C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) R. Foster January 3-4, 2008.

Slides:



Advertisements
Similar presentations
O T F O R D T O O L & G A U G E C O M P A N Y L I M I T E D The Design and Manufacture of Mini Applicators O T F O R D T O O L & G A U G E C O M P A N.
Advertisements

C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) Qalification/Functional Testing Bob Goeke January 3-4, 2008.
Watch the following video and answer the questions on your question sheet. Importance of Testing.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
BRC Food Safety Quality Management System Training Guide
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) MISSION ASSURANCE Brian Klatt January 3-4, 2008.
C osmic R Ay T elescope for the E ffects of R adiation Telescope Mechanical Design Albert Lin The Aerospace Corporation Mechanical Engineer (310)
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
From Research Prototype to Production
THEMIS F2/F3 IPSR and F4/F5 IPER 1 By Telecon, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW Thermal.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) MISSION ASSURANCE ACTIVITIES Brian Klatt September 10-11,
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Data Products & Production Pipeline Larry Kepko Boston University Center for Space Physics.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
C osmic R Ay T elescope for the E ffects of R adiation 6/27/06 Telescope Mechanical Design1 Albert Lin The Aerospace Corporation (310)
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) Installation Procedures/Orbiter Level Test Procedures Robert Goeke.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
C osmic R Ay T elescope for the E ffects of R adiation Mechanical Design CRaTER and the Electronics Assembly Matthew Smith Mechanical Engineer (617)
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) Environmental Test Planing Bob Goeke September 10-11, 2008.
24-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : ATLO Support Dave Curtis Mars Atmosphere and Volatile.
Photo-detector Tube Construction Laboratory Considerations Dean Walters Argonne National Laboratory.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) Project and Independent Review Activity R. Foster September.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
ASPERA-3 Feb. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 2_25/ Page 1 Monthly Status Report Report due 2/25/01 Schedule statused.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) Calibration Test Planning Justin C Kasper Smithsonian Astrophysical.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Composite Overwrapped Pressure Vessels
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
LAT Transport Container1 GLAST LAT Project8 September 2005 LAT Transport Container Design Review 8 September 2005 LAT Transport Container Design Review.
Art Nelson, Jr.AMS-02 Technical Interchange Meeting - JSC - January Ground Safety Status.
C osmic R Ay T elescope for the E ffects of R adiation June 27, 2005Larry Kepko - Data ProcessingPage 1 CRaTER Characterization Data Products & Production.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) Spacecraft I&T Mike Golightly September 10-11, 2008.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Thermal Analysis Huade Tan 6/27/05.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Shipment Review.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (PSR) Instrument Calibration Science Requirements Compliance Justin C Kasper.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
Ernest Sanchez Cargo Mission Contract (CMC) January 26, 2016 POIWG Face-to-Face #39.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
01.Oct.01 SPIRE BSM Product Assurance Team Briefing 1 BSM Product Assurance Plan Team Briefing & PA plan roll-out Ian Pain.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
C osmic R Ay T elescope for the E ffects of R adiation CDR v1 Telescope Mechanical Design Albert Lin The Aerospace Corporation Mechanical Engineer (310)
RAMI Paul Aden. RAMI Analysis Reliability Visual inspection during each shutdown Service schedule for necessary components Majority of components to have.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) Thermal Analysis Christine Cottingham LM/GSFC 545 Hume Peabody GSFC.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) Calibration Test Planning Justin C Kasper Smithsonian Astrophysical.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) Environmental Test Planing Bob Goeke September 10-11, 2007.
FIELDS MEP Thermal Vacuum Cycling iPER
Gayle K. Martin November 14, 2016
Technical Resource Allocations
FIELDS SCM Thermal iPER
PHI Status Report SO Cleanliness Working Group #24
CRaTER Pre-Environmental Review (I-PER) Programmatics Rick Foster
SDO Contamination Engineering Subsystem Mission PDR
Instrument Preliminary Design Review (I-PDR) September 28th, 2005
Solar Orbiter EUI Extreme UV Imager
CRaTER Pre-Ship Review (I-PSR) Instrument Configuration Bob Goeke
HMI Mission Assurance Manager
Integration and Test Organization Chart
How do you process 17,200 computers and 5,060 iPads in less than 7 weeks? Frank Spinelli July 10, 2012.
Instrument Preliminary Design Review (I-PDR) June 27th, 2005
GLAST Large Area Telescope
Presentation transcript:

C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) R. Foster January 3-4, 2008

C osmic R Ay T elescope for the E ffects of R adiation Contamination Requirements From LRO 431-PLAN Rev – –Cleanliness at delivery to LRO level = 450 A/2 Particulate (450) -> 0.14% Area Coverage Molecular (A/2) -> NVR Limit = 0.5 ugm/cm 2 –Outgassing TQCM deposition rate <5.0E-11 gm/cm 2 /sec CRaTER Project does not have a complete facility for making the contamination measurements. –Arranged with LRO Project to do the surface cleanliness certifications at GSFC as part of incoming inspection. Instrument will be cleaned to the needed level prior to leaving MIT and double bagged for shipment. In addition, the outgassing certification of the instrument will be done in a GSFC certification chamber if deemed necessary by LRO Contamination Engineers. –The CRaTER thermal chamber was instrumented with a TQCM, but does not have a cold plate operating doing the outgassing test, so the outgassing results cannot be directly compared to requirements. Accommodations are built into the instrument to allow for the planned weekly nitrogen purge of instrument during spacecraft I&T.

C osmic R Ay T elescope for the E ffects of R adiation Outgassing Test Results A TQCM was instrumented in the chamber used for CRaTER Thermal Cycle Testing Methodology Used –Unit was held at 10C above max operating (i.e. held at 35C). –TQCM was held at -20C. –Pressure in chamber was <1E-6 Torr. –No cold finger/scavenger plate was used. –Rates were determined after 5 hours –Deposition rate for each instrument was determined by the difference between chamber with and without instrument. For CRaTER SN2 –6.37E-11 gm/cm 2 /s 127% of specification For CRaTER SN1 –5.65E-11 gm/cm 2 /s 113% of specification Deposition rate was still nonlinear after 5 hours, so last hour rate was used Further vacuum bake out of unit is being completed.

C osmic R Ay T elescope for the E ffects of R adiation Shipping, Handling & Logistics The flight unit will be packed as follows: –Mounted to it’s handling fixture –Double bagged and nitrogen purged. –Put in it’s ruggedized Hardig shipping containers with custom foam cutouts. –The shipping containers will have shock watches affixed to the container and handling fixture. The flight unit will be transported by ground vehicle from MIT to GSFC by two members of the CRaTER Team (about an 8 hour drive from MIT to GSFC). Other CRATER GSE will also be transported at that time. After the instrument arrives at GSFC and moved to clean area, it will then await the arrival of CRaTER technical staff to arrive and perform a long form functional test using CRATER GSE. At the initial unpacking of the flight unit, LRO contamination engineers will verify that CRaTER meets it’s surface cleanliness requirements.

C osmic R Ay T elescope for the E ffects of R adiation Spares/Maintenance Plan The CRaTER Project completed and fully qualified a flight spare instrument. The CRaTER Project has a reasonably high fidelity engineering model for doing most of the instrument support functions, without having to rely upon the flight spare. The flight spare will be stored in the MIT flight materials bonded stock area in a double nitrogen purged bag, with desiccant and humidity monitors in the outer bag. After launch, then the PI will determine the disposition of the flight spare. Sufficient spare components exit to be able to repair a unit if desired in the case of a one off part failure (including a thick or thin detector), but the baseline plan would be to swap out the flight unit with the flight spare. CRaTER is a low maintenance instrument. It does have a weekly nitrogen purge requirement during spacecraft I&T levied on LRO I&T, but that is about it. There are no consumables or limited life items that need replacement between delivery and launch.

C osmic R Ay T elescope for the E ffects of R adiation