen CATE: Citizen Continental- America Telescopic Eclipse Experiment PI: Matt Penn (National Solar Observatory, Tucson) Seven Co-Is: Mike Pierce (UW,
1 Jet Propulsion Laboratory JPL Flight Team Adam Nikolic Josh Ruggiero Bob Hoffman Dusty Terrill.
SuitSat-1 A Unique Satellite By Gould SmithWA4SXM By Gould Smith, WA4SXM.
ARISSat-1 Critical Design Review Orlando, Feb 15, 2010 SDX Module Anthony Monteiro
ESEO European Student Earth Orbiter. ESEO original GTO orbit ESEO Low Earth Orbit 2008 – today European Student Earth Orbiter.
Group ID:May11-23 Client: Dr. Stephen Gilbert Advisor:Dr. Daji Qiao Members: Kyoung-ho Lim, Michael Gledhill, Michael Patterson, Ryan David, Travis Munn.
ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager.
Science Presentation. Mission Goals & Objectives Verifying U.S Standard Atmospheric Model for altitudes up 100,000 ft Collect data of temperature, pressure,
Digital Video MPEG : Standards, Technology and Applications Lesson 2.
Virtual Reality for Large Audience Participation Abstract Introduction Design Requirements Abstract Introduction Design Requirements End-Product Description.
The History Of Space Exploration Chapter 6 Lesson 2 Page 214.
ARISSat-1 Critical Design Review Orlando, Feb 15, 2010 Solar Panels & Covers Bob Davis, Lou McFadin,
ARISSat-1 Critical Design Review Orlando, Feb 15, 2010 IHU Joseph Julicher
ARISSat-1 Critical Design Review Orlando, Feb 15, 2010 Maximum Peak Power Point Tracker (MPPT) John Charais / Jerry Zdenek
ARISSat-1 Critical Design Review Orlando, Feb 15, 2010 Power Management Anthony Monteiro
Phil Dempsey ISS Vehicle Office July 15, 2014 Inspection Considerations from the ISS Program NASA In-Space Inspection Workshop 2014.
BlueMAC Travel Time, Origin Destination, Alert Notification, Delay and more…
BlueMAC Travel Time, Origin Destination, Alert Notification, Delay and more…
Planetary Lander PDR Team Name
The Koehler Sounding Rocket Launched Carrying Interesting Student-Developed Payloads The sixth flight of a RockSat-X education payload launched on a suborbital.
Team Project: A Surveillant Robot System
ISS Ham Radioskaf V / ARISSat-1
ISS Ham ARISSat-1 Payload Safety Review Panel
PROJECT METEOR: RITSAT1 P08102
AMSAT Engineering Program
RV Solar Panel Installation
Satellite Basics & AMSAT Update
Building Information Systems
Team Project: A Surveillant Robot System
The FUNcube Project – the background
Undergraduate Nano Ionospheric Temperature Explorer
Series 5300 Lithium Cell Formation System
Building The AfriCUBE Transponder.
<Your Team # > Your Team Name Here
<Your Team # > Your Team Name Here
Building Information Systems
Presentation transcript:

ARISSat-1 from 2010 to 2011 Dayton AMSAT Forum 2011 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ARISSat-1 Background Mission from ARISS To provide a STEM (Science, Technology, Education, Mathematics) opportunity for children around the world

ARISSat-1 Players AMSAT – Design, Build and Test the satellite AMSAT – Design, Build and Test the satellite NASA – Provide parts, mentor, safety inspection, interface with Russia, transport the satellites to Russia NASA – Provide parts, mentor, safety inspection, interface with Russia, transport the satellites to Russia RSC Energia – provide battery, interface satellite to Progress, install the Kursk Experiment, transport to ISS, deploy RSC Energia – provide battery, interface satellite to Progress, install the Kursk Experiment, transport to ISS, deploy Microchip – provide hardware & software development support Microchip – provide hardware & software development support

