Subjects: Traceability / Pocess Control / Inspection

Slides:



Advertisements
Similar presentations
AS9102 First Article Inspection Report
Advertisements

Transition from Q1- 8th to Q1- 9th edition
1 HYDROSTATIC TESTING Approved for Public Release.
Copyright Alan Rowley Associates Steps to an Accurate Result Select a method and validate it as suitable for the purpose envisaged. Establish that.
First Article Inspection Report
ISO 9001 : 2000.
Gilbarco Printer Assembly Process Flow Overview Next Generation Contract Manufacturing.
Quality Assurance System
Supplier SQM Participation. 2 | MDT Confidential What is SQM? Stands for Supplier Quality Managment –Formally referred to as SPACE and SPICE Is a system.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Quality Management System
Software Project Management
OPTIMISING CHEMICAL ANALYSIS FOR THE WFD BY QUALITY ASSURANCE PROCEDURES & ACCREDITATION An Overview OPTIMISING CHEMICAL ANALYSIS FOR THE WFD BY QUALITY.
Quality control of raw materials In-process control
D. Keane June Internal Quality Audits (4.14) -ISO Requirements for Internal Audits -The Audit Process -Templates for Meeting Requirements.
Requirement engineering for an online bookstore system
External Defibrillators: Recalls, Inspections, and the Quality System Regulation Melissa Torres Office of Compliance December 15, 2010.
ISO 9000 Certification ISO 9001 and ISO
Produce Safety University: Take-Home Training for Professional Standards Buying Smart, Buying Safe 1.
First Article Inspection
Objectives 4 Understand the ISO standards. Why are standards required? 4 Need standards to ensure that a term means the same for all 4 Need company standards.
Regulatory Overview.
Introduction to ISO New and modified requirements.
Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) Receiving Inspection Process for Components and Finished.
REPUBLIC OF CROATIA STATE OFFICE FOR METROLOGY Conformity Assessment Procedures of the „New Approach“ of EU illustrated by the Measuring Instruments Directive.
Good Hygiene Practices Module 2, Module 11 Recall and Traceability.
G223 Supplier Audit Questionnaire 2013 Version update 25 Oct 2013.
ISA Quality System. ISO9001-VISION2000 DNV (Det Norske Veritas) ISA Quality Manual Continuous improvement Manufacturing & control plans Procedures.
Quality Cost Quality Cost- those cost associate with the non achievement of product or service quality. Types Prevention Cost –Planning, Document, Control,
WHY CONFORMITY ASSESSMENT?. What is conformity assessment?  Conformity assessment is the name given to processes that are used to demonstrate that a.
Your measurement technology partner for global competitiveness CSIR National Metrology Laboratory The National Metrology Laboratory of South Africa Feedback.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
Continuing Analysis and Surveillance System (CASS) 03/06/59 1 AIRCRAFT MAINTENANCE Section 10.
QSR and GLP What exactly are these?.
5th Phase: 5th Phase: CLOSING PROJECT  Assess the project goals  Obtain client acceptance  Installation of the final product  Conduct post-implementation.
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
Field-Only Certification Presented by Frank Hall, Laboratory Certification Coordinator.
Demand A Schedule Showing the Consumers are Willing and Able to Purchase At a Specified Set of Prices During A Specified Period of Time Amounts of a Good.
ISO RECORDS. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Describe.
DOCUMENTATION ISO/IEC 17025:2005 Documentation.
Produce Safety Purchasing 1. Objectives At the end of this training session, participants wil be able to: 1.Identify differences among produce vendor.
Inspection & Test Plan (ITP) / Manufacturing Process Quality Plan (MPQP) - training of suppliers to FMC Technologies, Norway QRL FMC Standard.
November 6, 2013 Purchasing Controls & Supplier Quality Best Practices Beyond Compliance for the Medical Device Industry AdvaMed 2013 Bernie Liebler Technology.
AMEK 2013 SCIENTIFIC CONFERENCE & EXHIBITION
NCSLI 2014 Traceability Considerations for the Characterization of Measuring Systems Charles D. Ehrlich NIST Office of Weights and Measures Physical.
Calibration Web Innovations 2017.
BUSINESS PROCESSES MAP
IECEx 02 Audits according to OD 005 Theo Pijpker
Presentation by Team 2.
First Article Inspection
4.5 Checking and Corrective Action Monitoring and Measurement
Traceability of Gas Pipeline Materials Research & Materials Manager
Quality Control training
QUALITY MANAGEMENT SYSTEM
برنامه‌ريزي منابع انساني
TURTLE DIAGRAM GAGE CALIBRATION
Customers Customers Input Output Product
World Health Organization
First Article Inspection
“…a Commitment to Extended Partnership…”
SAP QM Prepared by Lavanya.M.
Guide for successful completion of First Article Inspection Reports
Guide for successful completion of First Article Inspection Reports
Quality Audits, and How to Survive them
Chapter 11 Quality Control.
EMS Development Course for Government Agencies
Responsabilitati Management Masurare;Analiza&Imbunatatire
Responsabilitati Management Masurare;Analiza&Imbunatatire
Quality Systems ISO 9000 Series QS-9000 TE-9000 AS9000
Presentation transcript:

Subjects: Traceability / Pocess Control / Inspection Subject: Traceability / Process Control / Inspection Subject: Traceability / Process Control / Inspection Subject: Traceability / Process Control / Inspection Quality Audit Stock Management Quality Management Contractual Documents Purchases Idenfication Traceability Process Control Product Quality Control Calibration Non Conform Inspection

DECATHLON QUALITY AUDIT 1, Traceability This presentation tool has to be writen by Product Family. This presentation is done for finish good as well as for component The purpose is to make a synthesis of the Purchasing Polcy to be presented to DPP, Passion Brand and Component Brand. It has to be updated every year The PAC is writen by the Industrial Buyer. The PAC is based on panel analysis, international context, Passion Brand PCC and Supply policies, Component Brand strategies as welle as Decathlon main strategies All actions plan and purchasing gains figures still remains in THE BOARD. Purchasing team manager have the responsability to validate the pruchasing gain.

1,Traceability 1.1 Supplier has defined list a main components to trace. If Decathlon specified components to trace, there are included in this list. 1.2 Supplier is able to trace back to lots of componants/raw materials for the main components. 1.3 Supplier is able from traceability number to identify quantity of article. 1.4 Traceability specified in cdc is applied.

2,PROCESS CONTROL 2.1 Parameters follow up 2.2 Maintenance 2.3 Production Planification

2,PROCESS CONTROL

3,Inspection 3.1 General 3.1.1 Inspection reports are keep at least 6 months 3.1.2 Inspection methods are formalized 3.1.3 Inspection / testing methods are applied and respected. 3.1.4 Values to obtain and tolerances are defined. 3.1.5 The tolerances specified are respected. 3.2 Incoming Inspection (incoming laboratory tests are included) 3.3 Online Inspection (inline laboratory tests are included) 3.4 Final inspection (final laboratory tests are included) This presentation tool has to be writen by Product Family. This presentation is done for finish good as well as for component The purpose is to make a synthesis of the Purchasing Polcy to be presented to DPP, Passion Brand and Component Brand. It has to be updated every year The PAC is writen by the Industrial Buyer. The PAC is based on panel analysis, international context, Passion Brand PCC and Supply policies, Component Brand strategies as welle as Decathlon main strategies All actions plan and purchasing gains figures still remains in THE BOARD. Purchasing team manager have the responsability to validate the pruchasing gain.

3, Inspection

Welcome your Comments and Question Quality Audit E N D Thank You. Welcome your Comments and Question