New Components Introduction (NCI) and Suppliers Selection. General Awareness Presentation Valentina Shirina GE Transportation June 22, 2011 Eskisehir.

Slides:



Advertisements
Similar presentations
AS9102 First Article Inspection Report
Advertisements

Figures in Chapter 1. Learning objectives After studying this chapter, you should be able to; Define logistics and supply chain management. Describe logistics.
Transition from Q1- 8th to Q1- 9th edition
Global Supplier Quality Manual PPAP Requirements
First Article Inspection Report
ISO 9001 : 2000.
Planning and Preparation for Export
Supplier SQM Participation. 2 | MDT Confidential What is SQM? Stands for Supplier Quality Managment –Formally referred to as SPACE and SPICE Is a system.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Chapter 41 Procurement and Supply Management. Chapter 4Management of Business Logistics, 7 th Ed.2 Material Management Electronic Procurement – e-Commerce.
Materials Management BUS 3 – 141 Quality and Specification Leveraging Technical Excellence Week of Aug 31, 2010.
Hazard Analysis and Critical Control Points
Chapter 41 Procurement and Supply Management. Chapter 4Management of Business Logistics, 7 th Ed.2 Learning Objectives Understand the role and nature.
Barry Murash MBBit Nortel 2007
First Article Inspection
PROCUREMENT AND SUPPLY MANAGEMENT
5-1 McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
Purchasing.
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Introduction to Software Quality Assurance (SQA)
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
From Research Prototype to Production
Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) Supplier Process Control.
Analyze Opportunity Part 1
ZHRC/HTI Financial Management Training Session 9: Stores and Supplies Management.
LSST Camera CD-3 Review Brookhaven National Laboratory, Brookhaven, NY LSST Safety Council Camera Review Bremerton, WA 2015 LSST Camera Environment,
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan The current qualification and verification.
5/28/2016Focus Tech Solutions1 Introduction of. 5/28/2016Focus Tech Solutions2 About Focus  Focus Tech Solutions provides inspection services to manufacturers.
Topic 9 – Global Logistics Strategies
Manufacturing Plant maintenance Materials management Quality management.
1 Project Management C53PM Session 3 Russell Taylor Staff Work-base – 1 st Floor
A JSJ Business APQP/PSO. A JSJ Business Purpose: To understand key concepts of the GHSP APQP and PSO process by reviewing the.
19-Feb-16 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
©© 2013 SAP AG. All rights reserved. Product Development Scenario Overview Open Legend Project Manager Scenario Description The following business roles.
Update of API Standards for Supply Chain Management API Standard 20J – Qualification of Distributors.
Component Sourcing - Overview AUGUST 2009 Citadel Industries - India.
November 6, 2013 Purchasing Controls & Supplier Quality Best Practices Beyond Compliance for the Medical Device Industry AdvaMed 2013 Bernie Liebler Technology.
External Provider Control
Production Part Approval Process
Process engineering Quality controls.
Part Approval / Compliance Data Submission via Jotform.com
Six Sigma Greenbelt Training
Final Rule for Preventive Controls for Human Food
Experience in Conformity Assessment of Products and Services  for Russian NPPs and Overseas Nuclear Power Plant New Builds Yury Meltsov Aug
Software Requirements
Procurement’s Impact on Logistics.
First Article Inspection
DSQR Training Supplier Quality Manual
DSQR Training Control Plans
Peer Review Agenda (Suggested).
Industrial Purchasing System A method used by businesses to buy products and/or services. A purchasing system manages the entire acquisition process, from.
Raytheon Parts Management
Global Supplier Quality Early Production Containment Training
GE 6757 TOTAL QUALITY MANAGEMENT
Product Development Scenario Overview
  Aptiv Global Supplier Quality Early Production Containment Training.
Lockheed Martin Canada’s SMB Mentoring Program
APQP Quality Planning in ISO 9000/ QS-9000 or ISO/ TS or .....
APQP PROCESS FLOW Prepare for APQP Plan and Define Program
MARKETING, PURCHASING AND PRODUCTION (7 - 9%)
First Article Inspection
Production Part Approval Process
Advanced Product Quality Planning 2nd Edition
Guide for successful completion of First Article Inspection Reports
Guide for successful completion of First Article Inspection Reports
Global Supplier Quality Early Production Containment Training
Advanced Product Quality Planning 2nd Edition
Presentation transcript:

New Components Introduction (NCI) and Suppliers Selection. General Awareness Presentation Valentina Shirina GE Transportation June 22, 2011 Eskisehir

2 GE Transportation/Dimitry Sevostyanov 17 September 2015 WHAT is NCI process and WHY GE follows it? NCI (New Component Introduction) – is a GE process to establish and statistically prove conformity of a component to a certain set of requirements (typically: specification and drawing), in other words, process designed to approve component for use in manufacturing of GE products. NCI Goals: –Components Quality …. Smooth operations –Cost out… avoidance of costs related to incoming inspection, deliveries shortages due to defects, inventory optimization –Mitigation of product/brand reputation risks…supplier accountability

