Ordinance Slide PHOTO 3: Deteriorated patch repairs and vertical cracks in brownstone.

Slides:



Advertisements
Similar presentations
MARPLE NEWTOWN SCHOOL DISTRICT FACILITIES. Maintenance & Small Projects Planned for Summer 2007 New carpet at Worralls office New fencing at Worralls.
Advertisements

Herriman City Engineering Department.  Herriman City has experienced tremendous growth over the last several years  Many new subdivisions and associated.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
Toronto District School Board Facilities Services Department North Toronto Collegiate Institute Status Quo.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). DWG. / PHOTO. NO. DATE:
Part I January 26, Income Pledges $150,000 47% Offering $33,200 10% Total$183,200 57% Endowment $75,452 24% Other funds $48,542 15% Total$123,994.
STRUCTURAL BASICS. Redundancy Redundancy Brittleness/ductility Brittleness/ductility Building dynamic behavior Building dynamic behavior Degradation of.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). SKETCH NO. REVISIONS Construction.
Arch 04 UNIVERSITY OF MINHO 0 Daniel Oliveira & Paulo Lourenço U N I V E R S I T Y O F M I N H O Barcelona, November REPAIR OF STONE MASONRY.
ARCHITECTURAL DESIGN STUDIO I ARCH 201
PHOTO. NO.DATE: 06/11/13 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P MAJOR MAINTENANCE FY 14.
Historic District Design Guidelines Workshop Continued from part 4.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
The Corporation of the Town of Amherstburg Public Works Department March 21, CAPITAL BUDGET.
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Inspecting Structure Prepared By: Marcia Belcher.
Studio of Conservation and Restoration Course Content Lecturer: M Sc Edlira Çoku.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
Freeman Athletic Center – Bacon Fieldhouse – North Elevation Scope, Typical for north, south and west elevations: Remove all existing horizontal and vertical.
Informational Meeting. The mortar joints have started to break down and shift Minor re-pointing was done in 2001, major re-pointing in 1985, work prior.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
Why We Should Expand. Progress  Earned $2,179,090 in the past 2 years  Money was put to bills, new supplies, and campers.
Engineering Presentation. Basic Soil Mechanics Soil type classification Gravel, sand, silt, clay Soil strength classification Granular soils (sand and.
Stenton Avenue Masonry Arch Rehabilitation Approaches to Historic Bridge Rehabilitation Case Study #1 Michael J. Cuddy, P.E. Principal Kara Russell Cultural.
Welcome To Astec Paint. Our Product Energy Star Heat Reflective Coatings Exterior Finishes Interior Finishes Texture Coatings & Acrylic Renders Roof Restoration.
Doors, Windows, and Roofs and Housing Exteriors. Doors 1. What is the purpose of a door? Entry Security Privacy Beauty Energy (heat and cold, in and out)
Professional Landscaping Company in Victoria, BC
Best Fireplace Service Company in Victoria BC
COURTHOUSE CLOCK TOWER CONDITION August 2017
Chejja.
Southern Lehigh School District
THE DEVON ENERGY AUDITORIUM
continued on next slide
A Presentation On Shoring, Underpinning and Scaffolding.
                                                                                                                                                                                                                                                
WESLEYAN P-3-1 MAJOR MAINTENANCE FY PINE STREET
continued on next slide
continued on next slide
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
VINYL SIDING / CARPENTRY SECTION EXISTING CONDITION PHOTOS
STRAW TOWER SUMMARY/EVALUATION NOTES LESSON
Progress Report 11/10/11.
Improvements for 2016 & 2017 Todd Harris Maintenance Manager
Steam Plant Rehabilitation Building and Smokestack
WESLEYAN P-4-8 MAJOR MAINTENANCE FY WASHINGTON STREET
WESLEYAN P-1-1 MAJOR MAINTENANCE FY CROSS STREET
WESLEYAN P-2-1 MAJOR MAINTENANCE FY CROSS STREET
Church Property Survey March is Church Beautification Month.
Heelan Construction Project
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-41-1 MAJOR MAINTENANCE FY AB HOME AVENUE
Garden City Public Schools Capital Reserve
WESLEYAN P-28-1 MAJOR MAINTENANCE FY WASHINGTON STREET


Masonry Bearing Walls.
SECTION EXISTING CONDITION PHOTOS
2018 – 2020 Budget| Presented by: Rick Bacon
WESLEYAN P-13-1 MAJOR MAINTENANCE FY HOME AVENUE
WESLEYAN P-23-1 MAJOR MAINTENANCE FY 16 63AB HOME AVENUE

WESLEYAN P-22-1 MAJOR MAINTENANCE FY 16 23A VINE STREET
Modified at -
WESLEYAN P-40-1 MAJOR MAINTENANCE FY HOME AVENUE
continued on next slide
continued on next slide
Presentation transcript:

Ordinance Slide

PHOTO 3: Deteriorated patch repairs and vertical cracks in brownstone.

PHOTO 6: Masonry bulge and displacement, bowing of masonry pier, and vertical cracking.

OPTION 1: Dismantle/demolish and rebuild the towers. Modify existing structure and roof to accommodate new towers. Complete masonry repairs to the remainder of the building.

OPTION 2: Dismantle / demolish the towers and construct new low roof areas over tower bases. Modify existing structure and roof to accommodate new lowered towers. Complete masonry repairs to the remainder of the building.

OPTION 3: Stabilize the existing towers, complete masonry repairs to the remainder of the building, and implement an ongoing exterior maintenance and repair program.

OPTION 4: Demolish the towers and building.

Repair Recommendations and Opinion of Cost