Management Review October 2003.

Slides:



Advertisements
Similar presentations
Effectively applying ISO9001:2000 clauses 6 and 7.
Advertisements

ISO 9001:2000 Documentation Requirements
Transition from Q1- 8th to Q1- 9th edition
Environmental Management System (EMS)
Understanding the Requirements Qimpro Standards Organization
ISO 9001 : 2000.
EPSON STAMPING ISO REV 1 2/10/2000.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Corrective & Preventive Action Programme l Corrective and preventive action managed by one programme l Closely linked to the internal audit programme l.
1 Quality Management Standards. 2 THE ISO 9000 FAMILY ISO 9000: 2005 Identifies the fundamentals and vocabulary for Quality Management Systems (QMS) ISO.
The ISO 9002 Quality Assurance Management System
Quality Management System
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
ISO 9001:2000 Intro Presented By: Brad D. Agenda Overview of QMS Fundamentals ISO 9001:2000 Overview & Requirements.
ISO 9000 Certification ISO 9001 and ISO
4. Quality Management System (QMS)
Instructions and forms
4. Quality Management System (QMS)
ISO 9000 Introduction Imran Hussain.
Welcome ISO9001:2000 Foundation Workshop.
The Value of Using the Process Approach for Internal Auditing Frank Sidorowicz TL 9000 Program Director Orion Registrar, Inc.
Fundamentals of ISO.
An Overview of the International Quality Management Standard
OAS REGIONAL PROJECT QUALITY MANAGEMENT. What percentage of time in the work day do you have to devote to solving PROBLEMS? - ours or someone else´s (suppliers,
Ships in Service Training Material A-M CHAUVEL QMS Terms & Definitions 2009.
13th &14th July 2010 Gaelle Rousseau-Lamour
Quality Management System
WHAT IS ISO 9000.
Quality Management Systems P.Suriya Prakash Final Mech Vcet
ISO STANDARDS TRAINING & CONSULTING
1 European Conference on Training Strategies Kieran Cox -NSAI Education & Promotion-
Introduction to ISO New and modified requirements.
ISO 9000 and Public Awareness and Information Session 22 February 2006 Owen Glave, MBA-TQM.
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
Introduction to ISO 9001:2000.
ISO 14001:2004, Environmental Management System
October SYS 1 Quality Audit and ISO9000 Quality Standard Kinnison, Chapter 17.
ISO 9001:2008 to ISO 9001:2015 Summary of Changes
1 Implementing a Business Management System compliant to ISO 9001:2000.
a guidance to conversion
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
AET0012PPT by Dr. Anwar El-Tawil Dr. Anwar El-Tawil Director ISO Programme for Developing Countries QUALITY MANAGEMENT SYSTEM ACCORDING TO.
QUALITY MANAGEMENT STATEMENT
ISO, QMS & CIR Awareness 2013.
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
ISO 9001:2000 The 5 Phase Plan to Implementation Sterling, VA Terry & Associates Quality.
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
The common structure and ISO 9001:2015 additions
Unit-5 Introduction to IS/ISO 9004:2000 – quality management systems – guidelines for performance improvements. Presented by N.Vigneshwari.
The Second Annual Medical Device Regulatory, Reimbursement and Compliance Congress Presented by J. Glenn George Thursday, March 29, 2007 Day II – Track.
Internal Auditing ISO 9001:2015
QUALITY MANAGEMENT SYSTEM
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
1 Quality Management Z SUZSANNA E SZTER T ÓTH R ITA D ÉNES Department of Management and Corporate Economics 1 March 2016.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
UNDERSTANDING ISO 9001:2008.
ISO/IEC
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
Fundamentals of ISO.
UNIT V QUALITY SYSTEMS.
Quality Management Systems – Requirements
ISO 9001:2008 Quality Management Systems
How to conduct Effective Stage-1 Audit
ISO 9001:2008 – Key Changes NOTE: use of this webinar depends on the instructor/speaker using the text in the notes of the slides!! Examples and speaking.
Nonconformity Writing
Presentation transcript:

Management Review October 2003

5.6 Management Review Review Inputs: Follow up from previous mgt reviews Results of audits (ALL) Customer Feedback Process Performance & Product Conformity Status of preventive and corrective actions Changes that could affect the QMS Recommendations for improvement

Follow up from previous mgt reviews We will maintain 1% as our next 6 months RMA goal. Kyle to update goal on charts Open customer CAR stands at 8 and will need to be actively reviewed and followed through. Kyle and Christy to review Instead of reporting in fiscal week such as 3303, we will begin to report in week ending date such as 08/16/03. Kyle to update charts Bev requested that we report our internal audit finding details in our next management review meeting. Christy added in Mgt. Review for Oct. We need to come up with a way to report supplier score card. This is to combine our quality and on-time delivery performance so we can send it to our supplier on a regular basis. Christy Issued a Preventive Action Request

