Presented to: 2012 Pacific Aviation Director’s Workshop, Guam By: Juan S.A. Reyes, A.C.E., ACSI Date: March 13-15, 2012 Federal Aviation Administration.

Slides:



Advertisements
Similar presentations
Part 139 Training 1.
Advertisements

Marin County Emergency Medical Services Excellent Care – Every Patient, Every Time Marin County Multiple Patient Management Plan Training Module June 2013.
WASHINGTON FIRE SERVICES RESOURCE MOBILIZATION PLAN 2013 VERSION
FAA Office of Airports Airport Fuel Storage and Handling
Airport Emergency Plan - Overview
Visual 8.1 Course Summary Unit 8: Course Summary.
Incident Command System
NERT College Disaster Operations Disaster Operations - ICS Command Staff Workshop Refer to Field Operations Guide, Chapter 5.
Visual 3.1 Unified Command Unit 3: Unified Command.
Chapter 29 Mass-Casualty Incident Management. Chapter 29: Mass-Casualty Incident Management 2 Discuss the various environmental hazards that affect the.
King County MCI Tasks & Tactics
National Space-Based Positioning, Navigation, and Timing (PNT) Federal Advisory Board DHS Challenges & Opportunities Captain Curtis Dubay, P.E. Department.
11 In Partnership with:. 2 Program Overview l Extent of the Problem l Planning, Multi Agency Communication, Coordination & Response l Legal & Regulatory.
Spring 2008 Campus Emergency Management Program Overview
Incident Command System Basic Course
Roles and Responsibilities Local Agencies and Responders.
FIRE DEPARTMENT ORGANIZATION State of Georgia BASIC FIRE FIGHTER TRAINING COURSE.
Unit 3: Command & Control IC/IMT Interface
Drill of the Month Safety Officer’s Role March 2010 Maryland Fire and Rescue Institute.
HAZWOPER Overview.
4 Incident Command System. 4 Objectives (1 of 2) Describe the characteristics of the incident command system (ICS). Explain the organization of the ICS.
Educational Field Services 30 CFR Part CFR Part Training Responsible Persons Emergency Evacuations.
Evgeny A. Gorbunov, General Director, Union of Aviation Industrialists
National Incident Management System. Homeland Security Presidential Directive – 5 Directed the development of the National Incident Management System.
Management Program Update 2012 Pacific Aviation Director’s Workshop
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
Emergency Action Plans Miriam Gradie Anderson Planning Specialist 608/ Wisconsin Department of Natural Resources.
IS-700.A: National Incident Management System, An Introduction
ATO Western Service Area
Chapter 3 Interfacing with EMS and Other Medical Personnel.
Module 1: Orientation to ICS
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
INTERMEDIATE: SFFMA OBJ – – hrs credit received.
Presented to: 2012 Pacific Aviation Director’s Workshop, Guam By: Juan S.A. Reyes, A.C.E., ACSI Date: March 13-15, 2012 Federal Aviation Administration.
Aviation Accident Reporting and Investigation AST 425 Airport Manager’s Guide.
Lake Forest Emergency Plan Part II POST EVENT PROCEDURES.
APPROVED TRAINING MANUAL’S LESSON PLANS AND COURSEWARE STAR MARIANAS AIR, INC. Recurrent – Flight Crew Part I – Basic Indoctrination Section 1 – Operator.
The Incident Command System
Federal Aviation Administration Advisory Circular 150/5370-2F Operational Safety on Airports During Construction Presented to: Eastern Region 35 th Annual.
INCIDENT COMMAND SYSTEM (ICS)
Focus Points Airport Layout Plan (ALP) Overview ALP Guidance
IS-804: ESF #4 – Firefighting Firefighting
Presented to: By: Date: Federal Aviation Administration 2012 ACA Annual Conference David F. Cushing, Manager, LAX-ADO Wednesday, September 11, 2013 Construction.
Effectively Managing Transit Emergencies. Nature of Emergencies and Disasters Overview What Is an Emergency? What Is a Disaster? Differences What Is Emergency.
ASSURANCE PINNACOL ASSURANCE Wants you to know about : EMERGENCY/DISASTER PREPAREDNESS.
Bernards Township Office of Emergency Management February 28, 2012.
Visual 6.1 Incident Resource Management Unit 5: Incident Resource Management.
National Incident Management System
UNCLASSIFIED As of W Mar 08 Mr. Scott A. Weidie, J722 1 Multinational Planning Augmentation Team (MPAT) 04 March 2008 Governments and Crises: Roles.
Northeast Colorado All Hazards Region 1 Mass Casualty Incident Plan Training Section 8 – Roles & Responsibilities.
3 Rescue Incident Management. 3 Objectives (1 of 4) Describe the characteristics of the Incident Command System (ICS) and the functions of positions within.
Disaster Planning Workshop Hosted By: Pleasantview Fire Protection District.
Introduction to SEMS and Basic ICS. Goals of Training Basic Understanding: The California Standardized Emergency Management System (SEMS) in place to.
13-1 n Chapter 13 –Entry Team Leader Haz Mat Incident Considerations.
Site Control Instructional Goal The participant will see the need for a well-planned site control program and will experience some of the decision making.
NATIONAL INCIDENT MANAGEMENT SYSTEM Department of Homeland Security Executive Office of Public Safety.
Finance and Administration Developed Using The CAP-USAF Pamphlet 12 and CAP ES materials 6/7/2016NESA 2012 phm1.
DSHS Deployable Teams. Deployable Teams 2011 Medical Incident Support Team - M-IST Ambulance Staging Manager - ASM Ambulance Strike Team Leader - ASTL.
Fireground Operations: Structure Fires Union County SOG 3.16.
Emergency and Disaster Response to Chemical Releases National Incident Management System (NIMS) Incident Command System (ICS) Module 9.
Introduction to the Emergency Operations Center City of Santa Cruz 2011 EOC Training and Exercise.
Developing Local and Regional Incident Management Teams Bob Koenig Incident Management Team Coordinator Texas Forest Service.
Emergency Preparedness. Proposed Emergency Preparedness Rules NFR/LMC §19.326(a) deleted and moved to § for Emergency Preparedness Rules Places.
Family Assistance. Family Assistance Legislative Background Aviation Disaster Family Assistance Act of 1996 Foreign Air Carrier Family Support Act.
Large-Scale Incident Management
Maryland Fire and Rescue Institute
AIRLINE TRANSPORTATION AERO 4100 / 5100
IS-700.A: National Incident Management System, An Introduction
Unit 3 Overview This unit introduces you to the Incident Command System (ICS) Functional Areas and roles of the Incident Commander and Command Staff.
Unit 8: Course Summary.
Presentation transcript:

Presented to: 2012 Pacific Aviation Director’s Workshop, Guam By: Juan S.A. Reyes, A.C.E., ACSI Date: March 13-15, 2012 Federal Aviation Administration Water Rescue Plan Honolulu Airports District Office

Federal Aviation Administration Water Rescue Plan March 13-15, 2012 Wildlife Hazard Management Plan2 FAR (b), Airport Emergency Plan Each Certificate Holder must develop and maintain an Airport Emergency Plan designed to minimize the possibility and extent of personal injury and property damage.

Federal Aviation Administration Water Rescue Plan March 13-15, 2012 Wildlife Hazard Management Plan3 The plans required by this section must contain instructions for a response to a Water Rescue situation.

Federal Aviation Administration Water Rescue Plan March 13-15, 2012 Wildlife Hazard Management Plan4 FAA Advisory Circular 150/ C, provides the Certificate Holder with standards, practices, and Recommendations to comply with Water Rescue situations as appropriate and acceptable to the Administrator. FAR Part 139 certificated airports and airports that have received federal grant-in-aid assistance must use these standards.

Federal Aviation Administration Water Rescue Plan March 13-15, 2012 Wildlife Hazard Management Plan5 AC 150/ C This AC incorporates lessons learned as a result of the National Transportation Safety Board (NTSB) investigations. It also contains updated sources of information about water rescue from the United States Coast Guard (USCG). Because of jurisdictional or logistical reasons, an airport operator may need to develop a water rescue plan that consists of a written mutual aid agreement identifying an entity to act as the Primary Response Agency.

Federal Aviation Administration Water Rescue Plan March 13-15, 2012 Wildlife Hazard Management Plan6 Such agreements are typically coordinated by the local Civil Defense, Emergency Management office, Harbor Rescue/Patrol, etc.