ARISSat-1 Solar Panel Simulator

ARISSat-1 on the ISS

ARISSat-1 NASA Safety Review

Vibration Testing

ARISSat-1 System

ARISSat-1 Structure 09/2010

ARISSat-1 Systems 09/2010

ARISSat-1 Structure

ARISSat-1 Structures

Solar Panels 6 High efficiency panels 6 High efficiency panels Panels donated by NASA from SMEX project Panels donated by NASA from SMEX project 19” x 10.5” 19” x 10.5”

ARISSat-1 Solar Panel Testing

Kursk Experiment Experiment sampled once per orbit Experiment sampled once per orbit Experiment must run on +5V ≤ 100ma Experiment must run on +5V ≤ 100ma Experiment powered for 100 min/orbit Experiment powered for 100 min/orbit Collect up to 2k of data Collect up to 2k of data Then 2k of data downloaded to IHU for 2 seconds, then Exp powered down Then 2k of data downloaded to IHU for 2 seconds, then Exp powered down Data transmitted in BPSK data stream with Telemetry Data transmitted in BPSK data stream with Telemetry

Kursk Experiment Kursk State Technical University Kursk State Technical University Measures the vacuum at different altitudes Measures the vacuum at different altitudes

IHU

ARISSat-1 Cabling

ARISSat-1 Cables

ARISSat-1 Band Plan

Live ARISSat-1 Signals CW, BPSK, Transponder, FM (Voice/SSTV)

ARISSat-1 Signals FM on 2m FM on 2m Voice ID Voice ID Voice Greetings Voice Greetings SSTV video (Robot-36) SSTV video (Robot-36) CW ID and Callsigns CW ID and Callsigns BPSK Experiment and Telemetry Data BPSK Experiment and Telemetry Data New Phil Karn, KA9Q BPSK-1000 encoding scheme, plus old Phase bps BPSK New Phil Karn, KA9Q BPSK-1000 encoding scheme, plus old Phase bps BPSK 70cm/2m Transponder 70cm/2m Transponder

Voice Greetings 24 different greetings 24 different greetings Mainly from children, some adults, and Gagarin Mainly from children, some adults, and Gagarin Secret word Secret word 15 different languages 15 different languages EnglishSpanishRussianFrench ItalianDutchSwedishJapanese ChineseCatalanBengaliPortuguese HebrewNepaleseGerman

ARISSat-1 Video Actual Robot-36 SSTV image transmitted from the ARISSat-1 demo system

ARISSat-1 Video Originally Four cameras on SuitSat-2 Originally Four cameras on SuitSat-2 Originally mounted in an enclosure on the helmet Originally mounted in an enclosure on the helmet ARISSat-1 will have 2 cameras on the top and bottom ARISSat-1 will have 2 cameras on the top and bottom ARISSat-1 top and bottom with a mirror to look sideways ARISSat-1 top and bottom with a mirror to look sideways CPLD analyzing pictures CPLD analyzing pictures Sequenced images converted to Robot-36 and sent to SDX for transmission Sequenced images converted to Robot-36 and sent to SDX for transmission

ARISSat-1 Orlan Battery

Satellites on their way to crating

To the crater’s

Satellites at the crater’s

ARISSat-1 #1 crated

Testing in Russia

Testing Continues

Packing for the Progress

ARISSat-1 Packing

Into the Progress

In the Progress

ARISSat-1 on the ISS

ARISSat-1 Battery Rated for 5 charge/discharge cycles for EVAs Rated for 5 charge/discharge cycles for EVAs Working in a much lower temperature environment Working in a much lower temperature environment Gone through one discharge cycle Gone through one discharge cycle Will be charged before July deployment Will be charged before July deployment

ARISSat-1 Education Mission 1. HELP! Need help developing lessons Need help developing lessons Need volunteers to do demos in schools Need volunteers to do demos in schools 1 hour activity for students 1 hour activity for students

ARISSat-1/ RadioSkaf-V/Kedr The team is looking forward to the late July deployment The team is looking forward to the late July deployment We hope for 2+ months of good operation from ARISSat-1 We hope for 2+ months of good operation from ARISSat-1 We hope to generate interest in STEM education We hope to generate interest in STEM education

ARISSat-1/RadioSkaf-V Questions?