3 GE Transportation/Dimitry Sevostyanov 17 September 2015 Phase 1: Working with Supplier (BEFORE SHIPMENT OF SAMPLES) GE: Establishes correctness and completeness of drawings and specification (supplier working docs); Conducts component risk assessment and prepares Validation Matrix; Conducts chemical materials verification CHECK DRAWINGS & SPECIFICAITIONS FOR ACCURACY & COMPLETENESS COMPONENT RISK ASSESSMENT & PREPARATION OF VALIDATION MATRIX CONDUCT CHEMICAL MATERIALS VERIFICATION Supplier: Prepares Process Flow Diagram (PFD), analyses potential manufacturing process and component failures ( Process FMEA – Process Failure Mode & Effect Analysis), prepares Characteristics Control Plan for CTQs Produces sample lot GE: Validates measurement system and performs 100% quality inspection of sample lot before its delivery to GE (First Article Inspection) DEVELOP RFD. PFMEA & CCP VALIDATE MEASUREMENT SYSTEM OBTAIN CERTIFICATE OF CONFORMITY AND CONDUCT FIRST ARTICLE INSPECTION

4 GE Transportation/Dimitry Sevostyanov 17 September 2015 Phase 2: Manufacturing Process Validation (AFTER SHIPMENT OF SAMPLES LOT TO GE) GE: Machinability Check (if applicable) Fit up Check (parts dimensional compatibility) Functional Test (individual component) Sub-system Test System Test Environmental Test Reliability and Growth Tests (Field Tests) Approval/Disapproval of NCI MACHNIABILITY CHECK FIT UP TEST FUNCTIONAL TEST SYSTEM AND SUBSYSTEM TESTS ENVIRONMENTAL AND RELAIBILITY TESTS FINAL NCI APPROVAL

5 GE Transportation/Dimitry Sevostyanov 17 September 2015 Phase 3: Post-NCI Monitoring Supplier: Upon approval for serial supply, continues to submit data to GE Process Capability Database for CTQ characteristics GE: Assesses data provided by supplier on on- going basis with goal to detect any process capability or process control deficiencies are established – this allows to defect issues on early stages; Requests suppliers to implement corrective actions in case process capabilities and/or process control deficiencies are identified UPDATE PROCESS CAPABILITY DATABASE VERIFY ACCEPTABILITY OF CAPABILITY AND PROCESS CONTROL TAKE CORRECTIVE ACTIONS IS NECESSARY UPON COMPLETION OF NCI NO CHANGES IN MATERIAL AND/OR PROCESS ARE ALLOWED. ANY PERMANENT CHANGE WOULD REQUIRE A NEW NCI.

Supplier Selection

7 GE Transportation/Dimitry Sevostyanov 17 September 2015 WHAT is Supplier Selection & WHY GE Follows It? Supplier Selection – process designed to find and approve new suppliers for products and services. Supplier Selection Benefits: –Minimization of risks of work with unreliable suppliers … quality, surety or supply and commercial competitiveness directly impact sales –Minimization of product reputation/brand risks … it takes years to create good reputation and just one minute to destroy it –Minimization of financial risks... financially unstable supplier may jeopardize customer’s orders execution –Better understanding of suppliers commercial & capacity capabilities... helping to reach “WIN-WIN” situation with supplier for long term

8 GE Transportation/Dimitry Sevostyanov 17 September 2015 Supplier Selection: Pre-screening (data provided by supplier) Financial Information: –Financial Statements –Loss/Benefits Reports –Reference Information on Major Customers –Results of Independent Financial Audit Commercial Information (examples): –Internet Access and Ability to Work on –line –Production /Process capabilities and certifications –Production Capacity (current and planned) –Logistics Capabilities (proximity to major transportation routes & terminals, warehousing) -Packaging Capabilities etc.

9 GE Transportation/Dimitry Sevostyanov 17 September 2015 Supplier Selection: On-Site Audit Compliance (examples): –EHS –IP protection –Compliance: to local & international law; readiness to adhere to GE Supplier Commitment –Management Integrity etc. General Assessment: - Operational Management - Quality Management System –Manufacturing and Engineering Technology, R&D Capability –Special Processes KNOW YOUR SUPPLIERS !

10 GE Transportation/Dimitry Sevostyanov 17 September 2015 Supplier Selection and NCI… One Process

11 GE Transportation/Dimitry Sevostyanov 17 September 2015 GE Transportation Global Sourcing Matrix Organization: Commodities X Poles >3,500 Global Suppliers ~ $1.5B Spend Globally Europe: Over 110 Qualified Suppliers (85 Active) 15 countries Supplier of Critical Parts and Assemblies to the business

12 GE Transportation/Dimitry Sevostyanov 17 September 2015 Europe: Key Commodities & Suppliers Established Supply: Engineered Systems: pumps, brake systems, heat exchangers, valves, Vibration dampers Bearings: ball & roller (in tamper) bearings Castings: large & mid size (1,000-8,000mt) steel & ductile iron; Al castings Forgings: large, mid, small size forgings (incl forged rings) Machined Parts: rough and fully machined castings and forgings New Opportunities: Fabrications, Electrical Parts, C-class (catalog parts) Looking Forward to Find New Suppliers!

Questions?

14 GE Transportation/Dimitry Sevostyanov 17 September 2015 THANK YOU !