Federal Aviation Administration Water Rescue Plan March 13-15, 2012 Wildlife Hazard Management Plan7 A water rescue plan may also contain additional signed agreements with private entities such as; Tug operators, Ferries, Marina Facilities, Helicopter Services, Heavy Equipment Companies, Boating and Dive Club Organizations.

Federal Aviation Administration Water Rescue Plan March 13-15, 2012 Wildlife Hazard Management Plan8 Even when the airport operator Is Not the primary response agency, It has the responsibility for implementing the airport emergency plan in accordance with FAR Part and insuring that appropriate rescue agency/agencies are formally notified of the possibility of an aircraft accident/incident where there is a significant body of water.

Federal Aviation Administration Water Rescue Plan March 13-15, 2012 Wildlife Hazard Management Plan9 A body of water or marshland is significant if the area exceeds one-quarter square mile and cannot be traversed by conventional land rescue vehicles. Some airports have large detention ponds on airport property. In many cases, these ponds are in proximity to the runway and of sufficient size and depth to create a significant hazard to an aircraft which may enter the pond. The emergency plan should include all significant bodies of water and marshlands located within at least 2 miles of the end of an airport runway which cannot be traversed by conventional and rescue vehicles, including detention ponds. What Is a significant Body of Water

Federal Aviation Administration Water Rescue Plan March 13-15, 2012 Wildlife Hazard Management Plan10 Rescue operations between rescue personnel on the water and on land must be coordinated to ensure that survivors are brought to a designated area on shore for triage, decontamination, and surface transportation.

Federal Aviation Administration Water Rescue Plan March 13-15, 2012 Wildlife Hazard Management Plan11 Accountability and tracking of rescue personnel and survivors is an essential component of the water rescue plan coordination. Rescue personnel should be monitored through a NIMS compliant accountability system, utilizing accountability tags or another method that is harmonized with all response agencies. A system to maintain accountability of survivors should also be established and adopted for use by all agencies involved.

Federal Aviation Administration Water Rescue Plan March 13-15, 2012 Wildlife Hazard Management Plan12 Airport Certificate Holder’s must be mindful of maintaining its ARFF index for continued air carrier operations at the airport to support the water rescue efforts, allowing for medical evacuation, air transport of equipment, Recovery/Go Team operations and other potential needs as may be necessary.

Federal Aviation Administration Water Rescue Plan March 13-15, 2012 Wildlife Hazard Management Plan13 Command and Control during the Rescue Operation. If other agencies, particularly the Coast Guard or local Harbor Patrol, perform rescue operations, the airport operator will need to establish communications on a marine radio frequency with the primary response agency.

Federal Aviation Administration Water Rescue Plan March 13-15, 2012 Wildlife Hazard Management Plan14 Water Rescue plans are currently being updated at some of our Pacific Island airports, with the remaining airports already having had plans in place requiring annual review of MOA/MOU’s, exhibits and any diagrams or maps. All plan updates must be forwarded to the FAA for approval prior to its implementation.

Federal Aviation Administration Water Rescue Plan March 13-15, 2012 Wildlife Hazard Management Plan15 The Water Rescue plan must include at least the following: 1.Description of nearby bodies of water 2.List name, address, and telephone numbers of each water rescue response organization 3.Notification of jurisdictional authority(s) (IC), based on location of incident 4.Availability and method of deploying floatation devices. 5.Hazardous materials, pollution containment. 6.Personnel recall 7.Security, Traffic and access control 8.Emergency Medical Services (EMS) 9.Airline Responsibilities/Family assistance

Federal Aviation Administration Water Rescue Plan March 13-15, 2012 Wildlife Hazard Management Plan16 The Water Rescue plan must include at least the following: 10. Procedures protocol for deceased 11. Mutual aid agreements between airport, each response agency, private companies i.e. boat fleets /ferries/water shuttles/dive clubs 12. Air Traffic Control Tower (ATCT) role 13. Specific fuel decontamination 14. Locations for mobilizing personnel, equipment, staging areas 15. Rescue boat facilities & locations. Limitations weather, tide, access roads. 16. Establish specific docking/landing areas onshore. Considerations for this location, flexible float heights, ambulance staging, and road access

Federal Aviation Administration Water Rescue Plan March 13-15, 2012 Wildlife Hazard Management Plan17 Any Questions