Results of audits Open audits With no Corrective Action: During Audit it was noticed the Final Assembly Area has no area/container identifying rejects that are found during test process. Observed in Electronics' Area was shelves with product haphazardly placed no trays. A pallet with suspect packaged material in middle of work area without identifiable paperwork or labels. Noticed in all mentioned Areas poor identifiable labeling technique on product throughout various stages in process and location. In Shipping area observed also were boxes on floor without any label or identifying paperwork. This was corrected during audit. Observation : Certain records have been transferred from hard paper copies to electronic media. Quality record matrix has not been updated. Could not find any evidence that prototype feedback form was being used . Doc. W90460018 recommend if not being used update matrix. During interview asked to show record of W90260004 First Article /laylot Request. Interview concluded that this form was not being used in the process. Recommend that if this form is not being used to be dropped from Quality Record Matrix.

7.4 Purchasing Finding: No records of evaluation on Suppliers that have a “Grandfathered” status. Procedure W90620002 rev. D States in (Step # 2, bullets 1 and 2) Short form will be used for minor level of procurement needed – bullet 2 states- the detailed form will be used for major levels of procurement Finding: No criteria in place for the re-evaluation of suppliers. Comments: Currently only tracking top dollar suppliers. Finding: No Records of evaluation of suppliers of Unisys product. Finding: No evidence or records available that subcontractors performing calibration of inspection, test and measuring equipment affecting product quality have been approved for the performance of this service. Observation: No formal process in place to issue supplier corrective action or how to preclude the use of disapproved suppliers

7.4 continued Requirement 4.1 General Requirements: and 7.4.2 Purchasing Information (see above) Where an organization chooses to outsource any process that affects product conformity with requirements, the organization shall ensure control over such processes. Control of such outsourced processes shall be identified within the quality management system.   Finding: Methods of control for any outsourced processes such as embossing or calibration need to be identified in the quality manual (see 4.2.2) or other documentation such as purchasing information.

7.4 continued Requirement 7.4.2 Purchasing Information Purchasing information shall describe the product to be purchased, including where appropriate a) requirements for approval of product, procedures, processes and equipment, b) requirements for qualification of personnel, and c) quality management system requirements.   Finding: No evidence that adequate information covering these requirements is being flowed down to suppliers of calibration services, especially in regards to ISO9001 7.6 a) requirement “Where necessary ensure valid results, measuring equipment shall… a) be calibrated or verified at specified intervals, or prior to use, against measurement standards traceable to international or national measurement standards; where no such standards exist, the basis used for calibration or verification shall be recorded;.” No evidence that requirements are flowed down to calibration supplier to allow compliance to requiring calibration “…against certified equipment having a known valid relationship to internationally or nationally recognized standards.”

Closed Findings…. Customer satisfaction survey is not being utilized. 1) No project timeline is established to track progress of new/revised design as specified in procedure W90410011 2) Product Specification Form is not used all the time as specified in the same procedure 3) Prototype feedback report is not used as described in procedure W90420016 The electronic file for Customer Communication is not kept up to date. 1) Current procedure and practice do not clearly define who is required to approve what kind of document. 2) Documents of external origin are not being controlled Observations: 1) An update to the Quality Policy could provide a more meaningful statement. 2) Lack of any formal Preventive Actions indicates a 'reactive' rather than 'proactive' organization. Under section 4.1.b the sequence of interactions was not documented; Under section 4.1.f there was no documented improvement plans; Under 4.2.1.c there was no document for preventive actions, Under section 4.2.2.c the quality manual did not describe the interaction between the processes of the quality management system

Internal Audit Summary Need process approach Corrective Actions need to be issued via the CAR System Not all audit findings are clear or valid Need a Gap of the 94’ vs. 2000 standard Robust follow up process

