PROJECT MANAGEMENT PROJECT MANAGEMENT. PLANNING - PROGRESS.
PPAP Requirements Training
Qualification for Brazing
First Article Inspection Report
SUBSAFE Approved for Public Release
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
QMS Documentation Click the mouse to advance slides and animations in this slide show…
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Comments to Manufacturing QA documentation
Crab Cavities EDMS *new* node Carlo Zanoni EN-MME-EDM.
Supplementary Training Modules on Good Manufacturing Practice
Quality Assurance/Quality Control Policy
Requirements for Manufacturing Readiness: (Beamtube Assembly only)
NIOWAVE Requirements for Manufacturing Readiness: (Beamtube Assembly only) Due 1 month before start of manufacturing for CERN approval.
QC | Slide 1 of 16 June 2006 Good Practices for Quality Control Laboratories P art 4: Inspecting the laboratory Supplementary Training Modules on Good.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
First Article Inspection
NIOWAVE Requirements for Manufacturing Readiness: (Beamtube Assembly only) Due 1 month before start of manufacturing for CERN approval.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
6.1 Using AMO After this class, you will be able to: Install AMO
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
HL-LHC Quality management
1. QualityControl QualityManagement Before even today Standard: CSA Z Examples Petrobrás Dow Química Beginning: October 1992 ISO 9001 BVQI.
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
CERN, 4th of December 2014 Crab cavities - comments on documentation from Niowave1 #RequirementsComments 1Niobium material samples according to Section.
HL-LHC Configuration Management Keywords : HW Baseline, Naming, Parameters, Layout DB, Change Control The HiLumi LHC Design Study (a sub-system of HL-LHC)
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
Documentation Traceability and documentation is required.
Documentation review: Beam tube assembly Comments given by CERN to the technical file submitted by Niowave prior to release for fabrication 16/10/20141.
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
C. Parente (HL-LHC Technical Quality Officer) Date:
12/2/2004Module 2A1 The NCSX Engineering Web – An Overview Part I Work Planning, Project Files, Management Plans and Procedures.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Metal Fabrication Quality and conformity of our products 2015.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
ASME BOILER & PRESSURE VESSEL CODE AN INTERNATIONAL STANDARD
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
HL-LHC Crab Cavity Review Debriefing Comments from LARP June 30, 2014.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Review of the processes released in the framework of the MMP Goran Perinić.
ELENA Documentation and Data Management Items, Assets, Functional Positions T. Birtwistle EN-ACE-CL With input from T. Krastev EN-ACE-EDM.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 - NbTi-Nb transitions for the extremities (Clé et Bords droites): DESIGN OF THE WELDING CONFIGURATIONS & SAMPLES FOR TESTING AND QUALIFICATIONS: - Tuning.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
LCLS-II Prototype Vacuum Vessel (VV) and Helium Gas Return Pipe (HGRP) FDR Planned Quality Control Effort (QC) Ken Premo 12/04/14.
11T Quality Assurance O. Housiaux, R. Berthet, S. Menu, R. Principe 3rd International Review on the 11T dipoles at collimator Section for the HL-LHC 6-8.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Crab Cavity Technical Coordination meeting:
Lessons learnt from CERN experience
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
Preparation of functional/engineering specifications for HL-LHC
Strategy for conformity of non-standard cryogenic equipment
Crab Cavities Contribution from the U.S.
Cutting and welding First internal LHC Dipole Diode Insulation Consolidation Review 10 Oct 2017 G. Favre / A. Amorim Carvalho G. Favre EN-MME.
CERN Engineering Specification
Cutting and welding First internal LHC Dipole Diode Insulation Consolidation Review 10 Oct 2017 G. Favre / A. Amorim Carvalho G. Favre EN-MME.
The MTF adjusted system to meet Vacuum Group needs
Thomas Otto, TE Department, CERN
First Article Inspection
First Article Inspection
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement Bare Cavities Fabrication Manufacturing and Inspection Plan Hector Garcia Gavela (DG-DI) Paula Freijedo Menendez (EN-MME), Marco Garlasche (EN-MME), Carlo Zanoni (EN-MME)

Index Requirements for Bare Cavities MIP/MTF Comments to the documents Example (HOM) Summary 2

3 Bare cavities Minimum requirements defined on the 1 st version of the specification (EDMS # ) Next Steps: Detailed design, Manufacturing and Testing Baseline documentation for each item/asset* to be provided at each stage Bare cavity *Item = a system part of a project Asset = a realization of an item. An item generates one or more assets (number of pieces to be produced)

Engineering Specification Requirements 4  MATERIAL AND FILLER METAL CERTIFICATES. TRACEABILITY SHEET  WPQR: Welding Procedure Qualification Record  WOPQ: Welding Operator Performance Qualification  WPS: Welding Procedures Specification  WELDING MAP & WELDING BOOK: Only identification for each weld to keep the traceability with WPS & tests performed.  MANUFACTURING PROCEDURES (Whenever required in our E.S Annex 6.3)  TEST PROCEDURES (Whenever required in our E.S Annex 6.3)  EB WELDED SAMPLES: CERN request a duplicate of every test coupon used for qualification purposes.  NDT PERSONNEL QUALIFICATIONS  MIP (Manufacturing & Inspection Plan): list of all manufacturing and quality control operations.  QC REPORTS generated after quality checkings

Manufacturing and Inspection Plan (MIP) Detailed Manufacturing Steps for Bare Cavities production Quality Controls to be performed during manufacturing 5 Follow-up the production Keep track of Inspections Records of verifications Identification of Deviations Further identification after installation

From MIP to MTF List of Quality Controls to be performed during the manufacturing process All QC Reports generated for each asset during the production will be stored in MTF (Repository of manufacturing data) Depends on the nature of the manufacturing step/quality control (Hold point or Notified point) the supplier can or can not continue with the next fabrication step 6 List of quality controls performed on the asset Step documents (control/test reports, NCR)

Review of actual document 7 This is the workflow for Bare Cavities Production not a Manufacturing and Inspection Plan Some steps of the workflow (fabrication or quality controls either) are not clear enough Lack of traceability between fabrication steps and the applicable drawings or referenced document Applicable standards to be followed as well as procedures need to be defined by supplier Manufacturing and Inspection Plan to be issued prior to manufacturing

Review of actual document 8

9 Example - HOM Couplers Visualizing the steps and the names makes it possible to anyone to easily follow the production steps

Example - HOM Couplers All Fabrication steps + All QC verifications are identified 2- Manufacturing and Inspection Plan (EDMS # ) Sequence of Quality Controls defined MTF Folder

Summary Workflow is a complementary document of the MIP but cannot replace it Traceability between the manufacturing or quality steps and reference drawings/documents Selection of Standards by supplier Definition of procedures by supplier 11

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement