R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.

Slides:



Advertisements
Similar presentations
Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
Advertisements

EXPERIENCE FROM KEK Norihito Ohuchi 2009/11/9-101 Workshop on cryogenic and vacuum sectorisations of the SPL.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
Cavity Integration summary H. Hayano April 25, 2008 ILC-SCRF
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
Heat load study of cryomodule in STF
ESS Cryogenic Distribution System for the Elliptical Linac MBL/HBL - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden.
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
Stress and cool-down analysis of the cryomodule Yun He MLC external review October 03, 2012.
SCU Layout Concept - Minimal Segmentation Joel Fuerst (ANL) SCU 3-Lab Review Meeting Dec. 16, 2014.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Present status of TTF-cryomodules short overview Bernd Petersen DESY MKS March, 7, 2005 Main design features of TESLA-cryomodules Design changes for XFEL-cryomodule.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
Compatibility in the ILC ML. 主なデザインと相違点 BCD ( TTF) STF-BL その他 空洞、シー ル Φ 78 mm ビームパイ プ、アルミヘキサゴ ン Φ 80 mm ビームパイ プ、インジウムヘリ コ LL, Re 入力カプ ラー TTF-III 円筒セラミック窓.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Stress and Cool-down Analysis Yun HE MLC Internal Review 9/5/2012Yun HE, MLC Internal Review1.
CRYOGENICS FOR MLC Cryogenic Piping in the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
56 MHz SRF Cavity Cryostat support system and Shielding C. Pai
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Date 2007/Oct./25 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Report N. Ohuchi KEK 1.Cryomodule & Cryogenics KOM 2.GDE-meeting discussion I.Interface.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
Definition of Work Area H. Hayano, KEK EDR-KOM-cavity at DESY Issues of Cavity and Cavity Package, Work Package discussion.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
What’s Inside a TESLA Cryomodule Tom Peterson Proton Driver Meeting February 9, 2005.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
S1 global: thermal analysis TILC09, April 19th, 2009 Serena Barbanotti Paolo Pierini.
Detail plan of S1-Global H. Hayano (KEK),
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
Plug compatibility discussion TILC09 cavity integration session H. Hayano.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
Low Beta Cryomodule Development at Fermilab Tom Nicol March 2, 2011.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
5K shield removal experiment in STF cryomodule Norihito Ohuchi 2008/11/181ILC08-GDE-Meeting (CHICAGO)
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
S1G Experiment Schedule Plan
Stress and cool-down analysis of the cryomodule
Ti/SS transitions A.Basti INFN-PISA*
Meeting for S1-Global module design Cryomodule and Cryogenics
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Norihito Ohuchi – KEK (presented by P. Pierini - INFN)
Sensors in the S1-G Cryomodules (Updated )
S1-G cryomodule assembly status
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
KEK injector cryomodule
5K Shield Study & HL Measurements
Summary of the checking items of the Module-C design
IHEP Cryomodule Status
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
Alignment of Main Linac Cryomodule (MLC)
CEPC-650MHz Cavity Cryomodule
Presentation transcript:

R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction Status of Cryostat 3.R&D Studies of Cryostat Components 4.Summary

Gaining the experience of the long cryostat for the S.C. cavity. R&D of the high performance and the low cost ILC cryostat. Cooling two types of the cavities of 35 MV/m and 45 MV/m down to 2 K in STF, and measuring the thermal characteristics. Starting point of the STF cryostat design: TESLA TYPE III Cryomodule R&D and study items for the STF cryostat –Understanding the TESLA design from the thermal and mechanical points of view. Temperature profile and heat load of the components, and construction errors. –R&D component SUS-Ti joint between the helium vessel and cryogenic lines. –Magnetic shield Measurement of the remnant field in the shield and the magnetic characteristics of the shield material. –Survey of the low cost quadrupole magnet system (conduction cooling) Target of the cryostat R&D in KEK Strategy of the cryostat R&D STF-Cryostat Design (1)

Two cryomodules are connected with bellow tubes. –Four cavities designed for 35 MV/m and 45 MV/m are assembled in the individual cryostat. –The total length of two cryostats is 13.2 m. The vacuum vessel of the TESLA TYPE III cryomodule has the length of 11.4 m including one quadrupole. STF-Cryostat Design (2) Design Overview of STF Cryostat

