Date:11/19/14 Team Members: Nick Harrison Problem: Material brought back from jobsites is not easy to find in the warehouse, and is not kept track of.

Slides:



Advertisements
Similar presentations
A method for addressing any large problem. Carefully consider the problem. Define the problem. Ask yourself the following questions: What is it that I.
Advertisements

©2014 Competitive Solutions, Inc. All Rights Reserved1©2014 Competitive Solutions, Inc. All Rights Reserved. Seth Davies Managing Partner, Competitive.
TECH Project Healthcare IT Asset Management Analyze Phase Date: 11/13/2013 Team members: Angela Hutson.
Presents. FILE MANAGER This module has been developed for proper management of Files/Documents
TECH581 Fall 2013 Measure Presentation October 23, 2013 Alex Garcia.
Improve the Data Management at The Caring Center Tech 581: Champion/Define Presentation Date: October 2013 LSA Team members: Escobar, Luis Johansen, Shahpar.
1 Hive note entries made easy and effective. Bidata professional Beekeeping software. Bidata professional Beekeeping software.
Date:10/29/14 Team Members: Nick Harrison Problem: Material brought back from jobsites is not easy to find in the warehouse, and is not kept track of.
REVIEW GAME. Game Instructions:  You will be playing in groups.  Each group chooses a sketcher.
Author:Prof.Dr.Tomas Ganiron Jr1 CHAPTER 7 PROJECT EXECUTION, MONITOR & CONTROL PROCESS 7-1 Project Executing process 7-2What is Project monitor & control.
TECH581 Fall 2013 Measure Presentation November 11, 2013 Alex Garcia.
TECH Project Design and Manufacturing Control Process for Formula SAE Analyze Phase Date: 11/19/2014 Team members: Chris Lawrence.
Date:10/1/14 Team Members: Nick Harrison Project 1: Create a system where tools sent to different jobs are kept track of by using barcodes and forms.
Date: 12/12/14 Team members: Nick Harrison Problem: Material brought back from jobsites is not easy to find in the warehouse, and is not kept track of.
G AP Y EARS Hope Enlow. W HY DID I CHOOSE THIS TOPIC ? When applying for college taking a gap year was one of my choices I wanted to do research to make.
Advantage and disadvantage of internet
FUNDRAISING Eat So They Can International Interns.
ETIQUETTE AND EVIDENCE
07 – Project Management Software
COMPGZ07 Project Management Presentations Graham Collins, UCL
Surveys Are a way to gather data. Can be used to gather facts or opinions from people. In order for the survey to be valid, each participant must be asked.
ARS (Attendance Record System) Uffizio India Software Consultants Pvt. Ltd.
Presents. FILE MANAGER This module has been developed for proper management of Files/Documents
Non-Storm Water Discharge (NSD) (Dry Condition) Observation Inspection and Reporting.
Chapter 7 – Developing Audit Trails 1 Process Approach Auditing 5-February-2009 Developing Audit Trails that Make a Difference.
Presents. FILE MANAGER This module has been developed for proper management of Files/Documents
Please find a seat. Keep in mind this will not be your assigned seat!
TECH581 Analyze Presentation Fall 2008 Date: 11/11/08 Team Members: xxxxx xxxxx Sound Removed.
TECH581 Fall 2008 Measure Presentation Date: 10/24/08 Team members: xxxxx Sound Removed.
Customer Tracking System. Lucent designs, manufacturers and sells telecommunications networks and equipment to communications service providers Challenge:
Improving Patient Bed Wait time in Healthcare DATE: 19 NOVEMBER 2014 TEAM MEMBERS: PRIYANKA PRIYANKA. AHMAD ALMATROOD. TECH Analyze Phase.
VOLUNTEER MANAGEMENT SITE VISIT DATE The Leadership Development and Strategic HR Practice Area is presented by American Express. This Service Grant design.
NAAE Communities of Practice connect…share…grow. What is Communities of Practice? A professional networking site just for Agricultural Educators.
DO THE CELEBRITIES AFFECT THE SYSTEM. Effect The celebrities, whether they are sports figures, politicians, actors/actress, make good effect on society.
We Build Healthy Organizations. Clear Direction, Profitable Growth. Healthy Organizations June 20, 2014.
LLLLLLLeeeeeeeeettttteerssssss. Read the definition and then put the letters in the correct order in order to find the word defined.
System Search Engine This module has been developed to ease the handling of multiple and any kind of file, paper/documents and find it by a single click.
Test status report Test status report is important to track the important project issues, accomplishments of the projects, pending work and milestone analysis(
Attendance Manager Keeping track of members’ attendance is quick and easy. Just add the meeting, then check off those who attended. ClubRunner will calculate.
Using JIRA for Issue and Project Tracking
MGT 461 Lecture #27 Project Execution and Control Ghazala Amin.
INSERT A TITLE HERE RULES Divide the class into teams. Teams will take turns answering questions. Each class member will take his/her turn to answer.
ORGANISATIONAL STRUCTURE
TIMESHEET SOFTWARE VERSION 2.0 Effective From: 1-Jul-11 © Copyright Process Group, Sify Software Ltd (Learning SBU) Developed by: Dayanandhan Devarajan.
Presented by: Shelley Shutes. The Goal  Provide an education program which is easily adaptable to different corporate cultures.  Help corporations implement.
Mechanical Engineering 1010 How to Build Successful Teams David Bayless, Ph.D., P.E., Fellow of ASME Gerald Loehr Professor October 09, 2014.
Z26 Project Management Presentations Lecture 5b 9 th February 2006 Graham Collins, UCL.
TECH Project Title: Improving operation of Goodwill retail store Managers and abiding FLSA(Fair labor Standard Acts) for Over Time. Analyze Phase.
HOUSE CUP EASTER ACTIVITIES YOUR HOUSE NEEDS YOU TO GET INVOLVED TO GET POINTS FOR THE HOUSE TROPHY CURRENT POSITIONS 1 ST NIGHTINGALE – 20PTS 2.
Does higher club payroll in Major League Soccer directly relate to success? In US professional sports the big market teams or the teams that have the most.
MyIsern 2.0 Team Onyx. Group Process Team Blue Revisited –Familiar with work styles/schedules. –Focused on strengths and assigned tasks/issues accordingly.
Atlantic Coast Operations Business Intelligence Mobility Project.
Unit 8 – Project Management Lesson 4 –definition of scope.
RWC 2015 Jack Williamson. ASSUMPTION FOR SOCIETAL  ASSUMPTION: I assume that the media coverage in this year’s world cup will be far greater than previous.
 Eugene Deimler.  Your boss has asked your work group to report on corporate child-care facilities.
Tips To Search For Best Warehouse Rental Services.
How to Pass SMRP (Society of Maintenance
ABMU HB Ward G - 17/03/10 Transforming Care
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Step 1-There are many options to search for a provider, 2 are listed on this page Option 1 cont’d- Add the zip code or city/state for area in which provider.
Knowledge Management Why | Who | What | Where | When
7 Deadly Wastes Location of Waste Date: Improvement Team:
Production Scorecard Production Scorecard Production Scorecard
Super Sensors Background Goals Methods
Hypothesis Statement There is a negative weak correlation between the amount of minutes spent reading per day and the amount of minutes watching television.
Thing / Person:____________________ Dates:_________________
BACKGROUND Team Members Project /Sub-Project Title :
Presentation transcript:

Date:11/19/14 Team Members: Nick Harrison

Problem: Material brought back from jobsites is not easy to find in the warehouse, and is not kept track of at all. Goal: Create a system to manage the organization and tracking of the material.

Customer(s)CTQ KPOV(s) KPIV(s) Communication between project managers and warehouse manager Material placed in organized manner, and tracked in system Project Managers Easy system to find correct material Organized material Communication between project managers and warehouse manager Warehouse Manager Material placed in organized manner, and tracked in system Easy system to find correct material

Data Points Time taken searching for material. Whether or not a PM asked the Warehouse manger for help? Did the PM find all the material they were looking for?

According to the data: The communication between the Project Managers and the Warehouse manager does not show a correlation between how long or if the material is found. Whether or not the material is found shows a correlation between how much time is spent looking. If the material is not available, then the Project Manager spends more time looking than if the material is found right away.

The KPIV that causes the most problems with the KPOV is the lack of a system that keeps track of available material within the warehouse. This is shown by the increased time spent looking for material that is not available in the warehouse. If there was a list available, then the Project Manager could easily look at the list and determine if what he needs is in the warehouse or not without wasting time looking for it.