PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde.

Slides:



Advertisements
Similar presentations
PACS IHDR 12/13 Nov 2003 Overview and Mechanical/Thermal IFs to FPU 1 MPE J. Schubert PACS IHDR.
Advertisements

PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board1 D. Kampf KAYSER-THREDE.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
PACS IHDR, Garching 12/13 Nov 2003 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, A. Böhm, A. Bohm (Hardware) R. Vavrek, U. Klaas (ICC) J. Katzer,
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays1 IBDR Hilmar Richter ANTEC-GmbH Germany Günter Bollmann, Peter Dinges, Otto Frenzl, Heidrun Köppen,
PACS IBDR 27/28 Feb 2002 PACS FPU FPU R. Graue, D. Kampf Kayser-Threde.
GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 1 GLAST Large Area Telescope: Calorimeter (CAL) Subsystem.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
PACS IHDR 12/13 Nov 2003 PACS FPU Mirrors and Black Paint R. Graue, D. Kampf Kayser-Threde.
PACS IHDR 12/13 Nov 2003 PACS FPU Optics: Concept and Alignment R. Graue, D. Kampf Kayser-Threde.
PACS IBDR 27/28 Feb 2002 PACS CRE1 PACS CRE development Ybe Creten, Patrick Merken, Jan Putzeys, Vic Fonderie, Chris Van Hoof IMEC.
PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard Katterloher.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
From Research Prototype to Production
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
Autodesk Inventor ® Professional Design, Validate and Document the Complete Machine Autodesk Inventor ® Professional Introduction.
PACS IIDR 01/02 Mar 2001 PACS  -ISVR 1  -ISVR Recommendations Introduction and Close-out A. Poglitsch.
PACS IHDR 12/13 Nov 2003 PACS FPU FPU Structure, Baffle and Straylight R. Graue, D. Kampf Kayser-Threde.
PACS IBDR, Garching 27/28 Feb 2002 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause J. Katzer (ZEISS) Max-Planck-Institut für Astronomie, Heidelberg.
PACS IHDR 12/13 Nov 2003 IBDR Close-out1 Close-out of IBDR Recommendations A. Poglitsch.
PACS INSTRUMENT HARDWARE DESIGN REVIEW CEA-Grenoble / DSM / DRFMC / SBT / HSO Cryocoolers/ PACS IHDR1 MPE - November, HSO SORPTION COOLERS Lionel.
THEMIS-SCM - PER THEMIS Instrument Suite PERSCM- 1 UCB, May 2, 2005 Search Coil Magnetometer Alain Roux, CETP.
PACS IQR ESTEC 13 January 2005 Mech Qual Status 1 PACS IQR Mechanical Qualification Status and Plans for PFM Reinhard Katterloher R. Graue, D. Kampf, R.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
THEMIS SCM CDR MC VASSAL - 3D PLUS CETP 04/08/ Preamplifiers in 3D Technology EM manufacturing Part list and component Lot Acceptance Tests FM manufacturing.
Presented by A.B. Galvin STEREO SWG NOAA Boulder, Co 22 March 2004 PLASTIC Activities.
Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt.
Compressor status AWAKE Technical Board meeting 19 August 2015.
PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array1/16 Ch. Hartinger / L. Barl Ge:Ga Detector Arrays.
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/ SPIRE & PACS SORPTION COOLERS.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
PACS IQR13 Jan 2005 Warm Electronics Qualification Status1 Martin von Berg PACS IQR.
GIST 24 Meeting GERB Hardware Status 14 th December 2005 Eric Sawyer.
PACS IIDR 01/02 Mar 2001 PACS Cryo Harness1 U.Grözinger, D.Lemke, R. Hofferbert Max-Planck-Institut für Astronomie Heidelberg Based on input data from.
PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
PACS SVR 22/23 June 2006 Test Campaigns1 Overview of PACS Test Campaigns Helmut Feuchtgruber MPE.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
PACS 12/13 November 2003 PACS PA/QA IHDR1 PACS PA / QA STATUS Documentation overview Cooperation with PA/QA responsibles -outlook- NCR Status System documents.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
Tecnologica Componentes Electrónicos, S.A. Workshop - Laser diodes in Space Slide No: 1 Date: May 11 – 12, 2006 Componentes Electrónicos, S.A. Juan Barbero.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
FIELDS Fabrication Review Board FRB SearchCoil Magnetometer SENSOR S/N 4 Ferrite cores cracks P. LEROY 1MMS SCM FRB, 20 APR 2012.
PACS IHDR12/13 Nov 2003 Warm Electronics1 Warm Electronics: Overview, Interfaces, Grounding and EMC Martin von Berg PACS IHDR.
IFU Management Meeting LAM – 15/10/04. Introduction (olf)
BSMIan Pain, UK ATC SPIRE Instrument Intermediate Design Review April 23, RAL 1 Beam Steering Mirror Sub-System IIDR Overview Ian Pain UK ATC Colin.
PACS IHDR 12/13 Nov 2003 Digital Processing Unit1/15 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixture for software 9th June 2009.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
SPP FIELDS DFB Quarterly November 21, 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board (DFB) 1.
ATHENA : the Advanced Telescope for High ENergy Astrophysics ‹n.› ATHENA Italian Team, Consitium Board meeting, Genova, 4 March 2015 STATUS OF CURRENT.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
Double Star meeting ESTEC 25/26 March Hardware Status Engineering breadboard fabricated to validate the FPGA concept – Using an ACTEL A1280 – Tested.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
PACS IHDR12/13 Nov 2003 Cryo Harness1 Cryo Harness, Test Cryo Harness Martin von Berg PACS IHDR.
Double Star: Experiment Activities
EFW DFB Systems Assurance
SPF MAG Quarterly Report – Feb 2015
Concept of ACSF TAN (Type Approval Number)
GLAST Large Area Telescope
First Stage Cryogenic IF Amplifier
Presentation transcript:

PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde

PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Board – Blue Detector

PACS IHDR 12/13 Nov 2003 PACS FPU Harness layout due to equal length of all detector modules Distribution Board – Red Detector

PACS IHDR 12/13 Nov 2003 PACS FPU EM Breadboard

PACS IHDR 12/13 Nov 2003 PACS FPU Rigid-flex boards Material –PCB: FR4 –Flexible Harness: Polyimide Layout shall be designed according to CNES QFT/SP.0019 Connectors: Cannon MDM B.... FR139 Capacitors: WIMA MKS 6,8 micro Farad, 50 VDC, 30 VAC Resistors: RNC 55 according to ESA SCC Distribution Board – Approved Design

PACS IHDR 12/13 Nov 2003 PACS FPU Distribution board test matrix

PACS IHDR 12/13 Nov 2003 PACS FPU Incoming inspection according to inhouse procedures Visual inspection (components, bonding points) Measuring machine Pin to pin continuity Insulation Cross talk ohmic resistance test PCB layout test against Gerber data (automated inspection protocol) Distribution Boards – Functional Verification Plan

PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards Functional Check Out Test Plan on FPU level Functional tests (prior and after cold vibration tests and during He temperature tests) –Complete detector chain operation required –Detection of Photoconductor signals (tbd by MPE) –Test operations controlled by COE (MPE-tbc) –Validation of signals by MPE (determination of nominal Photoconductor operation)

PACS IHDR 12/13 Nov 2003 PACS FPU PCB design completed Manufacturing data package completed ICD updated CQM components tested /screened/released by ESA (Resistors, capacitors, connectors) CQM Distribution Board –Status - Completed Tasks I Design, Documentation and Components

PACS IHDR 12/13 Nov 2003 PACS FPU EM Test board –Manufactured –Functional testing –Cryogenic cycling test (LN2) –Cryogenic vibration test (LHe) – Cryo STM test CQM Boards –PCBs Manufactured and under inspection (NCR wrt anomalies) PFM Boards –PCBs Manufactured and under inspection (see CQM) CQM Distribution Board –Status - Completed Tasks I Assembly

PACS IHDR 12/13 Nov 2003 PACS FPU CQM Boards –Assembly –Functional testing –Cryogenic cycling test (LN2) –Qualification testing of bookbinder fabrication technology –Documentation (Inputs for DP) –Distribution board delivery until PFM Boards –Asssembly and testing –Capacitor screening and distribution board delivery until Distribution Board –Status – Open Work and Schedule

PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards Cryo Qualification Test Matrix TestsPlanned Qualification Tests Performed BB Test Performed Cryo STM Test Comments Ambient simplified Functional Test prior / after Cold Vibration Test XX-KT provided stand alone test Cold Vibration Test (LN 2 or He) – (3 axes) X-X (He)MPE tests; mounted in Cryo STM (FPU) Thermal Cycling LN 2 XX-KT shock tests with 10 cycles Ambient functional tests after thermal cycling test (LN 2 ) XX-KT tests Thermal Vacuum Test (He)XXXMPE provided functional BB and CQM FPU tests Functional Test at cryogenic temperatures (He) XX-BB test provided by MPE with performance characterization  Distribution Boards are Cryo Vibration Qualified

PACS IHDR 12/13 Nov 2003 PACS FPU PFM Capacitor screening (Updated procedure) Verification test plan of PCB bookbinder technology manufacturing procedure in progress –Microscopic tests (e.g. cracks) –Thermal tests –Functional tests Distribution Board - Open Points

PACS IHDR 12/13 Nov 2003 PACS FPU FPU Harness Architecture

PACS IHDR 12/13 Nov 2003 PACS FPU Harness designed and approved Manufacturing data package released CQM/PFM Manufacturing completed CQM/PFM Hardware delivered and inspected ICD approved CQM harness under integration into FPU (CQM) Harness – CQM/PFM Procurement Status