The design of the cold mass are same as the TESLA TYPE III cryomodule. –Cold mass : support post, gas return pipe, thermal radiation shields (5 K, 80 K), cooling channels –The diameter of the vacuum vessel is mm, same as the TESLA cryomodule. The helium vessels, frequency tuners and input couplers between the cavities of 35 MV/m and 45 MV/m have different configurations. STF-Cryostat Design (3) Cross sections of STF Cryostat 80 K Thermal Radiation Shield 5 K Thermal Radiation Shield Alignment Target Gas Return Pipe (GRP) Input Coupler 35MV/m Cavity45MV/m Cavity

STF-Cryostat Design (4) Cooling scheme and heat loads Cryostat Static 35MV/m Static 35MV/m Dynamic 45MV/m Static 45MV/m Dynamic Total S+D 2K K K STF-Phase-1 Cryogenic system : 20 2K (Cold box : K) Calculated Heat Load for STF-Cryomodule (W) Heat loads via signal wires are not included.

STF-Cryostat Design (5) Calculated pressure distribution Calculation model Q c : 10/8 W or 30/8 W m: evaporated helium gas Pressure drop along the system = 2.27 Pa for 10 W, Pa for 30W Temperature at each cavity = K for 10/8 W, K for 30/8 W

Gas return pipes (GRP) are connected with the support posts which have the alignment targets. The helium vessels for cavities are supported from the GRPs. The surfaces for the connection are processed by a milling machine with the target precision of 0.05 mm. Construction of STF-Cryostat (1) Gas Return Pipe Cryostat Connection Bellows

Thermal radiation shield : aluminum, vacuum vessel : carbon steel (used for magnetic shield) These components have been delivered from the company (Hitachi) on 24th March. Construction of STF-Cryostat (2) Vacuum vessel for 45 MV/m cavities Thermal radiation shield

The four support posts for the STF-cryomodules have been delivered from INFN Milano on March 3 under the research collaboration between INFN and KEK. The support post on the inlet side is fixed to the vacuum vessel, and the other one has a sliding function. –The position change of the sliding support post by thermal contraction is calculated to be 8.4 mm. The cavity helium vessels are hold with sliding supports from the Gas Return Pipes. –The axial positions of the helium vessels are decided by the invar rods. Construction of STF-Cryostat (3) Fixed Slide:8.4mm FixedSlide:1.4mm Fixed Slide:1.4mm Invar rod Support post Sliding cavity support

Material of helium vessel for the 35 MV/m cavity and the TESLA cavity : Ti –The SUS-Ti junction is being studied for the connection between the cooling channel pipes (SUS) and the helium vessels (Ti). Samples of two types (Hot Isostatic Pressure, Friction Pressure Welding) have been manufactured. Mechanical strength tests have been completed. –For both methods, the mechanical strength at the junction was almost same as Ti at room temperature. Helium leak test at 2 K (super-leak) will be performed next week. R&D Studies of Cryostat Components (1) SUS-Ti junction by HIP SUSTi SUS-Ti junction (35 MV/m cavity helium vessel) SUS-pipe Ti helium vessel

The heat losses of the components in the cryomodule will be estimated by the temperature profile and the FEM calculation. –Temperature sensors  2K~ 5K (input coupler, helium vessel etc) : Cernox temperature sensor (54 points)  4K ~ 300 K (support post, thermal radiation shield etc) : PtCo temperature sensor (44 points)  > 80K : Copper-Constantan thermo-couple temperature sensor (58 points) The heat loss of the system at the 2 K region will be measured by the attainable saturated pressure value of the He-II with the pump system. R&D Studies of Cryostat Components (2) Heat Loss Measurement

From the test results of the TESLA cryomodule, the 1st thermal cycle induced the position change of GRP with respect to the original position. Measurement of cavity position during cool-down and warm-up : WPM sensors  Helium vessel : 2 sensors in axial direction 16 sensors for cavity helium vessels  GRP : 5 sensors for one cryostat 10 sensors for GRPs R&D Studies of Cryostat Components (3) Wire Position Monitor GRP Cavity Helium Vessel

The cryomodule design for the STF phase-1 is based on the TESLA type III cryomodule.  Calculated heat loss of the cryostat at 2 K : 12.1 W  Cooling power of cryogenic system at 2 K : 20 W Manufacturing the cryostat components have been completed, and they have been delivered from the company.  The four support post were delivered from INFN under the research collaboration between INFN and KEK.  The assembly of these components and the cavities will start in this summer. R&D studies of the cryostat components;  SUS-Ti junction The junctions have been manufactured by two methods (HIP, friction pressure welding). The helium leak test at 2 K will start next week.  WPM The performance test will start in April. Summary