CHECKLIST FOR A PROCESS AUDIT Inputs What triggers the process ? What inputs are required ? Where do the inputs come from ? Are they received in a timely manner ? Are they fit for purpose ? Process What are the process steps ? What happens at each process step ? What documents and/or records are generated ? Is the process implemented as described in procedures, instructions or plans ? Are controls applied as described ? Have the activities been carried out by the responsible people ? Outputs What is the product or service produced by this process ? Are product measures in place to ensure that product meets requirements ? How are processes measured ? Are product and process measures achieved ? What feedback is received from internal or external customers of the process ? Controls How is the process defined ? Who is responsible for the process and how is their responsibility and authority defined ? What statutory and regulatory requirements apply ? What are the customer requirements and how are they defined ? What are the product/service specifications and how are they defined ? What objectives and targets are relative to this process ? What controls/check points are there ? What acceptance criteria exists ? Mechanism Equipment What equipment and resources are required to complete the process ? Is equipment suitable and maintained ? People What are the competence requirements for the activities ? Is there evidence that people are suitably trained ? Effectiveness Checks What is the purpose of the process ? How does it impact on the customer/downstream processes and activities ? Is there evidence that quality objectives and targets affected by this process are being achieved ? Where will the impact of the effectiveness of the process be felt ? Where might failures of this process be identified ? CHECKLIST FOR A PROCESS AUDIT

Surveillance Audit – Oct 23rd & 24th Other Audits Supplier Audits- None with US suppliers Customer Audits – Unisys has given IDS an “Approved Supplier Status” Surveillance Audit – Oct 23rd & 24th ISO FYI Flyer given out on paychecks (Oct 16th) Suggest awareness training on the new 2000 standard Suggest “News Letter” with contest and updates/ changes on the QMS. (This will also help us comply with element 5.5.3 Internal Communication)

Mutually beneficial supplier relationships Supplier Quality ISO 9000:2000 Para 0.2-h Mutually beneficial supplier relationships An organization and its suppliers are interdependent and a mutually beneficial relationship enhances the ability of both to create value.

Open Supplier CAR’s By Week

Supplier CAR Closure Cycle Time

Individual Supplier Quality Performance

Supplier Ontime Delivery

Supplier Ontime Delivery

Supplier Quality Performance

Customer Feedback ISO 9000:2000 Para 0.2-a Customer Focus Organizations depend on their customers and therefore should understand current and future customer needs, should meet customer requirements and strive to exceed customer expectation.

RMA Percentage Returns By Month

Total RMA Dollar Amounts By Month

RMA Dollar Amounts By Business Type

RMA Closure Cycle Times

Customer CAR’s Open By Week

Customer CAR’s Closure Cycle Time

Process Performance & Product Conformity ISO 9000:2000 Para 0.2-d Process approach A desired result is achieved more efficiently when activities and related resources are managed as a process

MDN’s Incoming Inspection By Week

MDN’s Inprocess By Week

Scrap Dollar Amounts By Month

Changes that could affect the QMS ISO 9000:2000 Para 0.2-C Involvement of People People at all levels are the essence of an organization and their full involvement enables their abilities to be used for the organization's benefit.

Training Follow Up Effectiveness of Action Taken: Although the corrective action has been complete, opportunities still exist between what is currently taking place and what is documented in internal procedures and ISO 9000 2000.   Opportunities are as Follows: 1.) Requirement: ISO9000:2000 clause 6.2.2 Competence, awareness and training “The organization shall…..para e) maintain appropriate records of education, training, skills and experience. Internal Requirements: Procedure W91810008 rev F “Personnel Training Records” states in step # 3 ….”OJT Checklist should be appropriately filled out and signed by the Trainer when training is completed. The Trainer should forward the forms to the HR department or designate for inclusion in the employee’s training record” Nonconformance: No records of job specific training (OTJ) currently being maintained in the employees folder by HR. Observation: The OJT Performance Checklist (W91840004) only covers tasks performed in basic assembly. No other OJT checklist could be found. 2.)Requirement: ISO9000;2000 clause 6.2.2 Competence, awareness and training “The organization shall…para c) evaluate the effectiveness of actions taken” Internal Requirements: None Nonconformance: No objective evidence that training is evaluated for effectiveness.

Training System Improvement MONITOR 4. Evaluate training outcomes 1. Define training needs 3. Provide the training 2. Design and plan training Employee surveys Internal Audits Process monitoring Training evaluations Performance Reviews Identify each process area Identify “Critical To Quality” points Create core competencies based on the above (IPC Training/ ESD) Define other non-process specific training (QMS training/awareness) Training plans by process area OTJ Checklist Liaison from Doc Control to the affected personnel on procedure changes Competence based training modules Certification test/demos 1st day training Create awareness training modules Provide the Training Cross training Training request Create training matrix Maintain records

Which of the following is most likely to cause good employees to quit their jobs? Source: Robert Half International, Menlo Park, CA / ASTD Training Magazine, June 2002

Output of mgt review ….Input to the Continual Improvement Process…. The output from the management review shall include any decisions and actions related to a) improvement of the effectiveness of the quality management system and its processes, b) improvement of product related to customer requirements, and c) resource needs. Output of mgt review ….Input to the Continual Improvement Process….